A TRT Sustainable Project means….
- Consistency with our land use vision –
Ha Tlatgi Ha Khustiyxh siti and; the Taku River Tlingit Conservation Area Design
- Respect for our land, our people, our
rights and title
- Respect for Tlingit connection to the
land and traditional commerce (our way of life)
SLIDE 5
Examples….
- Taku Wild
- Micro-hydro
- Geothermal heated buildings
- Hydro expansion
SLIDE 6
www.takuwild.com
- www.takuwild.com
-
SLIDE 7
Our r fir irst t Hyd ydro ro Pro roject ect
- TRT as developers
– A two decade old idea – Had several ‘almost’ proponents – TRT took charge, we had no money but had a strong idea and belief, and we developed relationships – We knew we needed to build for Atlin, and plan to expand later
SLIDE 8
Relatio ationships nships
- TRT formed new relationships with BC
Hydro to complete a Community Energy Plan (CEP), with BC & Canada
- With our partners we were able to
develop capacity and carry out ever increasingly complex prjcts successfully
- These successes reinforced our belief
and commitment to own 100% of our project
- The expansion will be significantly
bigger and we will likely be looking for partners as we move forward
SLIDE 9
Ow Ownersh ership ip
- In the first project TRT invested the
money it had, a buck or two
- TRT formed a company to carry out
the project and then the Taku River Tlingit Government stepped back and let its corporate people go to work
- Xeitl Limited Partnership built the
first project
- Tlingit Homeland Energy Limited is
the proponent in the expansion
SLIDE 10
Res espon ponsib sibili ilities ties
- TRTFN never allowed XLP one
moment of relief from their responsibilities to the environment, to the Tlingit people, and to TRT
- XLP had to pay all costs TRT
incurred as a result of the XLP development in TRT territory
- This will hold true for THEL and the
expansion project as well
SLIDE 11
The Expansion Project
- Approximate 5MW ‘modified’ run of river
- 32 sq km lake (Surprise Lake) is main source
- Surprise Lake natural annual rise is 1 meter
- Twin existing 4 km 48” HDPE and steel
penstock
- Twin exisitng 2 pelton turbines but will be
slightly larger output 3-4MW
- Downstream 2MW installation
- 100 km power line to connect to Yukon grid
- Will diminish Yukon GHG emissions by 14,000
tonnes annually for the life of the project
SLIDE 12
Our land is
- ur
future….
Gunałcheesh
SLIDE 13
www.takuwild.com
- The best salmon in the world, ask any Taku River Tlingit !
- GUNALCHEESH
- MUSSI CHO