ibm i workload migration and moving data between platforms
play

IBM i workload migration and moving data between platforms Paul - PowerPoint PPT Presentation

IBM i workload migration and moving data between platforms Paul Wade Regional Lead Sales Engineering EMEA Migration What is migration really? Hardware Upgrades - P6 -> P7, P7-> P8 P->V, V->P , etc. OS Version


  1. IBM i workload migration and moving data between platforms Paul Wade Regional Lead Sales Engineering EMEA

  2. Migration What is migration really? • Hardware Upgrades - P6 -> P7, P7-> P8 • P->V, V->P , etc. • OS Version • Server Consolidation • Server Relocation • Data Center Move (and to/from Hosting) • SAN Migration (to/from or vendor) • Ground to Cloud • Cloud to Cloud • Database Vendor • Database Version • OS Vendor • Application Version • Reorg While Active

  3. Migration Goals Goals Rarely Change • Migration with the least possible downtime to production environment • Protection against system failure during all phases of the migration • Failback option in case of problems with new System/ App/Location • Migrate one HA product to another

  4. Migration Goals Cascade Method Example - Health Care specialist Primary AS/400 730 – System i 570 (System “A”) Big Bang migration would have caused a 20 hour outage Migrate 800Gb over 3 nights Parallel Method Backup Test (System “B”) Migration at midnight Sign off users from 730 Sign on users to 570 Primary Primary Primary Downtime (Minutes) (System “A”) (System “C”) (System “C”) Backup Backup Backup (System “D”) (System “D”) (System “B”)

  5. Ease of Use with Vision Solutions Portal (VSP) Consolidated View of Availability • Browser based • Monitoring at a glance • Multi-instance, multi-product • Runs in Windows, IBM i and AIX Integrated, Intuitive Help System • Fly-over help notes • Smart Sort • Smart prompting Highly Customizable Interface • User-defined A single pane of glass for managing HA/DR 
 • System level security solutions across platforms

  6. VSP Highlights At-a-Glance Monitoring Hover Text over Icons Action Attention Okay Required (May resolve itself) (Switch Ready) Lights Out Monitoring Throughput Analysis Graphs E-mail Notification Hyper Link to VSP for resolution

  7. Database Migration Scenarios Modernization • Upgrading database version Legacy Legacy • Upgrading application version Conversion App / Database App/Database • Moving data to new database or application • Switch to new operating system New Consolidation • Reducing # of database platforms App / Database • Standardizing on fewer vendors • Reducing number of DBs by 
 30% planned to consolidate/combine databases in consolidating into a centralized database, 
 the next year. data mart or data warehouse 28% plan to convert to a different database. 19% plan to reduce the number databases.*

  8. Database Migration Scenarios Users Backups Copy Data Transform Data Testing/verify All Users Back O ff On System System DOWNTIME Monday EOD Saturday Sunday AM Friday Issues: • Hope you can complete all steps in available time window… - Data volumes becoming ever larger – takes longer to copy and convert data - Business becoming more 24 x 7 - reduced downtime window opportunities • Final testing/verification limited to what remaining time you have • Many stages are dependant on completion of previous stage

  9. Migration Benefits Victaulic is a world leader in mechanical pipe joining systems. was founded in Network City in 1925 to market a radical new concept in the piping industry - a mechanical bolted coupling that would engage into pipe grooves and use a gasket seal. DT SHARE replication Delta Migration Toolkit Target 10.1 schema remains in- periodically suspended and used to help map 7.1 schema sync with 7.1 scheme in real snapshot copy of 10.1 to 10.1 schema within DT time for extended duration to schema made for testing SHARE metabase allow parallel testing progress � Infor � Live Users � Experience no downtime during the Infor-Lawson Lawson migration process. M3 Java 7.1 M3 Java 10.1 Planned cutover expected to take less than Test users 4 hours Real Time Can test & train on 10.1 using CDC Replication snapshot data after some 10.1 upgrade tasks have been run Benefits over traditional migration approach Project Dates 1. Reduce cut-over window - cut-over less than 4 hours after some 10.1 upgrade tasks run Start Jan 2013 2. Parallel testing/training snapshots - Full function and current 10.1 data after upgrade tasks run Cut-Over June 2013 3. Application set up configuration remains fluid - will be replicated to new release automatically Project Location 4. Parallel projects - other business projects can now run in parallel to the migration. Nazerth, Belgium

  10. Migration Benefits Why have Victaulic chosen the Delta Migration with Double-Take SHARE? BUSINESS REASON Nr #1 - LESS INTRUSIVE TO OUR BUSINESS When we went live from Movex V11 to M3 7.1 in Europe in 2010, we executed 10 traditional data migration phases which results in around 250 - 300 Business Days testing by our business users. Add on top of that consultants’ hours testing.’ BUSINESS REASON Nr #2- MORE EXTENSIVE TEST PERIOD POSSIBLE ‘We want to start populating the BUSINESS DATA for the CHINA GO Live planned next year. This replication allows us to start populating M3 7.1 and get prepared way ahead of the go live.’ BUSINESS REASON Nr #3- ENAGED USERS & GREATER CERTAINTY OVER TIMELINE ‘Our people in China are early engaged in the M3 10.1 Go live game. They see their data flow from one system to the other and this creates engagement and dedication to do a good data entry job. ‘When our manufacturing in Poland went live in 2011, we had to postpone due to the fact that the entry of manufacturing part codes and BOM’s was heavily underestimated ‘With this scenario, we can start early in the game and avoid postponing the go live data as the entry of the data can start in M3 7.1

  11. Transform the Way You Do Business Breaks down barriers between • Multiple databases • Incompatible applications • Disparate platforms 
 Makes data sharing easy • Captures changes • Transforms the data • Replicates it to the desired target 
 Allows for • Greater productivity • Higher profitability How can Double-Take Share transform • Immediate ROI the way you do business? • All with no programming!

  12. Migration What is migration really? • Hardware Upgrades - P6 -> P7, P7-> P8 • P->V, V->P , etc. • OS Version • Server Consolidation • Server Relocation • Data Center Move (and to/from Hosting) • SAN Migration (to/from or vendor) • Ground to Cloud • Cloud to Cloud • Database Vendor • Database Version • OS Vendor • Application Version • Reorg While Active

  13. Migration…. DONE

  14. IN SUMMARY Vision Solutions is the industry leader protecting businesses’ data, applications 
 and servers with solutions that meet every business continuity need. Solution Area Offerings Key Messages • RaaS Platform • Cloud BC/DR made easy Cloud Protection • Metered Usage • Cloud Adoption Acceleration and Recovery • APIs for custom integration • Risk mitigation for the Cloud High Availability • Server Protection • Physical, Virtual, Cloud Protection and • Agentless VM Protection • Protection of data, apps, servers Disaster Recovery • Private Cloud Protection • Protect heterogeneous environments Migration and • Cross-Platform Data Sharing • Near-zero downtime migrations Cross-Platform • Windows/Intel/AMD • Risk mitigation Data Sharing • IBM Power Systems • Easy, real-time data sharing between DBs The Vision Solutions Partner Program offers partners no-risk, unlimited potential for increased revenue and the affords them the ability to provide their customers the most innovative protection, recovery, availability and migration solutions.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend