HOW TO PROMOTE PROJECTS/PROCESSES
IN EUROPEAN CITIES?
Didier Rebois Architect, General secretary Europan ECAP Bucharest 12.06.2019
.
HOW TO PROMOTE PROJECTS/PROCESSES . IN EUROPEAN CITIES? Didier - - PowerPoint PPT Presentation
HOW TO PROMOTE PROJECTS/PROCESSES . IN EUROPEAN CITIES? Didier Rebois Architect, General secretary Europan ECAP Bucharest 12.06.2019 Europan 15 : Productive Cities 2 47 sites in 42 European cities in 12 Countries Rotterdam Visserijplein (NL).
.
.
CREATING PROXIMITIES Third spaces in-between CHANGING METABOLISM Multiplying and connecting agencies
Charleroi (BE). Scale XL/L. 35ha Actors involved City of Charleroi /Duferco Wallonie Marseille (FR). scale XL/S 90ha Actors involved City of Marseille, AMP (Metropole Aix Marseille Provence), AGAM (urban planning agency) Lasarte-Oria (ES) scale L/S. 3,34ha Actors involved Lasarte-Oria Municipal Council; Environment, Land Planning and Housing Dept., Basque Government CHANGING METABOLISM From linear to circular economy
IMPLANTING Productive milieus
Rotterdam Visserijplein (NL). Scale S. 1,2ha Actors involved Municipality of Rotterdam, Delfshaven Coöperatie,
.
RESEARCH OF SITES AND ACTORS : CITIES, INSTITUTIONS. CLIENTS . OWNERS… + BRIEF REDACTION + 1RST REFLECTION ON THE PROCESS AFTER COMPETITION
COMPETITION LAUNCH NATIONAL EVENTS COMMUNICATION + VISITS OF SITES WITH ACTORS + DESIGN OF ENTRIES: PROJECTS PROCESSES + EVALUATION JURIES OF EXPERTS + 1 EUROPEAN FORUM BETWEEN TWO MEETINGS OF JURIES AND FINAL DECISION
ANNOUNCE OF RESULTS : 100 PRIZES WINNERS , RUNNERS-UP AND SPECIAL
LABEL : PUBLICATION OF EUROPEAN AND NATIONAL CATALOGUES AND CRITICS OF RESULTS + INTERMEDIARY PHASE BETWEEN COMPETITION AND PROCESSES OF IMPLEMENTATION CITIES CAN CHOOSE BETWEEN THE WINNING TEAMS THAT OR THOSE WITH WHO THEY WANT TO CONTINUE QUESTION OF PASSAGE FROM THE COMPETITION TO PROFESSIONAL CONTRACT DIFFERENT SOLUTIONS WITH PUBLIC MARKETS : DIRECT ORDER, WORKSHOP, SECOND PHASE BETWEEN SEVERAL WINNING TEAMS PER SITE… PRE OPERATIONAL PHASE : THE NEGOTIATED DPROJECT THE WINNING PROJECT-PROCESS IS DISCUSSED WITH THE LOCAL ACTORS : CITY – OWNERS – CLIENTS – USERS… LONG PHASE WHERE THE WINNING IDEAS SERVE TO ELABORATE THE ORDER INNOVATION IN PROCEDURE TO AVOID THE MASTERPLAN URBAN STUDIES – RESEARCH – PRE PERATIONAL CONTRACT THE PROJECT EVOLVE INTEGRATING LOCAL PARAMETERS BUT KEEPING THE IDEA OF THE COMPETITION BUT SOMETIMES THE PROCESSES CAN STOP AT THIS STEP …
OPERATIONAL PHASE : URBAN AND/OR ARCHITECTURAL? VERY OFTEN THE OPERATIONAL PHASE IS ONLY URBAN. THE CITY ASK TO THE TEAM(S) TO ELABORATE A GUIDE PLAN, A SPATIAL AND PROGRAM- MATIC FRAME GENERALY AT LARGE SCALE IF THE CITY DIDN’T INVOLVE EARLIER THE POTENTIAL CLIENTS TO BUILD IT COULD BE A DELICATE PHASE FOR THE TEAM TO STAY IN THE GAME. THE ROLE OF THE CITY HAS TO BE STRONG ENOUGH TO KEEP THE QUALITY OF THE PROJECT PROCESS AT THIS STEP OF PASSAGE FROM RULES AND GUIDES TO BUILDINGS, PUBLIC SPACES AND LANDSCAPE
.
PHASE 3 : THE NEGOTIATED PROJECT: PROGRAM AND PLACE PHASE 4: IMPLEMENTATION ON THE TIME (EUROPEAN AND NATIONAL SUBSIDIES) PHASE 1 SITE AND ACTORS. E 9 SELB (DE) A SHRINKING CITY SCALE S PHASE 2 COMPETITION PROJECT-PROCESS. W (ES) DE LA FUENTE+GUTTERIEZ « CATALOGUE FOR DWELLING ON THE TIME »
.
PHASE 3 THE NEGOTIATED PROJECT: PROGRAM, DENSITY, PARTICIPATION PHASE 4 OPERATIONAL) PHASE 1 SITE AND ACTORS E10 WIEN (AT) SCALE L URBAN DENSIFICATION PHASE 2 COMPETITION PROJECT-PROCESS. W (ES) ABP OFFICE « GARDEN COURTYARD »
.
PHASE 3 PRE OPERATIONAL : DESIGN THE LANDSCAPE AT PROXIMITY SCALE PHASE 4 OPERATIONAL : FIRST STEP URBAN THEN ARCHITECTURE PHASE 1 SITE AND ACTORS. EUROPAN 11 SAMBREVILLE (BE WALLONIA) INHABITING THE SUBURBAN. SCALE XL-S COMPETITION PROJECT. RU (IT) CAPASSO VANDEMMIA AURINO FALCONE « CITY-SAMBRE-CITY » : A TERRITORIAL AND LANDSCAPE STRATEGY
Limite du site Toitures Cours Canalisation eau toitures Canalisation eau cours Citernes d’eau pluviale récupérées Eau récupérée (nettoyage - arrosage) Eau en excès > jardin de pluie Eau en excès > Sambre Jardin de pluie Sol vegetalisé- évacuation eau par infiltration Sol minéral permeable - évacuation eau par infiltration Sol encapsulé - évacuation eau par canalisation TRAME BLEUE 1 , m 5 , m 1 , m Gestion eaux pluviales Toitures et ruissellement Jardins de pluie Végetation existante Pelouse / végétation basse / aire de sport Collines (sol encapsulé) Jardins potagers Coulée verte Parterre Cours avec végétation ponctuelle Limite du site 1 , m 5 , m 1 , m TRAME VERTE.
PHASE 3 : THE NEGOCIATED PROJECT: LAND PROGRAM INTERCONNECTIONS PHASE 4: IMPLEMENTATION OF PUBLIC SPACE AND FACILITIES IN PROGRESS PHASE 1 SITE AND ACTORS. E 13 PLAN D’AOU MARSEILLE (FR). SCALE L QUALIFYING POOR SOCIAL DISTRICTS COMPETITION PROJECT-PROCESS. RU (FR) CONCORDE + RU (DK) ARKI-LAB « A NEW URBAN VILLAGE + CONCOMITANCE »
.
PHASE 3 PRE OPERATIONAL : CHANGE SITE AND LEISURE PROGRAM PHASE 4 OPERATIONAL DESIGN OF EPHEMERAL FACILITIES PHASE 1 SITE AND ACTORS. EUROPAN 13 ZAGREB (HR) RIVER BETWEEN FLOOD AND APPROPRIATION? SCALE XL COMPETITION PROJECT. W (ES) ZARCOS SANZ, KOL, PEREZ, HIDALGO « SWAP ON THE RIVER» : A TERRITORIAL AND EPHEMERAL STRATEGY
.