IN INNOVATION TION SQ SQUARE ARE PHA HASE SE II II Boston Employment Commission: Special Presentation Wednesd ednesday y Sept ptem ember ber 16, 2020 Consigli Construction Co., Inc. | Related Beal | Boston Planning & Development


  1. IN INNOVATION TION SQ SQUARE ARE PHA HASE SE II II Boston Employment Commission: Special Presentation Wednesd ednesday y Sept ptem ember ber 16, 2020 Consigli Construction Co., Inc. | Related Beal | Boston Planning & Development Agency

  2. Innovation Square Phase II Project Quick Facts ■ Innovation Square is a 375,000 sq. ft. research and development life science campus comprised of two buildings situated in Boston’s Marine Industrial Park. ■ The second of two phases, includes the construction of a 269,000 sq. ft. four-story structure that will house four floors of office and lab space for Vertex Pharmaceuticals, as well as a below-grade, 45-space parking garage.

  3. The project site is part of a long-term ground lease Duration/Completion: Core/Shell construction agreement with the Economic Development and began in August 2019 and is scheduled for Industrial Corporation (EDIC) of Boston. Vertex completion in August 2021. Vertex interior fit-out Pharmaceuticals has signed a lease for 100% of began in August 2020 and is scheduled for the building. Innovation Square Phase I was completion in February 2022. completed in April 2019 and is also 100% leased 269,000 square foot core/shell laboratory and Cost: Core & Shell $110 Million office development with one level of underground parking located at 316-318 Northern Avenue in Vertex Interior Fit-Out $120 Million Boston’s Seaport District Innovation Square Phase II Project Facts

  4. Innovation Square Phase II: Project Facts THE BUILDING WILL THE BUILDING’S THE PROJECT WILL RESILIENCY EFFORTS BE COMPRISED OF A ROOFTOP WILL BE BE BUILT IN WILL INCLUDE THE STEEL FITTED WITH ACCORDANCE WITH USE OF A PORTABLE SUPERSTRUCTURE MECHANICAL BOSTON’S CLIMATE FLOOD-PROTECTION WITH PENTHOUSES, CHANGE BARRIER SYSTEM ARCHITECTURAL GARDENS AND PREPAREDNESS AND CONSTRUCTED OF PRECAST CONCRETE SOCIAL SPACE RESILIENCY MARINE-GRADE AND CURTAIN WALL OVERLOOKING THE REQUIREMENTS AND LAMINATE PANELS FAÇADES AND WATERFRONT. LEED GOLD THAT OFFER RAPID SUPPORTED BY 16” CERTIFICATION DEPLOYMENT CONCRETE PILES STANDARDS. AROUND THE AND GRADE BEAMS. BUILDING WITHIN HOURS OF A PENDING FLOOD EVENT.

  5. Boston Residents Jobs Policy Consigli/Related Beal has a BRJP requirements/goals is Subcontractor’s BRJP historical As a standard practice, dedicated Diversity/ included in all subcontracts. reports are reviewed prior to Consigli/Related Beal specifically Community Outreach Manager on awarding contracts, to help set discusses the BRJP employment the project team. expectation and mitigate any standards with all subs prior to their foreseen participation shortfalls. contract award . All subcontractors are provided with the BRJP pre-construction package. Prior BRJP is an agenda item at our weekly subcontractor and to attending the preconstruction meeting the subcontractor provides owner meetings where the projects actual goals and Consigli/Related Beal with their contact responsible for their workforce onsite concerns regarding workforce are discussed and their contact responsible for submitting weekly reports.

  6. Committed Subcontractors to Date ■ RF Roach – Selective Demolition / Site Enabling & ■ NER Construction – Masonry Sitework/Excavation ■ SOEP-Specialty Insulation Group – Insulation ■ EM Duggan – Plumbing & HVAC ■ Greenwood Industries – Roofing ■ Northeast Automatic Sprinkler – Fire Protection ■ Collins Overhead Door – Overhead Doors/Loading Equipment ■ Prime Steel – Structural Steel / Precast Erection ■ Thompson Door – Doors/Frames/Hardware ■ G&C Concrete – Concrete ■ New England Finish Systems – Drywall & Rough Carpentry ■ JK Glass Company – Aluminum/ Interior Glass & Glazing ■ Select Paint – Painting ■ McDonald Electrical – Electrical ■ American Anchor – Window Washing Equipment ■ Otis Elevator – Elevators ■ AquaFence – Deployable Flood Barrier ■ Brand Safway – Hoist ■ Allan Construction – Acoustical Ceiling ■ Heritage Restoration – Waterproofing & Joint Sealants ■ Specialty Services of New England – Specialties ■ Ryan Ironworks – Miscellaneous Metals ■ Brightview – Landscaping & Site Improvements ■ RicMor Construction Inc. – Fireproofing ■ Allegheny Contract, Inc. - Flooring

  7. INNOVATION SQUARE PHASE II BOSTON EMPLOYMENT COMMISSION: SPECIAL PRESENTATION SEPTEMBER 16TH ,2020

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.