ih 2 h 20 0 improveme ements
play

IH 2 H 20 0 IMPROVEME EMENTS New Interchange at CR 1250 The - PowerPoint PPT Presentation

IH 2 H 20 0 IMPROVEME EMENTS New Interchange at CR 1250 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23


  1. IH 2 H 20 0 IMPROVEME EMENTS New Interchange at CR 1250 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019

  2. Introductions  Gene Powell – Public Information Officer (TxDOT)  Robert Ornelas, P.E. – TP&D Director (TxDOT)  Gabriel Ramirez, P.E. – Advanced Planning Engineer (TxDOT)  Paul Aparicio, P.E., - Project Manager (TxDOT)  Brad Kwaterski, P.E. – Project Manager (AECOM)  Other TxDOT Staff IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 2

  3. Agenda 1 Introductions 2 Proposed Improvements 3 Why is Project Needed? 4 Environmental Considerations 5 Next Steps 6 Public Comment IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 3

  4. Project Description  Construction Limits: – FM 1788 to LP 250 (Approx. 5 miles)  Project Description – Construct interchange at CR 1250 – Reconfigure ramps near FM 1788 and LP 250 to accommodate new CR 1250 interchange – Reconstruct frontage roads from FM 1788 to LP 250  Funding – $19.84M total authorized funding IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 4 4

  5. Project Overview – Proposed Improvements LEGEND Mainlane Frontage Rd Cross Street Bridges Ramps Begin End Construction Construction IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 5

  6. CR1 CR1250 I Interc rchange LEGEND Mainlane Frontage Rd Cross Street Bridges Ramps  Construct IH-20 bridge over CR 1250  Extend CR 1250 to southern frontage road and widen  Improve access to CR 1250 IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 6

  7. Ramps Ne Near F FM 1 1788 788 LEGEND MIDL DLAND D Mainlane INTERNATIONAL A IN AIR IR & & Frontage Rd Cross Street SPA PACE P PORT Bridges Ramps IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 7

  8. Ramps Ne Near F FM 1 1788 788 LEGEND Mainlane Frontage Rd Cross Street Bridges Ramps  Relocate existing WB exit ramp to FM 1788 and existing EB entrance ramp from FM 1788  Construct two entrance ramps and two exit ramps  Construct auxiliary lane between ramps on frontage roads (open to traffic in future)  Reconstruct frontage roads to include curb and gutter IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 8

  9. Ramps Ne Near L LP 250 250 LEGEND MIDL DLAND D Mainlane IN INTERNATIONAL A AIR IR & & Frontage Rd Cross Street SPA PACE P PORT Bridges Ramps IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 9

  10. Ramps Ne Near L LP 250 250 LEGEND Mainlane Frontage Rd Cross Street Bridges Ramps  Relocate existing WB entrance ramp from LP 250 and existing EB exit ramp to LP 250  Construct two entrance ramps and two exit ramps  Construct auxiliary lane between ramps on frontage roads (open to traffic in future)  Reconstruct frontage roads to include curb and gutter IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 10

  11. Why is Project Needed? – Insufficient access to/from industrialized area serviced by CR 1250 on IH 20. – IH 20 freight and commuter traffic congestion at IH 20/LP 250 intersection and IH 20/FM 1788 intersection. IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 11 11

  12. Regional Compatibility  City of Midland’s Tall City Tomorrow Plan  CR1250 as a future major arterial IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 12

  13. Midland - Tall City Tomorrow Comprehensive Plan IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 13 13

  14. Midland - Tall City Tomorrow Comprehensive Plan LP 250 CR 1250 FM 1788 IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 14 14

  15. Environmental Considerations Environmental Study: NEPA requires environmental analysis of a project’s impact on natural and human environment if federal funds are to be used. Natural Environment Waters of the U.S./wetlands   Water quality  Vegetation  Wildlife  Threatened and endangered species Human Environment  Community impacts Bike/pedestrian considerations   Parks  Traffic noise  Air quality  Cultural resources IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 15

  16. Next Steps IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 16

  17. Questions and Comments Commen ents m mus ust be be recei eceived ed or or postmarked ed b by Febr ebrua uary 1 13, 3, 20 2019. 9.  Submit comments at today’s meeting  Submit in writing to: Texas Department of Transportation Attn: Gabriel Ramirez, P.E. 3901 East Highway 80 Odessa, TX 79761  Submit by email to Gabriel.Ramirez@txdot.gov IH-20 Improvements – New Interchange at CR 1250 – CSJ 0005-14-084 January 29, 2019 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend