GoBabyGo
Ali Mohammad Hakem Almutairi Abdulla Almutairi Ali Albaloushi Project Mentor: Ashwija Korenda
1
GoBabyGo Ali Mohammad Hakem Almutairi Abdulla Almutairi Ali - - PowerPoint PPT Presentation
GoBabyGo Ali Mohammad Hakem Almutairi Abdulla Almutairi Ali Albaloushi Project Mentor: Ashwija Korenda 1 Overview: Clients Introduction Current status WBS Overview WBS of Ali Mohammad WBS of Hakem
1
2
University of Delaware.
3
to socialize, improve posture and reduce depression.
applying it on the wild thing.
forward with the project.
4
Winfree.
materials arriving late.
because of IT.
5
6
What is Work Breakdown Structure (WBS)? “A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables”
7
8
9
Activities and Tasks:
○ Different motors to accommodate different designs
○ Code language that will modify the hardware to function accordingly.
○ Report. ○ Powerpoint presentation.
Activities and tasks:
○ Supported cushion for the seat. ○ Buttons to control the flippers. ○ Shovel to hold and kick ball the ball while driving.
○ Test drive.
○ Report. ○ Powerpoint presentation.
10
11
Activities and tasks:
○ Follow the order with Ashwija.
○ Report. ○ Powerpoint presentation.
12
Activities and Tasks:
○ Different designs as a back- up plan.
○ Powerpoint presentation.
○ Testing Report. ○ Project report.
○ Working on first Design. ○ Website is ready, but waiting for IT to get permission for uploading.
○ Two weeks delay because of materials/hardware arriving late.
○ More group meetings to get back on track.
13
https://www.workamajig.com/blog/guide-to-work-breakdown-structures-wbs. [Accessed: 26-Feb-2019]. “Overview,” TCWP. [Online]. Available: http://www.tcwp.org.uk/. [Accessed: 26-Feb-2019].