Heerema Simulation Center
IMCA
Engineering with the Human Factor in the Loop
Ivan van Winsen September-2018
IMCA Ivan van Winsen Engineering with the Human Factor in the Loop - - PowerPoint PPT Presentation
Heerema Simulation Center IMCA Ivan van Winsen Engineering with the Human Factor in the Loop September-2018 HMC Offshore Construction Contractor OIL & GAS REMOVAL RENEWABLES Fixed platforms Transformer platforms Removal
Ivan van Winsen September-2018
platforms
(HVAC & HVDC)
OIL & GAS REMOVAL RENEWABLES
3
Bridge Simulator Ballast Station Float-over / Anchoring Instructor room Crane Simulator 1 & 2 Man on Deck Station 2 Man on Deck Station 1
7
Engineering preparation Simulation with Offshore Crew Post-Process Results
Lower Design Loads for Supports Platform Crane Pre-trim Hull DP-behavior was stable
Safer installation Reduced cost Efficient alignment Better overall understanding and procedure optimization