IMPL E ME NT AT ION OF E SMF (2013- 014) CAPACIT Y BUIL - - PowerPoint PPT Presentation

impl e me nt at ion of e smf 2013 014
SMART_READER_LITE
LIVE PREVIEW

IMPL E ME NT AT ION OF E SMF (2013- 014) CAPACIT Y BUIL - - PowerPoint PPT Presentation

IMPL E ME NT AT ION OF E SMF (2013- 014) CAPACIT Y BUIL DING: T wo Days T raining Wo rksho p o n E nvironme nta l & Soc ia l a nd Soc ia l Ma na g e me nt F ra me Work (E SMF ) in Gujra nwa la wa s org a nize d on


slide-1
SLIDE 1

IMPL E ME NT AT ION OF E SMF (2013- 014)

CAPACIT

Y BUIL DING:

T

wo Days T raining Wo rksho p o n E

nvironme nta l & Soc ia l a nd Soc ia l Ma na g e me nt F ra me Work (E SMF ) in Gujra nwa la wa s org a nize d on 24- 25 F e b 2014

Orie ntatio n Se ssio ns with MD, WASA, Dire c to r

E ng ine e ring WASA and De puty Dire c to rs/ XE N, WASA Gujranwala

T

raining se ssio ns he ld with c o ntrac to rs in Gujra nwa la o n 05 May 2014

slide-2
SLIDE 2

PROGRE SS OF YE AR 1 F UNDS & PROCURE ME NT PL AN OF YE AR 2

WASA GUJRANWAL A

2

PUNJAB CIT IE S GOVE RNANCE IMPROVE ME NT PROJE CT

slide-3
SLIDE 3

PROGRE SS OF YE AR 1 F UNDS

slide-4
SLIDE 4

SUMMARY OF F Y 2013- 14

4

TOTAL FUNDS RELEASED 195.066 Million Amount Used For 19 Schemes 79.02 Million Amount Consumed For Power Generation 100.852 Million Total Amount Consumed (to date) 179.872 Million Balance 15.194 Million Total Number Of Schemes 19 Completed Schemes 13 In Progress Schemes 6

Total ADP Schemes Total EEP’s Schemes Application

  • f ESMF

Categorization of Schemes

30 % of schemes Targe Achiev (%) E-2 for EEPs schemes E-3 for EEPs schemes E-3 for ADP schemes 10 19 19 06 13 Nil 08 66%

ESMF

slide-5
SLIDE 5

N O NAME OF SCHE ME E XPE NDIT URE ST AT US

1 Repair and general overhauling of 5 sludge pumps (10 cusec) discharges each zone III 8.393 Completed 2 Repair of general overhauling of 15 cusec pump at Khiali disposal station zone II 2.151 Completed 3 Replacement of delivery pipes and other works at disposal stations Alam Chowk, no. 1 garjakh, mughal pura and liaqat chowk lift station zone iii 3.554 Completed 4 Repair/const. Of additional manhole chambers and gully grating at papular nursery, amir park, shaheen abad g.T road, civil line, wahdat colony, peoples colony, arfat colony and farid town in zone I 1.443 In Progres 5 Replacement of sewer lines and construction of additional manholes at katcha khiali road, takia masoom shah, gala mehar bagoo wala, mehar noor wala, darbar qadria and allied areas zone II 1.910 In Progres 6 Replacement of old sewer lines in dhullay, shaheenabad and gurunanak pura i/c of

  • const. Of additional manholes in zone III

4.596 In Progres 7 Desilting of sewer lines with winching machine along jinnah road from d.C road under pass to purani abadi jagna 2.988 Completed

5

SCHE ME S OF F Y 2013- 14

slide-6
SLIDE 6

NO NAME OF SCHE ME T OT AL E XPE NDIT URE ST AT US

8 Mechanical desilting of sewer lines through winching machine at bajwa road, hafizabad road and paru road 2.785 Completed 9 Mechanical desilting of sewer lines through winching machine at hafizabadroad and gondalanwala road 2.465 Completed 10 Repair of utility vehicles 4.858 Completed 11 Restoration of water supply network street no. 32 "y" block peoples colony and repair of 21 nos. Water works zone I 5.201 In Progress 12 Restoration of water supply network and renovation of 22 nos. Water works zone II 3.975 In Progress 13 Restoration of water supply network along g.T road small state no. 1 and renovation of 19 nos. Water works zone III 5.297 In Progress 14 Repair of generators 2.193 Completed

6

SCHE ME S OF F Y 2013- 14

slide-7
SLIDE 7

NO NAME OF SCHE ME T OT AL E XPE NDIT URE ST AT US

15 Rehabilitation of drain along G.T Road Easternside and dc road zone I 2.381 Completed 16 Rehabilitation of drain along western bypass from Alam Chowk to awan chowk and g.T road zone II 6.232 Completed 17 Rehabilitation of strom water drainage from general bus stand to 30ft bazar shaheen abad zone III 2.898 Completed 18 Manhole covers and frames 7.000 Completed 19 Articles for sewerage & water supply 8.700 Completed

7

SCHE ME S OF F Y 2013- 14

slide-8
SLIDE 8

APPL ICAT ION OF E SMF

E nvironme nta l a nd Soc ia l Sc re e ning : E nviro nme ntal and So c ial Sc re e ning o f E E Ps and ADP Sc he me s was c arrie d o ut. E nvironme nt a nd Soc ia l Ma na g e me nt Pla ns: Pre pare d E nviro nme ntal and So c ial Manag e me Plans (E SMPs) fo re ac h sc he me o f E

  • 2 c ate g o ry

E

PA, Punjab ac c o rde d appro vals o f the se E SMPs

E

SMP c o st was inc lude d in Pro c ure me nt plan

slide-9
SLIDE 9

APPL ICAT ION OF E SMF (CONT I… .)

E nvironme nta l a nd Soc ia l Monitoring :

Mo nito ring T

e am (Do , E nviro nme nt, DO, So c ial We lfare , E

  • nv. & So c ial Safe g uard Spe c ialist & Mo nito ring

and E valuatio n Spe c ialist), and fo c al pe rso ns c o nduc te d e nviro nme ntal and so c ial mo nito ring o f E

  • 2 sc he me s

Mo nito ring was c o nduc te d with the he lp o f c he c klists. Site visits, pho to g raphic re c o rds, public c o nsultatio n at

e ac h ste p, L ab analysis and de ve lo pme nt o f mo nito ring re po rt)

slide-10
SLIDE 10
slide-11
SLIDE 11

Applic a tion of E SMF (Conti… .)

T

hird Pa rty Va lida tion:

F

  • r an inde pe nde nt asse ssme nt o f the E

SMF imple me ntatio n, was he ld in Gujranwala o n 3-5 July 2014. T PV te am visite d fo llo wing 06 sc he me s

  • f WASA-G.

1.

Restoration of water supply Network along G.T Road Small State No 1 and Renovation of 19 Nos water works Zone-III.

2.

Replacement of sewer lines and Construction of Additional Manholes at Katcha Khiali Road, Takia Masoom Shah, Gala Mehr Bagoo wala, Mehr Noor wala, Darbar Qadria and allied areas Zone-II.

3.

Replacement of old sewer lines in Dhullay, Shahenabad and Gurunanak Pura i/c of Construction of Additional Manholes in Zone-lll

4.

Restoration of water supply Network Street No. 32 "Y" Block Peoples Colony and Repair of 21 Nos water works Zone-I.

5.

Restoration of water supply Network and Renovation of 22 Nos Water Works Zone-II.

6.

Repair / Construction of Additional Manhole Chambers and Gully grating at Popular Nursery, Amir Park, Shaheen Abad G.T Road, Civil Line, Wahdat Colony, Peoples Colony, Arfat Colony and Farid Town in Zone-l

slide-12
SLIDE 12

PROGRE SS ON YE AR 2013- 14

T a rg e t

Imple me nta tion of E

SMF

  • n 30 % of sc he me s of WASA,

Gujra nwa la

Ac hie ve me nts:

Total ADP Schemes Total EEP’s Schemes Application of ESMF

Categorization of Schemes

30 % of schemes Target Achieved (%) E-2 for EEPs schemes E-3 for EEPs schemes E-3 for ADP schemes

10 19 19 06 13 Nil 08 66%

slide-13
SLIDE 13

Work pla n for imple me nta tion of E SMF F OR 2014- 015

DATE / WEEK/ MONTH ACTIVITIES TASKS DELIVERABLES TEAM INVOLVED August 07, 2014 Final and approved List of PCGIP Schemes for fiscal year 2014-015 Coordination with WASA officers for list of PCGIP Schemes for fiscal year 2014-015 Approved Schemes list ESSS August 27, 2014 to August 30, 2014 Environmental and Social Surveys of PCGIP Schemes identified for fiscal year 2104-015

  • Site Visits of Schemes
  • Interviews of locals/ inhabitants
  • Interviews of community members
  • Focus Group Discussions
  • Record of observations on Env. &

Social Screening Forms

  • Public Consultation Forms
  • Pictorial Views
  • Filled and dully

signed Public Consultation Forms

  • Information and

Data DO (Environment), S Safeguard Speci ESSS, M& E, Speciali and Concerned XEN/D September 1, 2014 to September 04, 2014 Environmental and Social Screening

  • Environmental and Social Screening of

PCGIP Schemes

  • n

the basis

  • f

Environmental and Social Survey results,

  • Environmental and Social Screening of

ADP Schemes to meet targets Environmental and Social categorization

  • f WASA. Schemes.

Filled and signed Environmental and Social Screening DO (Environment), S Safeguard Specialist, E and Focal Person

slide-14
SLIDE 14

September 6, 2014 ESMP Cost Calculation of ESMP cost, so that this can be included in procurement plan of PCGIP Schemes for fiscal year 2014-015 Procurement plan in which ESMP cost will be included Social Safeguard Specialist & ESS and Concerned XEN/DD of WASA September 08, 2014 to September 13, 2014 ESMPs Preparation and Review of ESMPs Reviewed ESMPs ESMPs will be prepared by ESS SSS. ESMPs will be reviewed by Sr. E and DO, Environment September 15, 2014 to September 20, 2014 Approval of ESMPs Coordination and follow up for approval of ESMPs from EPA, Punjab Approved ESMPs DO, Environment, Sr. ESSS and E October 2 2014 (Subject completion

  • f bidding process)

Site Handing Over Documents Undertaking

  • n

Site Handing Over Documents from WASA concerned Officers and Contractors for implementation

  • f

Mitigation Measures proposed in ESMPs Dully signed Site Handing Over Documents ESSS, SSS, M& E, Specialist. and Concerned XEN/DD for WASA Projects 2nd and 3rd week of October, 2014 Trainings Trainings of WASA-G, Officers and Contractors for implementation of ESMPs. Training of Officers and Contractors ESSS, SSS, M& E, Specialist, concerned officers/officials of WAS and Contractors

slide-15
SLIDE 15

April 06-7, 2015 02- days Experience sharing workshop in Gujranwala Experience sharing with WASA Officers regarding implementation of ESMF Execution of workshop Sr, ESSS, ESSS and Safeguard Spe 1ST week of October, 2014 and 2nd week of June, 2015 Environmental Analysis Environmental analysis/ laboratory tests (Before and after Scheme execution)

  • f

Environmental parameters given in ESMPs.

  • Lab. Test Reports

Concerned XEN/D, WASA ESSS Contractors November 2014 to June, 2015 (During Schemes Execution) Environmental and Social Monitoring Environmental and Social Monitoring

  • f E-2 Category Schemes of WASA-

G Environmental and Social Monitoring Reports DO (Environment), Social Safegua Specialist, ESSS, M& E, Specialis and Concerned XEN/DD, WASA 1st report

  • n

September 2, 2014, 2nd

  • n January 2,

2015 and 3rd on May 2, 2015 Submission of Quarterly progress reports Quarterly progress reports Submission regarding implementation

  • f ESMF will be submitted to

to Sr. ESSS after 03 months Progress reports ESSS May 13, 2015 to May 15, 2015 Third Party Validation (TPV) (2014-015) Independent assessment of the ESMF implementation in WASA Schemes TPV Reports TPV team. DO (Environment), Safeguard Spe ESSS and M& E, Specialist

slide-16
SLIDE 16

PROCURE ME NT PL AN F OR F Y 2014- 15 (PCGIP)

16

slide-17
SLIDE 17

17

TOTAL SHARE (ESTIMATED) 230 Million AMOUNT ALLOCATED FOR 19 SCHEMES 164 Million AMOUNT ALLOCATED FOR POWER GENERATION 66 Million TOTAL NUMBER OF SCHEMES 19

SUMMARY of F Y 2014- 15

slide-18
SLIDE 18

NO NAME OF SCHE ME COST

1

REPAIR & MAINTENANCE OF WATER SUPPLY LINES AND RENOVATION OF OVERHEAD RESERVOIRS AT LIAQAT BAGH, PEOPLES COLONY AND TUBE WELL NO. 05 IN ZONE I 15.498 Million

2

MECHANICAL DESILTING OF SEWER LINES BY WINCHING MACHINE IN ZONE I 15.541 Million

3

REPAIR OF TURBINE PUMPS 3.8 Million

4

REPAIR & MAINTENANCE OF KHIALI OVERHEAD RESERVOIR AND RESTORATION OF WATER SUPPLY LINES IN ZONE II 9.489 Million

5

RESTORATION OF WATER SUPPLY NETWORK IN ZONE III 9.7492 Million

6

REPLACEMENT / REHABILITATION OF RCC SEWER LINE IN ZONE I 5.350 Million

7

REPLACEMENT / REHABILITATION OF SEWER LINES IN ZONE II 5.345 Million

18

SCHE ME S OF F Y 2014- 15

slide-19
SLIDE 19

NO NAME OF SCHE ME COST

8

REPLACEMENT / REHABILITATION OF SEWER LINES AND CONSTRUCTION OF ADDITIONAL MANHOLES IN ZONE III 4.583 Million

9

REPAIR OF NON CLOGGING CENTRIFUGAL PUMPS IN ZONE I, II AND III 4.6 Million

10

REPLACEMENT OF DELIVERY PIPES AND REHABILITATION OF DISPOSAL STATIONS AT SARFARAZ COLONY, NOWSHERA SANSI AND KHIALI IN ZONE II 8.716 Million

11

REHABILITATION OF DISPOSAL STATIONS AT ALAM CHOWK NO. 02, MUGHAL PURA, RAJKOT AND ZAHID COLONY IN ZONE III 9.889 Million

12

REPAIR OF UTILITY VEHICLES 8.747 Million

13

MECHANICAL DESILTING OF SEWER LINES BY WINCHING MACHINE IN ZONE II 7.401 Million

14

MECHANICAL DESILTING OF SEWER LINES BY WINCHING MACHINE IN ZONE III 8.565 Million

19

SCHE ME S OF F Y 2014- 15

slide-20
SLIDE 20

NO NAME OF SCHE ME COST

15

REHABILITATION OF DRAIN AT TEHSIL ROAD AND G.T ROAD IN ZONE I 9.464 Million

16

REHABILITATION OF DRAIN AT G.T ROAD (WESTERN SIDE) IN ZONE II 9.847 Million

17

REHABILITATION OF DRAIN AT G.T ROAD AND HAFIZABAD ROAD IN ZONE III 8.114 Million

18

MANHOLE COVERS AND FRAMES 9.861 Million

19

SUPPLY OF O & M ARTICLES FOR SEWERAGE AND WATER SUPPLY 9.441 Million

20

SCHE ME S OF F Y 2014- 15