HAMPTON HILL MINING NL

Presentation 2007 2007

slide-2
SLIDE 2

HAMPTON HILL MINING

COMPLIANCE STATEMENT The information in the above report that relates to exploration results has been, reviewed and confirmed as accurate by Mr Wilson Forte who is a member of the AusIMM and a competent person as defined in the 2004 edition of the Australian Code for Reporting of Exploration Results Mineral Resources and Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and has given his consent to its inclusion.

slide-3
SLIDE 3

HAMPTON HILL MINING

Project Locations

slide-4
SLIDE 4

HAMPTON HILL MINING

Weld Range Direct Shipping Ore Project (Midwest earning 60%)

Jack Hills

slide-5
SLIDE 5

Weld Range Direct Shipping Ore Project

HAMPTON HILL MINING

Weld Range Direct Shipping Ore Project

Iron ore lense partially tested Iron ore lense untested

Eastern Iron Ore Lenses Western Iron Ore Lenses

slide-6
SLIDE 6

HAMPTON HILL MINING

Weld Range Direct Shipping Ore Project

Midwest Iron Ore Resources

slide-7
SLIDE 7

HAMPTON HILL MINING

N

Weld Range Direct Shipping Ore Project

N

Recent Midwest drilling results:

LENS W29

W45 -54m @ 55.1% Fe W31 -66m @ 57.9% Fe

LENS W6

Mid Mid W30 -62m @ 58.4% Fe

Iron Ore Lenses

LENS W20

Hampton/ Midwest Hampton/ Midwest promising untested lenses promising untested lenses Hampton/ Midwest Hampton/ Midwest promising untested lenses promising untested lenses Midwest Midwest p g p g p g p g 2kms

slide-8
SLIDE 8

HAMPTON HILL MINING

JV ith Mid t C ti Ltd i JV ith Chi

Weld Range Direct Shipping Ore Project

  • JV with Midwest Corporation Ltd in JV with Chinese company

Sino Steel Corporation (Midwest earning 60%) Western Iron Ore Lenses

  • First pass drilling beneath surface hematite returned

high grade iron mineralisation B l d 16 @ 59 6% F Western Iron Ore Lenses

  • Best result to date:16m @ 59.6% Fe
  • Follow up drilling planned for 2008

Eastern Iron Ore Lenses

  • All three lenses remain untested

2008

  • Extensive drilling campaign to commence

in early 2008 2008

  • Midwest plan completion of prefeasibility

studies by October 2008

slide-9
SLIDE 9

HAMPTON HILL MINING

Apollo Hill Gold Project

JV- Apex Minerals Spending $3million JV Apex Minerals Spending $3million

  • ver 3 years to earn 51%
slide-10
SLIDE 10

HAMPTON HILL MINING

Apollo Hill Apollo Hill Gold Project

Main Zone Northern Section 17610N

slide-11
SLIDE 11

HAMPTON HILL MINING

Apollo Hill Gold Project

Mafic Felsic

Apollo Hill Gold Project

  • In excess of $1 million spent on drilling

during first year

  • Including 26 RC and Diamond holes drilled
  • Including 26 RC and Diamond holes drilled
  • Extending known gold mineralisation

Regional targets

  • Best intercept 10metres@6.5g/t gold
  • Regional gold targets to be tested 2008

g g g

slide-12
SLIDE 12

HAMPTON HILL MINING

Manyingee North j Project

Uranium

slide-13
SLIDE 13

HAMPTON HILL MINING

  • 39 Aircore drillholes
  • n 500 metre grid

Manyingee North Project

  • n 500 metre grid
  • Buried channels identified
  • Best results:

3m @303ppm U3O8 from 69m incl 1m @507ppm U3O8

  • Best results:

8 Ai d illh l

Inferred Resource 12,000 tonnes U3O 8

  • 8 Aircore drillholes
  • n 200 metre grid follow up

(awaiting results)

slide-14
SLIDE 14

HAMPTON HILL MINING

Wheatley Base Metal Wheatley Base Metal Project

slide-15
SLIDE 15

HAMPTON HILL MINING

Wheatley Base Metal P j

  • Hampton took over management

d i 2007

Project

during 2007

  • Over $300,000 expended

since takeover

  • Main focus was at Kingsley

with 5 diamond holes drilled

  • Reviewing regional EM anomalies

for further drill testing

slide-16
SLIDE 16

HAMPTON HILL MINING

Murchison Projects Murchison Projects

slide-17
SLIDE 17

Murchison Projects

HAMPTON HILL MINING

Meekatharra

Maranoa Bore Glenview Ryansville Weebacarry

20km

slide-18
SLIDE 18

HAMPTON HILL MINING

W b Weebacarry Gold Project

slide-19
SLIDE 19

HAMPTON HILL MINING

Weebacarry Gold Project

  • Aurora recently withdrew from JV
  • Initial review of data indicates further work required for 2008
slide-20
SLIDE 20

HAMPTON HILL MINING

Capricorn Nickel Sulphide Sylvania Uranium p p and Projects

slide-21
SLIDE 21

HAMPTON HILL MINING

Capricorn Nickel Sulphide Sylvania Uranium and Projects

slide-22
SLIDE 22

HAMPTON HILL MINING

Capricorn Nickel Sulphide

  • Best drilling results to date:

Best drilling results to date:

2 metres@1.36% nickel, 0.62% copper 0.8 ppm platinum

  • Soil program completed to test extensions of

Ji bl b t b lt R lt it d

  • Seeking JV partner to fund new concepts

Jimblebar greenstone belt. Results awaited

Sylvania Uranium

  • Recent - Ground investigation

Recent Ground investigation

  • f uranium anomalies. Results awaited
  • Native Title negotiations for access to

prospective eastern anomalies prospective eastern anomalies

slide-23
SLIDE 23

HAMPTON HILL MINING

Yill Ni k l P j Yillaree Nickel Project

JV Breakaway Resources Ltd

(Breakaway 81 27%) (Breakaway 81.27%)

  • Hampton free carried for next $500,000
  • f expenditure

p

  • Within ultramafic corridor hosting major

deposits of Mt Keith,Cosmos and Leinster p ,

  • 2007 activities – 94 RAB, 26Aircore holes

for 4510 metres for 4510 metres

  • 2008 – 61 RAB holes for 2500 metres to

test magnetic targets test magnetic targets

slide-24
SLIDE 24

2008 – The Future

HAMPTON HILL MINING

Weld Range Direct Shipping Ore Project g pp g j

  • Drilling of untested lenses
  • Midwest plan to complete prefeasibility study by October 2008

Apollo Hill Gold Project p G j

  • Drill testing of regional targets

Wheatley Base Metal Project

  • D ill t

ti f i l EM t t

  • Drill testing of regional EM targets

Weebacarry Gold Project

  • Drill testing of targets generated by review of exploration data

Leinster Nickel Project

  • 2,500 metres of RAB drilling over magnetic targets