Heerema Simulation Center IMCA Ivan van Winsen Engineering with the Human Factor in the Loop September-2018 HMC Offshore Construction Contractor OIL & GAS REMOVAL RENEWABLES Fixed platforms Transformer platforms Removal


slide-1
SLIDE 1

Heerema Simulation Center

IMCA

Engineering with the Human Factor in the Loop

Ivan van Winsen September-2018

slide-2
SLIDE 2
  • Fixed platforms
  • Float-overs
  • TLPs
  • Removal & Disposal of

platforms

  • Transformer platforms

(HVAC & HVDC)

  • Turbines and Foundations

OIL & GAS REMOVAL RENEWABLES

HMC Offshore Construction Contractor

slide-3
SLIDE 3

3

HMC Assets

slide-4
SLIDE 4
slide-5
SLIDE 5

The Heerema Simulation Center

Simulation Area (floor 2)

  • Bridge / DP Stations
  • Ballast Room
  • 2x Deck Rooms
  • 2x Crane Domes
  • Float-Over / Winch Station
  • Instructor Room

Bridge Simulator Ballast Station Float-over / Anchoring Instructor room Crane Simulator 1 & 2 Man on Deck Station 2 Man on Deck Station 1

slide-6
SLIDE 6
slide-7
SLIDE 7

7

Scope:

  • Module installation on floating hull

Objective:

  • Cost saving
  • Determine impact loads based on
  • perator skills
  • Optimize clearance between pedestal

crane

Project Simulation

slide-8
SLIDE 8

Approach

Engineer with the human factor in the loop

Engineering preparation Simulation with Offshore Crew Post-Process Results

slide-9
SLIDE 9
slide-10
SLIDE 10

Results

Engineer with the human factor in the loop

Lower Design Loads for Supports Platform Crane Pre-trim Hull DP-behavior was stable

slide-11
SLIDE 11

Concl clusion

Engineer with the human factor in the loop

Safer installation Reduced cost Efficient alignment Better overall understanding and procedure optimization

slide-12
SLIDE 12

Thank You Questions?