GRAPHITE PROJECT " NMG IS IS PR PROJECTED TO TO High igh - - PowerPoint PPT Presentation

graphite
SMART_READER_LITE
LIVE PREVIEW

GRAPHITE PROJECT " NMG IS IS PR PROJECTED TO TO High igh - - PowerPoint PPT Presentation

MATAWINIE GRAPHITE PROJECT " NMG IS IS PR PROJECTED TO TO High igh Purit rity Flak lake Grap raphite Dep eposit OPERATE TH THE LA LARGEST in North America in GRAPHITE OPERATION IN IN TH THE WESTERN WORLD " Corp rporate


slide-1
SLIDE 1

High igh Purit rity Flak lake Grap raphite Dep eposit in in North America Corp rporate Pres resentation – Janu January 2019 19

MATAWINIE GRAPHITE PROJECT

WWW.NOUVEAUMONDE.CA :: :: TSX TSXV:N :NOU :: :: OT OTCQX:NMGRF :: :: FS FSE:N :NM9

"NMG IS IS PR PROJECTED TO TO OPERATE TH THE LA LARGEST GRAPHITE OPERATION IN IN TH THE WESTERN WORLD "

slide-2
SLIDE 2

FORWARD-LOOKING & CAUTIONARY STATEMENTS

Cautionary Statements Regarding Forward Looking Information This presentation contains "forward-looking information" within the meaning of the applicable securities legislation. All information contained herein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can be identified notably by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations

  • f such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or

"be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: (i) volatile stock prices; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv) the risk associated with exploration, development and

  • perations of graphite; (v) the risk associated with establishing title to mineral properties and assets; (vi) the risks associated with

entering into joint ventures; (vii) fluctuations in graphite prices; (viii) the risks associated with uninsurable risks arising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experienced personnel and financing; * (x) access to adequate infrastructure to support mining, processing, development and exploration activities; (xi) the risks associated with changes in the mining regulatory regime governing the Company; (xii) the risks associated with the various environmental regulations the Company is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) the reliance on key personnel; (xv) liquidity risks;; (xvi) the risk of litigation; and (xvii) risk management. Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in graphite prices, exploration and development plans to proceed in accordance with plans and such plans to achieve their stated expected outcomes, receipt of required regulatory approvals, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided for the purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for other

  • purposes. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made

as of the date of this press release, and the Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9

2

slide-3
SLIDE 3

PRESENTATION OVERVIEW

OUR COMPANY 4 TH THE E GRAPHITE MARKET 20 20 PROCESS & PRODUCTS 25 25 CAPIT ITAL MARKETS 32 32

slide-4
SLIDE 4

OUR COMPANY

slide-5
SLIDE 5

SERVING TOMORROW’S ECONOMY

WITH THE SUSTAINABLE DEVELOPMENT OF OUR NATURAL RESOURCES

✓Reliable, low-cost player in the traditional graphite markets ✓Innovation in the value-added graphite markets ✓Walking the talk : aiming at being the world’s first all-electric open-pit mine

Our

ur mission is to produce, transform and distribute different types of natural graphite flakes, in a profitable and sustainable way, while meeting the growing needs of the industrial markets motivated by the revolution of renewable energy and electric vehicles.

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 5

slide-6
SLIDE 6

COMPANY OVERVIEW

SUCCESSFUL TRANSITION FROM EXPLORATION TO DEVELOPMENT & NEAR-TERM PRODUCTION

✓ NMG started exploration in 2012, utilizing advanced geophysics technology. The Tony Block Deposit was discovered in 2015. ✓ Explored over 10,000 km of untapped territories ✓ Only new discovery of graphite in North America since Lac Guéret deposit (Mason Graphite) in 2001 ✓ Same geological setting as the only significant graphite mine in North America (the

  • ne owned by Imerys

Graphite & Carbon)

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 6

slide-7
SLIDE 7

AN EXCEPTIONAL TEAM

TO GRAPHITE EXPERTS

ER ERIC IC DESAULNIERS, MSc, P.

  • P. Ge

Geo Fou

  • under, Pr

President, Ch Chief f Exe Executi tive Offic Officer (CE CEO), Directo tor

  • 12 years of experience as a Professional Geologist with a Masters

degree in Geophysics

  • Executed mandates for international companies such as Aramco,

Shell, NASA, BRGM and GSC

  • 7 years as an Infantry Officer with Canadian Forces

CH CHARLES-OLIVIER TARTE, CP CPA, CMA CMA Ch Chief f Financial al Off Officer (CFO CFO)

  • Financial Controller from 2011 to 2016 for Imerys Graphite &

Carbon

  • Responsible of the financial management of 3 sites and 2

corporations (Canada & USA): open-pit mining site, value-added processing plant and sales office KARL L TRUDEAU Ch Chief f Op Operati ting Offi Officer (COO)

  • Natural Graphite Operations Leader and Mine Site Manager at

Lac-des-Iles from 2011 to 2017 for Imerys Graphite & Carbon

  • Experience worldwide developing mineral deposits into producing

assets TRIS ISTAN C.

  • C. MENARD

Exe Executi tive Vi Vice ce-President (EVP), ), Ca Capita tal Mar arkets

  • Formerly Portfolio Manager and Associate at Jarislowsky Fraser,

a firm managing over $40 billions in assets for private and institutional clients

  • Holds the Chartered Investment Manager designation

ZHENGLI LI (Andrew) TAN MSc Eng Eng – Technical Director

  • Over 20 years of experience in graphite & carbon industry
  • Former General Manager of a value-added graphite plant in

China for SGL Group ARMANDO FARHATE B. B.En Eng, MBA BA – Mar arket Lea eader

  • Former COO for Nationale de Grafite in Brazil in charge of 3

graphite mining and processing plants

  • Former Natural Graphite Product Director at Imerys Graphite &

Carbon PA PATRICE BO BOULANGER Ing, g, MBA BA – Director

  • 20 years of experience in R&D and sales in the graphite business

with SGL Carbon BE BENOIT BRIE BRIERE Pl Plant Man Manager

  • 25 years operation and customer service experience in graphite

at Lac-des-Iles Imerys mine

FROM SENIOR MANAGEMENT

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 7

slide-8
SLIDE 8

NORTH AMERICA’S GRAPHITE TRIANGLE

ABOUT IM IMERYS

✓ Disclosed that Lac-des-Îles mine is nearly depleted (2020-2021)

(Source : Graphite and Graphene Conference, F. Corti, Berlin, Dec 2014)

✓ Major industrial French conglomerate with a market value of approximately

~€3.5B

✓ Output varying between 20K to 25K tons per year which represents 25%- 30% of North American demand ✓ Proven track record of producing and selling high quality graphite concentrate since 1989

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 8

slide-9
SLIDE 9

All $ in CAD unless indicated otherwise *NMG results based on NI 43-101 Pre-Feasibility Study for the West Zone

ROBUST PROJECT ECONOMICS

FOR MINING PROJECT ONLY (DOES NOT INCLUDE THE VALUE-ADDED PROCESSING PHASE)

**(source: https://mwne.ws/2ArUOQR)

Economic ic Hig ighlights Fea Feasibility stud study (O (October 201 2018)

Yearly Graphite Concentrate Production 100,000 tonnes Pre-Tax NPV @ 8% $1,287M ($US985M) Post-Tax NPV @ 8% $751M ($US575M) Pre-Tax IRR 40.6 % Post-Tax IRR 32.2 % Line of Mine (LOM) 25.5 years Pre-Tax Payback 2.6 years Post-Tax Payback 2.2 years Initial CAPEX $276M ($US211M) (incl. 12.4% contingency) Average Sales Price (First 5 Years) $US1,532/tonne Average Sales Price (LOM) $US1,730/tonne OPEX $499($US382)/tonne

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 9

slide-10
SLIDE 10

COMPARABLES & PRODUCT

NMG ROW NA

750 1 500

EBI BITDA Cur urve per r to tonne

NMG ROW NA

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 10

10 ✓ Best EBITDA margin per tonne

  • f all graphite projects on the

planet ✓ Low-cost producer

500 1 000

C1 1 Cost Cur urve per r to tonn nne

slide-11
SLIDE 11

SENSITIVITY ANALYSIS

200 400 600 800 1000

  • 30
  • 20
  • 10

10 20 30

After-Tax NPV @ 8% (M CAD)

RELATIVE VARIATION (%)

CAPEX OPEX PRICE

10,0 20,0 30,0 40,0 50,0

  • 30
  • 20
  • 10

10 20 30

After-Tax IRR (%)

RELATIVE VARIATION (%)

CAPEX OPEX PRICE WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 11

11 STRONG MARGIN OF SAFETY

AFTE AFTER-TAX IRR RR NO NORTH OF F 20% EVEN VEN IF F GRA GRAPHITE E PRI RICES S DEC ECLI LINE E BY BY 30%

slide-12
SLIDE 12

✓ The town of St-Michel-des-Saints, which is located within 10 km of the mine site provides skilled labor & infrastructures ✓ Only 150 km north of Montreal with all-year access to public roads ✓ Proximity to infrastructures and potential customers ✓ No campsites needed ✓ Access to low-cost green hydroelectricity ✓ Strategically located for low cost transportation to end-users across North America

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 12

12

UNIQUE, STRATEGIC & ADVANTAGEOUS LOCATION

MINIMIZING CAPEX AND OPEX WHILE MAXIMIZING ECONOMICS

slide-13
SLIDE 13

GENERAL SIT ITE LAYOUT

FAVORABLE PROXIMITY BETWEEN MINE SITE & PLANT SITE

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 13

13

slide-14
SLIDE 14

GEOLOGICAL FEATURES

LARGE & QUALITY RESOURCE AT SURFACE @ 1:1 STRIP RATIO

As s at t Ju June 2018

West est Zo Zone Res Resource Est Estim imate

✓ Indicated : 95.8M tons @ 4.28% Cg* ✓ Inferred : 14M tons @ 4.19% Cg ✓ 4. 4.69M ton tons of

  • f Gra

raphite Con Content

So South Zo Zone Res Resource e Est Estim imate

✓ Indicated : 26.3M tons @ 3.73% Cg ✓ Inferred : 19.2M tons @ 3.67% Cg ✓ 1.7M .7M ton tons of

  • f Grap

raphite Co Content * Cut-off Grade

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 14

14

slide-15
SLIDE 15

DEMONSTRATION PLANT (PHASE 1)

SIGNIFICANTLY DE-RISKING OUR OPERATIONS ✓ 20,000 M2 FACILITY ✓ 1,000 TPY IN 2019 & 2020

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 15

15

slide-16
SLIDE 16

PIONEERING THE FIRST ALL-ELECTRIC OPEN-PIT MINE IN THE WORLD

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 16

16

WE ARE WORKING WITH WORLD-CLASS EV TECHNOLOGY PARTNERS

slide-17
SLIDE 17

CONSTRUCTION TIMELINE

CO COMMERCIAL SPH PHERICAL GR GRAP APHITE PL PLAN ANT

SECURING STRATEGIC PARTNERSHIP FOR THE CONSTRUCTION OF THE

COMMERCIAL SCALE SG PLANT

CO COMMERCIAL MINE & CO COMMERCIAL FL FLAK AKE GR GRAP APHITE PL PLAN ANT

CONSTRUCTION STARTS IN H2 2020

PH PHAS ASE 2 DEM DEMONSTRATION PL PLAN ANT (SPH PHERICAL GR GRAP APHITE)

CONSTRUCTION STARTS IN Q2 2019

PH PHAS ASE 1 1 DEM DEMONSTRATION PL PLAN ANT (FL FLAK AKE GR GRAP APHITE)

1,000 TPY PRODUCTION 2019-2020

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 17

17

slide-18
SLIDE 18

HYDRO-QUÉBEC PARTNERSHIP

A WORLD LEADER IN BATTERY MATERIALS

✓ State of the art research center ✓ Over 800 patents in Li-Ion, Li-Sulfur and Li- Air battery technologies ✓ 70 employees including 27 researchers ✓ Headed by Dr. Karim Zaghib, named one of the most influential scientific minds in the world by Clarivate Analytics for 3 years in a row

PARTNERSHIP AT A GLANCE

▪ Licensing agreement on all HQ existing technologies used for LiB anode material production ▪ Exclusive R&D collaboration to develop new IP on a 50/50 basis and industrialization ▪ HQ is to assist NMG in setting up a small-scale process in its demonstration plant in Saint-Michel- des-Saints in 2019 ▪ The success of this small-scale process will enable NMG to eventually build an anode material fabrication plant with a capacity of up to 100k tonnes per year. The anode material fabrication plant would be in addition to and complementary to NMG’s flake graphite plant

AGREEMENT HIGHLIGHTS

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 18

18

slide-19
SLIDE 19

✓ SUMMER 2018: COMMISSIONING OF GRAPHITE CONCENTRATE DEMONSTRATION PLANT (PHASE 1) ✓ SEPTEMBER 2018: BEGINNING OF 1,000 TPY PRODUCTION AT THE PHASE 1 DEMONSTRATION PLANT ✓ Q4 2018: RELEASING BANKABLE FEASIBILITY STUDY (BFS) ❑ Q1 2019: SECURING MARKETING AND SALES AGREEMENTS FOR DEMO PLANT (OFF-TAKES) ❑ Q2 2019: BEGINNING THE SPHERICAL GRAPHITE (SG) DEMONSTRATION PLANT CONSTRUCTION (PHASE 2) ❑ Q1 2019: IBA FILING FOR PERMIT ❑ SUMMER 2019: ECONOMICAL STUDY TO INCLUDE VALUE-ADDED PROCESSING PHASE ❑ H2 2019: COMMISSIONING OF THE DEMONSTRATION SG PLANT ❑ H1 2020: PROJECT FINANCING (COMMERCIAL SCALE) ❑ H1 2020: SECURING STRATEGIC PARTNERSHIPS FOR THE CONSTRUCTION OF THE COMMERCIAL SCALE SG PLANT ❑ H2 2020: STARTING THE COMMERCIAL SCALE MINE AND CONCENTRATOR CONSTRUCTION ❑ H1 2022: FULL COMMERCIAL SCALE PRODUCTION

RECENT AND UPCOMING MILESTONES

2018-2020

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 19

19

slide-20
SLIDE 20

THE GRAPHITE MARKET

slide-21
SLIDE 21

GLOBAL PRO RODUCTION PER R LO LOCATION

67% 15% 9% 2% 7% China India Brazil Canada Other

A LANDSCAPE DOMINATED BY CHINA AND THE REFRACTORIES

MARKET OVERVIEW

✓ Global yearly consumption: 1,1 million tons ✓ Typical mine production: ~10k-20k tpy ✓ Current North American Market : Consumption of 80k tpy vs Production of 20k tpy

Refractories 35% Batteries 25% Lubricants and crucibles 10% Metallurgy 7% Pencils 4% Others 19%

MAIN IN USE SES FOR FOR GRAP RAPHITE

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 21

21

slide-22
SLIDE 22

GRAPHITE PRIC ICE

The Lithium-Ion Battery (LiB) market has had a significant impact on graphite price since September 2017 Source: Benchmark Mineral Intelligence

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 22

22

slide-23
SLIDE 23

THE NORTH-AMERICAN LANDSCAPE

✓ EXPECTED SHORT TERM DEMAND IN EXCESS OF 150,000 TPY

NE TX AL TE NC IN MI ON QC

Supply Demand

Production capacity of 100k tpy until 2045

Production capacity of ~ 20k tpy with expected full depletion in 2020-2021 WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 23

23

GA

slide-24
SLIDE 24

THE LI-ION BATTERY LANDSCAPE

An expected graphite demand increase

  • f 530,000 tpy by 2023
  • f 1,323,000 tpy by 2028

Capacity 2028: 1102.5 GWh

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9

✓ 2017 Capacity: 112 GWh (+40GWh non megafactory) ✓ 2023 Capacity : 441.5 GWh ✓ 2028 Capacity: 1102.5 GWh

24 24

slide-25
SLIDE 25

PROCESS & PRODUCTS

slide-26
SLIDE 26

Pro Produ ducts NMG Dist istrib ibutio ion Targ arget mark arket Jumbo (+48 mesh) 15% Expandable , Fuel Cell & Traditional Large (+80 mesh) 33% Traditional Medium (+150 mesh) 28% Battery & Traditional Fines (-150 mesh) 24% Battery & Traditional

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 26

26

MATAWINIE PROJECT FLAKE DIS ISTRIBUTION

✓ NMG is ready to tackle all markets ✓ Graphite milling recovery of over 94% ✓ Finished product concentrate purity over 97%

slide-27
SLIDE 27

Process

Graphite Ore Crushing

Grinding

(ball mill)

First Flotation

Grinding

(polishing mill)

Second Flotation

GRAPHITE CONCENTRATE PRODUCTS FROM MATAWINIE PROJECT

FLAKE GRAPHITE PRICE IS BASED ON FLAKE SIZE AND PURITY

Pu Puri rity: :

4,5% Cg 85-90% Cg >97% Cg

Prod roducts ts

Jumbo Flakes (+48 mesh) Large Flakes (+80 mesh) Medium Flakes (+150 mesh) Fine Flakes (-150 mesh)

Qua uantit ity

15% 33% 28% 24%

*Pr Price ce Ra Range

(USD per per Ton Tonne):

$2,548 $1,643 $1,263 $1,065 Average Price per Tonne – Fisrt 5-YR: $1,532 USD

*Source: Benchmark Mineral Intelligence; prices based on the previous 60-month average. WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 27

27

slide-28
SLIDE 28

«Our ba battery sh should be be ca called Nic ickel-Graphite»

  • Elon Musk, June 2016

(Li (Li-Ni Ni-Mn Mn-Co Co-Al Al-Fe Fe-Phosphate) (G (Gra raphite)

LI LI-ION BATTERY : MAJOR GROWTH POTENTIAL FOR GRAPHITE

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 Tesla Model 3 Performance

75 kWh = 90kg of graphite

✓ 1 kWh of capacity  1.2 kg of graphite

̴15% of battery cell mass

28 28

slide-29
SLIDE 29

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9

GRAPHITE AND THE LIT ITHIUM-ION BATTERY

$7 $715/% of

  • f batt

attery cell ell mas ass

29 29

slide-30
SLIDE 30

Prod roducts ts

Jumbo Flakes (+50 mesh) Large Flakes (+80 mesh) Medium Flakes (+100 mesh) Fine Flakes (-100 mesh)

TARGETED VALUE-ADDED MARKETS

A WIDE RANGE OF MARGIN ACCRETIVE PRODUCTS

Purification to >99,9% Cg Micronization Shaping Electrochemical Treatment

Price Range

Expa panda dable Gra Graph phite te Purified Graph phite te Concentrate te Purified Micronize zed Gra Graph phite te Sph pherical Gra Graph phite te

Pro Produ ducts : $US US3,0 ,000 - $US US15 15,0 ,000/tonne

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 30

slide-31
SLIDE 31

CAPIT ITAL MARKETS

slide-32
SLIDE 32

CAPITAL MARKETS

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 32

32 ST STOCK METRICS

Share Price ($CAD) as at January 8, 2019 $0.28 Market Cap ($CAD) as at January 8, 2019 $50M 52-Week High/Low ($CAD) $0.25-$0.45 Beta 1,06 P/B Ratio 1,8 VWAP 0,2772 Average Daily Volume 150k Cash/Debt ($CAD) as at 10-2018 ~$5M/$0 Management & Insiders Ownership ~25% 2-YR STOCK PRICE COMPARISON CHART FOR NOUVEAU MONDE GRAPHITE, MASON GRAPHITE AND SYRAH RESOURCES

slide-33
SLIDE 33

*All currency in Canadian Dollars (CAD). Market data and financial data as of December 21, 2018

CA CAPITAL ST STRUCTURE

Shares Outstanding as of January 8, 2019 175,311,126 Warrants Outstanding 52,039,727 Broker Warrants Outstanding 1,577,705 Advisory Warrants Outstanding 1,771,665 Options Outstanding 11,500,000 Fully Diluted Shares Outstanding 242,200,223

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 33

CAPITAL MARKETS (CONT’D)

Fir Firm An Analyst st Loc Locatio ion

Eight Capital David A. Talbot Toronto, ON Beacon Securities Ltd Ahmad Shaath Toronto, ON

ANALYST COVERAGE

slide-34
SLIDE 34

INSTITUTIONAL SHAREHOLDERS

STRONG INSTITUTIONAL SUPPORT REPRESENTING ̴30% OF TOTAL SHARES OUTSTANDING

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 34

34

slide-35
SLIDE 35

WWW.NOUVEAUM UMONDE.CA :: : TSXV:NOU :: OT OTCQX:NMGRF :: : FSE FSE:N :NM9 35

NMG IN A NUTSHELL

✓ Projected to operate the larg rgest gra graphit ite ope

  • peratio

ion in the western world ✓ Aiming at being the world’s first all-elect ctric ic ope

  • pen-pit mine (strong

environmental mindset) ✓ Partnership with Hydro-Québec ✓ Positioned to take advantage of the on

  • ngoin

ing EV EV rev evolution ✓ Favorable supply and demand market dynamics for graphite ✓ High-quality deposit yields fi finis ished pro product ct con conce centra rate pu puri rity of

  • f ove
  • ver 97%

97% ✓ A pro proven man anagement team team that can deliver ✓ Best Best-in in-cla lass ss EB EBITDA margin per tonne ✓ Reliable, low cost cost pla player r in the traditional graphite market ✓ Unique, advantageous & str strategic c loc

  • cation

✓ Optimal shareholder base and pos posit itive int nteractio ions s wi with stak stakeholders ✓ Ability to tackle a wi wide range of

  • f margin

in ac accretive pr products

WHY YOU SHOULD BE A PART OF THE JOURNEY

slide-36
SLIDE 36

Head Offj ffjce 331 Brassard St-Michel-des-Saints, QC J0K 3B0 Canada Montreal Offj ffjce 410 St. Nicolas Street, Suite 236 Montreal, QC H2Y 2P5 Canada

TSXV : NOU OTCQX : NMGRF FSE : NM9

CONTACT INFORMATION

Co Contact Eri Eric Desa Desaulnie iers President and CEO +1-819-923-0333 edesaulniers@nouveaumonde.ca Tr Tris istan C.

  • C. Men

enard Executive Vice-President, Capital Markets +1-514-296-6339 tmenard@nouveaumonde.ca