In the Name of God Hami Pasargad Kish Petroleum and Refining - - PowerPoint PPT Presentation

in the name of god hami pasargad kish petroleum and
SMART_READER_LITE
LIVE PREVIEW

In the Name of God Hami Pasargad Kish Petroleum and Refining - - PowerPoint PPT Presentation

In the Name of God Hami Pasargad Kish Petroleum and Refining Company Introduction The oil industry as a pioneer economy has a special and basic role in advancing major objectives of the national economy of the IRI Iran in the next 20


slide-1
SLIDE 1

In the Name of God

slide-2
SLIDE 2

Hami Pasargad Kish Petroleum and Refining Company

slide-3
SLIDE 3
  • The oil industry as a pioneer economy has a special and basic role in

advancing major objectives of the national economy of the IRI Iran in the next 20 years horizon being the motivating engine of national economy, promoting economic diplomacy of IRI Iran, ensuring national security through developing cooperation and regional & international interactions. It is undeniable that it has a share of 28% in GDP, 84% in foreign exchange earnings and more than 95% in supplying primary energy of the country.

  • The oil industry is one of the main advantages of Iranian economy and it

has a major part of the total state budget, so it is appropriate by relying on

  • il industry, while maintaining state budget independence from oil

revenues, provide stable economic development.

  • Iran by reserving more than 154.58 Billion barrels of coverable liquid

hydrocarbons and 33.62 Trillion cubic meters of coverable natural gas is

  • ne of the major countries in supplying the world’s energy.

Introduction

slide-4
SLIDE 4
  • The study on oil sector indicates that the growth of this

industry in various areas has been achieved which this shows the signs of future success and will be promising in the future years.

  • In this regard in order achieve resistance economy

emphasized by our supreme leader and in order to avoid raw retail in the sector of oil and gas condensates,Hami Pasargad Kish Oil & Refining Company was established at 2013.

  • This company will be active in the main fields of energy

sector which includes oil & gas upstream and downstream , refineries , petrochemical , power , renewable energies and trade and commerce.

  • This company intends to establish a potent and network

share holding including of various companies for recovering the domestic and foreign opportunities in the field of energy sector investment.

slide-5
SLIDE 5

Project Introduction

Constructing a Complex with the capacity of 25,000 barrels of Gas Condensates at Assalouyeh

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8

Project’s Products

slide-9
SLIDE 9
slide-10
SLIDE 10

Project’s Economical Indicators

slide-11
SLIDE 11

Item Subject Description Unit 1 Amount of Investment in USD 45 Million USD 2 Amount of Working Capital 30 Million USD 3 Total Amount of Investment (Static & Working) 75 Million USD 4 Total Cost of Prouducts per Year 264.5 Million USD 5 Income of Products Sales per Year 303.5 Million USD 6 Products Sales Annual Profit Prediction 39 Million USD 7 Payback Period Of Capital 2.5 Years 8 Rate of Payback Period(IRR) 34% Percentage

slide-12
SLIDE 12

Breakdown of Product’s Selling Price

slide-13
SLIDE 13

Item Products Products Incomes (USD Per Year)

1 Gasoline 76,500,000 2 Gas oil 112,625,000 3 Naphta 81,000,000 4 Liquid Gas & Low Density Ones 33,375,000

slide-14
SLIDE 14

Process and Technical Issues

slide-15
SLIDE 15
  • This process is done as a fractional distillation and according

to the analysis (from feed) which has been specified at the laboratory heat is applied on the initial feed and according to the analysis the required products are extracted in certain temperatures .In this system the control on extracted products are in control of the operator which could apply for changes

  • n the type of products and volumes by changing the points of

compliances.

  • In this refining method three factors of temperature , pressure

and fracture has been used and special catalysts will be used for the mean of quality improvement and also the fuel usage

  • f units will be supplied from this system. Liquid gas and low

density gases which are produced by this system around 24 Tonnes per day will be used as fuel.

Process

slide-16
SLIDE 16
  • The distillation unit is as BATCH which in this method by

changes in temperature, distillation is carried out and more volume of required products could be derived and also in this system considering the easiness and abundant of performance, the variety of products are plenty because the distillation and boiling point of material are various and since the temperature control is the operator’s authority all the required and designated products could be produced.

  • The quantity of 10 distillation towers with the capacity of

2500 barrels in three working shifts have been designed.

Distillation Unit

slide-17
SLIDE 17
slide-18
SLIDE 18
  • Heat is applied on the reactor directly with

fireproof systems and the produced temperature leads to different boiling points which refines the feeds.

Feed’s Method of Heating

slide-19
SLIDE 19
  • The distillation duration of one refining unit

BATCH is six hours and also the duration between two refining units BATCHES is two hours.

Distillation Duration of Each BATCH and the Duration between two BATCHES

slide-20
SLIDE 20
  • Crude oil and gas condensates consist of mercaptan

and sulfur which in this method mercaptan, sulphides , thiophenes and their derivatives are separated in two ways .

  • 1)

With the use of chemicals

  • 2)

With the use of required catalysts

Desulfurization Unit

slide-21
SLIDE 21

Analysis of Feeds Obtained from Gas Refineries of South Pars Phases

slide-22
SLIDE 22
slide-23
SLIDE 23

Location of Project

Askari Village – Assalouyeh City

slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27

Terrestrial Connections

  • Lengeh Port– Bushehr : Links Assalouyeh

to the country’s main highways.

  • Jam – Firouzabad highway
  • Parsian Highway :Substantially reduces the

distance of Assalouyeh to Shiraz

  • Subsidiary ways also exist connecting all

villages in this area.

Terrestrial Connections

slide-28
SLIDE 28

Air Distances

Air distance of project’s area from Kish Island is 170 KM, Chabahar 850 KM and Imam port 621 KM. The distance between this area to Bandar Abbas is 570 KM and to Tehran is 1200 Km.

Air Distances

slide-29
SLIDE 29
slide-30
SLIDE 30

Proceedings

slide-31
SLIDE 31
  • Technical / Economical feasibility studies.
  • Completing records in the Special Economic Energy Zone.
  • Applying consultants to conduct market studies, environmental studies, technical / economics

studies etc.

  • Holding meetings in the level of management and expert and presenting project in the
  • perating banks in the line of obtaining facilities and preparing preliminary dedicated facilities

for manufacturing refinery complex.

  • Organizing Steering Committee’s project by presentation of Chairman and Managing Director
  • f the Prison’s Cooperative Foundation in the regular meetings.
  • Identifying contractors and consultants.
  • Extracting estimation of building’s construction, leveling and consolidation, fencing, road

building, equipment foundations ...

  • Having negotiation with the owners of technical knowledge and receiving technical and

financial proposals.

  • Expert visiting and investigating from land’s project and Holding meetings with local

authorities.

  • Purchasing 10 acres of land at the cost of 40 billion IRI Rials in the public area of Assalouyeh -

Askari

  • Enclosing land and completely consolidating the land’s ownership in the region.
  • Holding tender, selection of an EPC contractor and making contract with contractors for the

project’s process sector.

  • Complete enclosing and preparation of land for mobilization of workshop.
slide-32
SLIDE 32

Item Phase Activity Situation

1

Phase Zero

Obtaining the license of gas condensate feed

DONE

Execution of Technical / Economical feasibility studies

DONE

Obtaining Project's approval at the board of ………..

DONE

Execution of organization structure and company registration

DONE 2

Phase One

Purchase of land

DONE

Fencing and enclosing the land

DONE

Preparing basic drawings and general plan of construction

DONE 3

Phase Two

Contract with consultant of designing and contractor of the process sector

In progress

Land preparation and workshop mobilization

In progress

Detailed drawings preparation

NOT DONE

Holding tender procedures

NOT DONE 4

Phase Three

Contract with contractors

NOT DONE

Implementation of convention

NOT DONE

Temporary delivery ( test and commissioning )

NOT DONE 5

Phase Four

Operation

NOT DONE

slide-33
SLIDE 33

Obtaining feed’s permission

slide-34
SLIDE 34

هاگشیلباپ تیاس

slide-35
SLIDE 35

یداهنشیپ هیلوا ییامناج

slide-36
SLIDE 36

یرادرب هشقن

slide-37
SLIDE 37

یرادرب هشقن

slide-38
SLIDE 38

یشک سنفنیمز

slide-39
SLIDE 39

نیمز یشک سنف

slide-40
SLIDE 40

نیمز یشک سنف

slide-41
SLIDE 41

قربیناسر

slide-42
SLIDE 42

یناسر قرب

slide-43
SLIDE 43

یناسر قرب

slide-44
SLIDE 44

و حیطستهاگشیلباپ تیاس ژلبگر

slide-45
SLIDE 45

هداج زا حیطست یرگسع یاتسور یلصا هداج ات یسرتسدهبهاگشیلباپ

slide-46
SLIDE 46

ژلبگر و حیطست

slide-47
SLIDE 47

یرادا تقوم نامتخاس

slide-48
SLIDE 48

یرادا تقوم نامتخاس

slide-49
SLIDE 49

یرادا تقوم نامتخاس

slide-50
SLIDE 50

یرادا تقوم نامتخاس

slide-51
SLIDE 51

یرادا تقوم نامتخاس

slide-52
SLIDE 52

سنارت1250رپمآ تلو ولیک

slide-53
SLIDE 53

ینیچ راوید

slide-54
SLIDE 54

ینیچ گنس

slide-55
SLIDE 55

یزیر هسام

slide-56
SLIDE 56

یزیر نتب

slide-57
SLIDE 57

یرادا تقوم نامتخاس تلکسا

slide-58
SLIDE 58

یرادا تقوم نامتخاس تلکسا

slide-59
SLIDE 59

یرادا تقوم نامتخاس تلکسا

slide-60
SLIDE 60

یرادا تقوم نامتخاس

slide-61
SLIDE 61

یرادا تقوم نامتخاس