in the Lindis Catchment Tonight: 1. Aims / shift of focus 2. - - PowerPoint PPT Presentation

in the lindis catchment
SMART_READER_LITE
LIVE PREVIEW

in the Lindis Catchment Tonight: 1. Aims / shift of focus 2. - - PowerPoint PPT Presentation

Integrated Water Management in the Lindis Catchment Tonight: 1. Aims / shift of focus 2. Groundwater and its connection to the river 3. Potential social & economic impacts on community 4. Issues & aims - panel discussion Where to


slide-1
SLIDE 1

Tonight:

  • 1. Aims / shift of focus
  • 2. Groundwater and its

connection to the river

  • 3. Potential social &

economic impacts on community

  • 4. Issues & aims - panel

discussion

Integrated Water Management in the Lindis Catchment

slide-2
SLIDE 2

Where to from here...

Next Meeting – May 2011 Consultation paper (draft) Notify proposed plan change

– mid September 2011

RMA process Changes put into effect

  • Suggested management regime
  • Costs and benefits
  • Other options
slide-3
SLIDE 3

Lindis Alluvial Ribbon Aquifer

  • Effective from April 2010 (PC1C)
  • Implications
  • GW takes within aquifer are managed

as surface water

  • GW takes are included in primary

allocation

  • Takes are subject to surface water

restrictions i.e. minimum flows and rationing

  • Permitted taking for domestic and

stock water are excluded

slide-4
SLIDE 4

Sources of water

  • Current availability of water:
  • Lindis River (fully allocated)
  • Lindis Alluvial Ribbon Aquifer (fully allocated)
  • Ardgour Valley allocation zone (depends on

location)

  • Clutha River (allocation available)
  • Tarras allocation zone (allocation available)
  • Bendigo allocation zone (allocation available)
  • Need to management all these sources

together - interconnected