hi lindsey here is the aandc presentation paul 1 1
play

Hi Lindsey, Here is the AANDC presentation. Paul 1+1 Aboriginal - PDF document

From: Lindsey Cymbalisty - MVLWB To: Permits Subject: FW: BOREALIS GEOPOWER WATER LICENCE HEARING INTERVENTION PRESENTATION Date: Friday, April 13, 2012 4:48:09 PM Attachments: YELLOWKN-# 511296-v1-


  1. From: Lindsey Cymbalisty - MVLWB To: Permits Subject: FW: BOREALIS GEOPOWER WATER LICENCE HEARING INTERVENTION PRESENTATION Date: Friday, April 13, 2012 4:48:09 PM Attachments: YELLOWKN-# 511296-v1- BOREALIS_GEOPOWER_WATER_LICENCE_HEARING_INTERVENTION_PRESENTATION.PPT Borealis GeoPower AANDC Presentation Cover Letter.PDF From: Paul Green [mailto:Paul.Green@aandc-aadnc.gc.ca] Sent: April-13-12 1:49 PM To: Lindsey@mvlwb.com Cc: Nathen Richea Subject: BOREALIS GEOPOWER WATER LICENCE HEARING INTERVENTION PRESENTATION Hi Lindsey, Here is the AANDC presentation. Paul

  2. 1+1 Aboriginal Affairs and Affaires autochtones et Northern Development Canada Developpement du Nord Canada PO Box 1500 Yellowknife, NT X1A2R3 File: MV2012L4-0001 April13, 2012 Lindsey Cymbalisty Regulatory Officer Mackenzie Valley Land and Water Board 7th Floor - 4910 50th Avenue Yellowknife, NT X1A 2P6 Re: AANDC Technical Presentation - Borealis GeoPower MV2012L4-0001 Please find attached AANDC's presentation for the Borealis GeoPower Water Licence Hearing scheduled for April24, 2012 in Fort Liard, NT. If you have any questions or concerns, please feel free to contact Mr. Nathen Richea at 669-2657 or nathen.richea@aandc-aadnc.gc.ca or the undersigned at 669-2574 or robert.jenkins@aandc-aadnc.gc.ca. Sincerely, Robert enkins Manager Water Resources Division Aboriginal Affairs and Northern Development Canada NWT Region

  3. Aboriginal Affairs and Northern Development Canada (AANDC) Public Hearing Presentation Borealis GeoPower Fort Liard Geothermal Power Plant Water Licence Application Fort Liard, NWT April 24, 2012

  4. Presentation Overview  Water Usage  Operational Requirements  Well Drilling  Contingency Planning  Project Monitoring  Operational  Potable Groundwater Zone  Adaptive Management  Reclamation Security  Closure and Reclamation  Term of Licence

  5. Water Usage  Volume of water extracted should be monitored.  Drilling operations  Geothermal operations  Consistent with other Type A Water Licences in the NWT.

  6. Water Usage - Recommendations Recommendations AANDC rec ecom m en ends s t hat t he e w at er er licen ence e cont ain a requi uirem ent nt t o cont nt inuo nuous usly m m oni nit or t t he he vo volum um e of w at er er ex ext ract ed ed from t he e Nahanni form at ion. The e w at er er licen ence e sh should a also so c cont ain a r req equirem em en ent t o cont nt inuo nuous usly m oni nit or t he he vo volum um e of w at er inj nj ect ed int nt o t h t he Mat t s t t son form at i t ion. AANDC rec ecom m en ends s t hat t he e so source e and t he e daily m axim um am ount of su surface e w at er er t o be e used sed by t he e proj ec ect be e iden ent ified ed w it hin t he e w at er er licen ence. e. Furt her er, t he e am ount used sed per er so source e be e rec ecorded ed and rep eport ed ed w it hi hin t n t he he Annua nnual R Report .

  7. Operational Requirements – Wells  AANDC has several concerns related to the drilling, completion and operation of the wells:  Logging, Completion and Cementing NEB and Alberta ERCB provide guidance.   Drilling Waste Management Proponent has committed to off-site disposal  of drilling waste.  Injectivity Testing Confirm suitability of Mattson formation. 

  8. Operational Requirements – Wells - Recommendations Recommendations AANDC rec ecom m en ends s t hat t he e NEB and/ or Alber ert a ERCB req equirem em en ent s s for w el ell logging, cem em en ent ing and casi sing, and any ot her er applicable e t est est s s and su subm issi ssion req equirem em en ent s s be e req equired ed under er t he e w at er er licen ence. e. AANDC DC recom m end nds a t erm and nd cond ndit ion n w it hi hin n t he he w at er licence prohibit ing t he onsit e disposal of drilling flui uid a and nd/ or c cut ut t ing ngs . AANDC DC recom m end nds t ha hat a “ Ful ull I nj ect ivit y Test est ” be e a req equirem em en ent of t he e w at er er licen ence. e. The e resu esult s s sh should be e pr provide ded d t o t he Board d for review and d appr pproval pr prior t o t he e oper erat ional r re-inj ec ect ion of process ess w at er er int o t he e Mat t son on f for orm at ion on.

  9. Operational Requirements – Contingency Planning  Spill contingency planning  Approved Spill Contingency Plan required.  Worst case spill event.  Specific spill response procedures.  Emergency response planning  Approved Emergency Response Plan required prior to operations.

  10. Operational Requirements – Contingency Planning - Recommendations Recommendations AANDC DC recom m end nds t ha hat an n approve ved Spill Cont nt ing ngenc ncy Plan m ust st be e in place e prior t o com m en encing oper erat ions. s. AANDC recom m ends ds t hat addi ddit ional de det ail be pr provide ded d on t he e im plicat ions s and ef effec ect s s of w orst st case se sc scen enario sp spills, s, inc nclud uding ng ho how t he he phy hysical respons nse w oul uld differ for a w orst st c case se sc scen enario c com pared ed t o a n non-w orst st c case se ev even ent . AANDC rec ecom m en ends s t hat sp spec ecific sp spill resp esponse se proced edures es sh should be e dev evel eloped ed for t he e proposed sed binary fluid H HFC-245a and, if it is s t o be e used sed on-si sit e, e, t he e inhibit or Arm ohib28. AANDC DC recom m end nds t ha hat any ny addit iona nal che hem icals, no not alrea eady d desc escribed ed in t t he e Spill Cont ingen ency Plan, m m ust st be e approved ed by t he e Board p prior t t o use se on si sit e, e, and m ust st b be e inc ncorporat ed i int nt o an up n updat ed Spill C Cont nt ing ngenc ncy Plan. n.

  11. Operational Requirements – Contingency Planning - Recommendations Recommendations (continued) AANDC rec ecom m en ends s t hat an approved ed Em er ergen ency Resp esponse se Plan sh should be e in p place e prior t t o com m en encem em en ent of o oper erat ions s under er a T Type e “ A” w w at er er licen ence. e.

  12. Project Monitoring  Project monitoring is recommended for two components  Operational Drilling fluid;  Cementing and casing, logging, other;  Pressure and flowrate;  Injection zone; and  Material balance.   Potable Groundwater Zone Groundwater is used in the area  Potential for contamination migration 

  13. Project Monitoring - Recommendations Recommendations AANDC rec ecom m en ends s t hat t he e local pot able e groundw at er er zone e be e def efined ed (ver ert ical ex ext en ent ) and t he e chem em ist st ry be e chara ract eri rized, pri rior r t o t he re re-inj ec ect ion of process ess fluids s t o t he Mat t s t h t t son form at i t ion. AANDC DC recom m end nds t ha hat a g ground undw at er m oni nit oring ng p plan n be d e dev evel eloped ed for t t he e proj ec ect . AANDC DC recom m end nds t ha hat t he he propone nent nt collect and nd analyse sam ples of drilling fluid used during t he drilling of t he he produc uct ion n and nd inj nj ect ion n w ell. Sam ples sho houl uld be rep eport ed ed by w el ell, dep ept h, volum e e used sed, and volum e e rec ecover ered ed.

  14. Project Monitoring - Recommendations Recommendations (continued) AANDC DC recom m end nds t ha hat t he he operat iona nal inf nform at ion n and nd m oni nit oring ng requi uirem ent nt s of t he he Nat iona nal Ene nergy Board and/ or Alber ert a Ener ergy Reso esources es Conser servat ion Board be e included ed as s t er erm s s and condit ions s of t he e Wat er er Licen ence. e. At a m ini nim um um , t he he requi uirem ent nt s out ut line ned w it hi hin n Sect ion n 4.0, 5. 5.0, 0, and 7. 7.0 0 of t he Albert a ECRB Direct ive 051 051 should be ado dopt pt ed. d. AANDC rec ecom m en ends s a r req equirem em en ent for o ongoing m onit oring of t he e m ec echanical int eg egrit y of t he e sy syst st em em . This s coul uld i inc nclud ude m oni nit oring ng a and nd report ing ng inj nj ect ion n pressur ure and d fl flow rat e on a n a cont nt inuo nuous us b basis.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend