6/24/2019 1
Greater Kaweah GSA Combined RCC & SC Meeting
Monday, June 24, 2019
www.GreaterKaweahGSA.org
Greater Kaweah GSA Combined RCC & SC Meeting - - PDF document
6/24/2019 Greater Kaweah GSA Combined RCC & SC Meeting www.GreaterKaweahGSA.org Monday, June 24, 2019 ITEM 2: MINUTES 1 6/24/2019 ITEM 3: Summary of Kaweah Coordination Subbasin Basin Setting Components Report Nearing completion
Monday, June 24, 2019
www.GreaterKaweahGSA.org
External Data
(DWR, USGS, SWRCB, CDEC) Well Information GW Level Water Quality GW Pumping Water Supply Surface Water Geology Soil Land use
GDC Database
Data Input/Storage Graphic user Interface
GSP Reporting Water Budget Analysis GW Model Supporting Outreach Data Sharing/Exchange Data Exporting Mapping Hydrograph
System Overview
Consumptive use table ET table Inventory of all facilities DMS Data Model – Identify and Agree on Initial Data Sets to be Uploaded
DMS Water Level Hydrograph
Focused on modeling projects that are currently under construction or that are eminent Conceptual projects will be described in the GSP but will not be taken credit for initially
Possible Projects and/or Management Actions Alternatives Targets as a Percentage of Average Annual Sustainable Yield Deficit (overdraft + half of basin subsurface inflow)
Alt. 2020-25 2026-30 2031-35 2036-40 Total 1 0% 20% 35% 45% 100% 2 5% 25% 30% 40% 100% 3 5% 20% 35% 40% 100% 4 10% 20% 30% 40% 100% 5 10% 30% 30% 30% 100% 6 25% 25% 25% 25% 100%
Alternatives Apportionment of Average Annual Net Increase in Supply Minus Subsurface Inflow & Reduction in Demand in Average Annual Acre-Feet
Alt. 2020-25 2026-30 2031-35 2036-40 Total 1 1 14,985 26,224 33,716 2 2 3,746 18,731 22,478 29,970 3 3 3,746 14,985 26,224 29,970 4 4 7,493 14,985 22,478 29,970 5 5 7,493 22,478 22,478 22,478 6 6 18,731 18,731 18,731 18,731 Goal Optimal
Average Annual Project & MA Targets and Goal/Optimal Goal Differences for Interim Periods (acre-feet)
2020-25 2026-30 2031-35 2036-40 Targets 24,975 33,577 70,769 83,615 Goal Diff 21,229 14,846 25,814 8,690 Opt Diff 17,482 11,099 25,814 8,690
Annual Project & MA Targets For Input To The Model (Acre-Feet)
Water Year Projects Specific MAs Undefined MAs Annual Total Running Total 2020 9,400 9,400 9,400 2021 9,700 4,500 750 14,950 24,350 2022 9,700 4,000 1,000 14,700 39,050 2023 69,400 8,000 1,250 78,650 117,700 2024 10,200 4,000 1,500 15,700 133,400 2025 10,200 4,500 1,750 16,450 149,850 2026 10,200 4,000 3,857 18,057 167,907 2027 83,000 8,000 3,857 94,857 262,764 2028 10,300 4,000 3,857 18,157 280,921 2029 10,300 4,500 3,857 18,657 299,578 2030 10,300 4,000 3,857 18,157 317,735 2031 94,100 8,000 19,149 121,249 438,984 2032 10,500 4,000 19,149 33,649 472,633 2033 10,500 4,500 19,149 34,149 506,782 2034 10,500 4,000 19,149 33,649 540,431 2035 104,000 8,000 19,149 131,149 671,580 2036 10,600 4,000 48,715 63,315 734,895 2037 10,600 4,500 48,715 63,815 798,710 2038 10,600 4,000 48,715 63,315 862,025 2039 107,600 8,000 48,715 164,315 1,026,340 2040 10,600 4,000 48,715 63,315 1,089,655
MT Preliminary Projects & Management Actions Model Run Results
MT Preliminary Projects & Management Actions Model Run Results MT Preliminary Projects & Management Actions Model Run Results
– GKGSA Basin Setting Chapter to be completed with Basin Setting Components Report. The TAC has provided comments on the report, which are being reviewed and addressed.
– Chapter has been revised to reflect comments and provided to TAC to verify addressing of comments. Discussions with other GSAs on coordinated Monitoring Network improvements to finalize Representative Monitoring Sites selection.
– In draft, to be completed with incorporation of GSAs’ feedback and approval of Undesirable Results definitions and adoption of Sustainability Goal for the Subbasin.
– Draft chapter to be revised with Minimum Thresholds and Measurable Objectives, based on TAC, RCC, and SC recommendations.
– Draft chapter under internal review, includes projects and management actions discussed so far, at
GSP Section/Sub Section Completion Date Revised Completion Date Percent Complete
1. Introduction Draft in for Review 95% 2. Basin Setting Friday, March 29, 2019 Friday, June 14, 2019 80% 3. Sustainability Goal & Undesirable Results Friday, April 19, 2019 Friday, June 21, 2019 75% 4. Monitoring Networks Friday, April 12, 2019 Tuesday, June 18, 2019 80% 5. Minimum Thresholds, Measurable Objectives, & Interim Milestones Friday, April 26, 2019 80% 6. Water Supply Accounting Friday, April 19, 2019 65% 7. Projects, Management Actions and Adaptive Management Friday, April 26, 2019 Tuesday, June 21, 2019 60% 8. GSP Reporting Friday, April 26, 2019 75%
SMC Thresholds and Objectives – Iterative Process Developed by Stakeholders Informed by technical information including groundwater modeling Basin Setting/Water Budget Refinements Projects and Management Actions
SUBBASIN ACTIVITIES
Groundwater Model Refinement SMC Goal and SI Assessment Complete Basin Setting Chapter Groundwater Model Simulations
GSA Deliverable
Define Management Areas Develop Thresholds and Objectives for MAs Water Level Projections Draft Monitoring Network Chapter Complete Monitoring Network Chapter Complete SMC Chapter
Jan Feb Mar Apr May Jun
Water Supply Accounting Framework Draft Water Supply Accounting Chapter