HAMPTON HILL MINING NL Presentation 2007 2007 HAMPTON HILL - - PDF document
HAMPTON HILL MINING NL Presentation 2007 2007 HAMPTON HILL - - PDF document
HAMPTON HILL MINING NL Presentation 2007 2007 HAMPTON HILL MINING COMPLIANCE STATEMENT The information in the above report that relates to exploration results has been, reviewed and confirmed as accurate by Mr Wilson Forte who is a member
HAMPTON HILL MINING
COMPLIANCE STATEMENT The information in the above report that relates to exploration results has been, reviewed and confirmed as accurate by Mr Wilson Forte who is a member of the AusIMM and a competent person as defined in the 2004 edition of the Australian Code for Reporting of Exploration Results Mineral Resources and Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and has given his consent to its inclusion.
HAMPTON HILL MINING
Project Locations
HAMPTON HILL MINING
Weld Range Direct Shipping Ore Project (Midwest earning 60%)
Jack Hills
Weld Range Direct Shipping Ore Project
HAMPTON HILL MINING
Weld Range Direct Shipping Ore Project
Iron ore lense partially tested Iron ore lense untested
Eastern Iron Ore Lenses Western Iron Ore Lenses
HAMPTON HILL MINING
Weld Range Direct Shipping Ore Project
Midwest Iron Ore Resources
HAMPTON HILL MINING
N
Weld Range Direct Shipping Ore Project
N
Recent Midwest drilling results:
LENS W29
W45 -54m @ 55.1% Fe W31 -66m @ 57.9% Fe
LENS W6
Mid Mid W30 -62m @ 58.4% Fe
Iron Ore Lenses
LENS W20
Hampton/ Midwest Hampton/ Midwest promising untested lenses promising untested lenses Hampton/ Midwest Hampton/ Midwest promising untested lenses promising untested lenses Midwest Midwest p g p g p g p g 2kms
HAMPTON HILL MINING
JV ith Mid t C ti Ltd i JV ith Chi
Weld Range Direct Shipping Ore Project
- JV with Midwest Corporation Ltd in JV with Chinese company
Sino Steel Corporation (Midwest earning 60%) Western Iron Ore Lenses
- First pass drilling beneath surface hematite returned
high grade iron mineralisation B l d 16 @ 59 6% F Western Iron Ore Lenses
- Best result to date:16m @ 59.6% Fe
- Follow up drilling planned for 2008
Eastern Iron Ore Lenses
- All three lenses remain untested
2008
- Extensive drilling campaign to commence
in early 2008 2008
- Midwest plan completion of prefeasibility
studies by October 2008
HAMPTON HILL MINING
Apollo Hill Gold Project
JV- Apex Minerals Spending $3million JV Apex Minerals Spending $3million
- ver 3 years to earn 51%
HAMPTON HILL MINING
Apollo Hill Apollo Hill Gold Project
Main Zone Northern Section 17610N
HAMPTON HILL MINING
Apollo Hill Gold Project
Mafic Felsic
Apollo Hill Gold Project
- In excess of $1 million spent on drilling
during first year
- Including 26 RC and Diamond holes drilled
- Including 26 RC and Diamond holes drilled
- Extending known gold mineralisation
Regional targets
- Best intercept 10metres@6.5g/t gold
- Regional gold targets to be tested 2008
g g g
HAMPTON HILL MINING
Manyingee North j Project
Uranium
HAMPTON HILL MINING
- 39 Aircore drillholes
- n 500 metre grid
Manyingee North Project
- n 500 metre grid
- Buried channels identified
- Best results:
3m @303ppm U3O8 from 69m incl 1m @507ppm U3O8
- Best results:
8 Ai d illh l
Inferred Resource 12,000 tonnes U3O 8
- 8 Aircore drillholes
- n 200 metre grid follow up
(awaiting results)
HAMPTON HILL MINING
Wheatley Base Metal Wheatley Base Metal Project
HAMPTON HILL MINING
Wheatley Base Metal P j
- Hampton took over management
d i 2007
Project
during 2007
- Over $300,000 expended
since takeover
- Main focus was at Kingsley
with 5 diamond holes drilled
- Reviewing regional EM anomalies
for further drill testing
HAMPTON HILL MINING
Murchison Projects Murchison Projects
Murchison Projects
HAMPTON HILL MINING
Meekatharra
Maranoa Bore Glenview Ryansville Weebacarry
20km
HAMPTON HILL MINING
W b Weebacarry Gold Project
HAMPTON HILL MINING
Weebacarry Gold Project
- Aurora recently withdrew from JV
- Initial review of data indicates further work required for 2008
HAMPTON HILL MINING
Capricorn Nickel Sulphide Sylvania Uranium p p and Projects
HAMPTON HILL MINING
Capricorn Nickel Sulphide Sylvania Uranium and Projects
HAMPTON HILL MINING
Capricorn Nickel Sulphide
- Best drilling results to date:
Best drilling results to date:
2 metres@1.36% nickel, 0.62% copper 0.8 ppm platinum
- Soil program completed to test extensions of
Ji bl b t b lt R lt it d
- Seeking JV partner to fund new concepts
Jimblebar greenstone belt. Results awaited
Sylvania Uranium
- Recent - Ground investigation
Recent Ground investigation
- f uranium anomalies. Results awaited
- Native Title negotiations for access to
prospective eastern anomalies prospective eastern anomalies
HAMPTON HILL MINING
Yill Ni k l P j Yillaree Nickel Project
JV Breakaway Resources Ltd
(Breakaway 81 27%) (Breakaway 81.27%)
- Hampton free carried for next $500,000
- f expenditure
p
- Within ultramafic corridor hosting major
deposits of Mt Keith,Cosmos and Leinster p ,
- 2007 activities – 94 RAB, 26Aircore holes
for 4510 metres for 4510 metres
- 2008 – 61 RAB holes for 2500 metres to
test magnetic targets test magnetic targets
2008 – The Future
HAMPTON HILL MINING
Weld Range Direct Shipping Ore Project g pp g j
- Drilling of untested lenses
- Midwest plan to complete prefeasibility study by October 2008
Apollo Hill Gold Project p G j
- Drill testing of regional targets
Wheatley Base Metal Project
- D ill t
ti f i l EM t t
- Drill testing of regional EM targets
Weebacarry Gold Project
- Drill testing of targets generated by review of exploration data
Leinster Nickel Project
- 2,500 metres of RAB drilling over magnetic targets