Glow Group Glow Group is a group of energy companies, with its core - - PowerPoint PPT Presentation

glow group
SMART_READER_LITE
LIVE PREVIEW

Glow Group Glow Group is a group of energy companies, with its core - - PowerPoint PPT Presentation

E mpowering P rogress Glow Group Glow Group is a group of energy companies, with its core business in generating and supplying electricity, steam, clarifjed, demineralized and chilled water to its customers. Glows business is divided into


slide-1
SLIDE 1

Empowering Progress

slide-2
SLIDE 2

Glow Group is a group of energy companies, with its core business in generating and supplying electricity, steam, clarifjed, demineralized and chilled water to its customers. Glow’s business is divided into Independent Power Producer (IPP) and Cogeneration business lines. We have total generating capacity of 3,206.668 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of processed water and 3,400 refrigerated tons of chilled water. Glow Energy Public Company Limited or GLOW is publicly listed on The Stock Exchange of Thailand and 69.11% (Figures at December 2015) owned by ENGIE.

Glow Group

slide-3
SLIDE 3

The IPP business has total generating capacity of 1,525 MW of electricity, selling electricity mainly to the Electricity Generating Authority of Thailand (EGAT) under Thailand’s Independent Power Producer program, as well as electricity to Electricite du Laos (EDL). The IPP business comprises of Glow IPP combined cycle gas-fjred power plant, located in Hemaraj Chonburi Industrial Estate, Chonburi Province; GHECO-One super critical coal fjred power plant, located in Map Ta Phut Industrial Estate, Rayong Province; and Houay Ho hydro- electric power plant located in Attapeu Province, Lao People’s Democratic Republic. Cogeneration business has 30 reliable units with total generating capacity of 1,680.118 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of clarifjed and demineralized water and 3,400 refrigerated tons of chilled

  • water. These units produce electricity that is sold to EGAT

3,206.668

megawatt

  • f electricity

1,206

tons per hour

  • f steam

5,482

cubic meters per hour

  • f processed water

3,400

refrigerated tons

  • f chilled water

under the Small Power Producer (SPP) program, as well as electricity, steam, clarifjed, demineralized and chilled water to industrial customers in the Map Ta Phut Industrial Estate and nearby industrial estates, as well as in Siam Eastern Industrial Park at Pluak Daeng District, Rayong Province. With regards to the renewable energy business, Glow Group has developed Glow Energy solar power plant in order to promote electricity generation from renewable energy. Glow Energy Solar is the fjrst solar power plant in Rayong province. We are very proud that we achieved the trust of all our

  • customers. Looking forward, we are committed to a continuous

program of quality improvements aimed at increasing the competitiveness of our customers and the economy

  • f Thailand. At the same time, our reliable, efficient and

environmentally responsible operations ensure a sustainable relationship with the environment and society.

slide-4
SLIDE 4
slide-5
SLIDE 5

Corporate Structure

Renewable Energy Business

  • Glow Energy Solar Power Plant
  • Glow SPP 2 / Glow SPP 3 Power Plant
  • Glow SPP 1 Power Plant
  • Glow SPP 11 Phase 1 & 3 Power Plant
  • Glow SPP 11 Phase 2 Power Plant

Cogeneration Business IPP Business

  • Glow IPP Power Plant
  • GHECO-One Power Plant
  • Houay Ho Power Plant
  • Glow Energy Phase 1 Plant
  • Glow Energy Phase 2 Power Plant
  • Glow Energy Phase 4 Power Plant
  • Glow Energy Phase 5 Power Plant
  • Glow Energy CFB 3 Power Plant
slide-6
SLIDE 6

Mission, Vision, and Business Fundamentals

Vision

We are a leading power generation company providing sustainable and reliable energy solutions based on innovative use of diversifjed energy sources.

Mission

  • Create value for our shareholders and customers in a sustainable manner through

reliable products, profjtable growth and knowledgeable employees with network of expertise.

  • Perform the business by developing and implementing environmentally and socially

responsible projects while improving the quality of life of communities in areas where we do business.

slide-7
SLIDE 7

Business Fundamentals

Operational Excellence

  • No compromises in environment, health and safety
  • Maintain high customer satisfaction
  • Continuously improve supply reliability
  • Continuously improve project execution processes
  • Continuously improve reporting and management tools and processes
  • Reduce production costs and increase productivity
  • Reduce cost of capital

Profitable Growth

  • Expand Cogeneration businesses in Thailand with high-load industrial

customers who value reliability

  • Expand IPP business in Thailand
  • Expand and seek business in neighboring countries
slide-8
SLIDE 8

Our Facilities

GHECO-One Power Plant

Location : Map Ta Phut Industrial Estate, Rayong Production Capacity : Power 660 MW Commercial Operation Date : August 2012 Type of Fuel : Bituminous coal

Glow IPP Power Plant

Location : Hemaraj Chonburi Industrial Estate, Chonburi Production Capacity : Power 713 MW Commercial Operation Date : January 2003 Type of Fuel : Natural gas

slide-9
SLIDE 9

Houay Ho Power Plant

Location : Attapeu province, Lao PDR Production Capacity : Power 152 MW Commercial Operation Date : September 1999

Glow Energy Phase 1 Plant

Location : Map Ta Phut Industrial Estate, Rayong Production Capacity : Steam 250 t/hr., Clarifjed water 1,110 cu.m./hr., Demineralized water 230 cu.m./hr. Commercial Operation Date : July 1994 Type of Fuel : Natural gas

Glow Energy Phase 2 Power Plant

Location : Map Ta Phut Industrial Estate, Rayong Production Capacity : Power 281 MW, Steam 300 t/hr., Clarifjed water 900 cu.m./hr., Demineralized water 280 cu.m./hr. Commercial Operation Date : April 1996 Type of Fuel : Natural gas

slide-10
SLIDE 10

Glow SPP 2 / Glow SPP 3 Phase 3 Glow Energy Phase 4 and CFB 3 Power Plant

Location : Map Ta Phut Industrial Estate, Rayong Production Capacity : Power 675 MW, Steam 406 t/hr., Clarifjed water 1,500 cu.m./hr., Demineralized water 700 cu.m./hr. Commercial Operation Date : March 1999, January 2005 and November 2010 Type of Fuel : Natural gas and Bituminous Coal

Glow Energy Phase 5 Power Plant

Location : Map Ta Phut Industrial Estate, Rayong Production Capacity : Power 328 MW, Steam 160 t/hr. Commercial Operation Date : September 2011 Type of Fuel : Natural gas

Glow SPP 1 Power Plant

Location : Hemaraj Eastern Industrial Estate (Map Ta Phut), Rayong Production Capacity : Power 124 MW, Steam 90 t/hr., Demineralized water 190 cu.m./hr. Commercial Operation Date : February 1998 and November 1999 Type of Fuel : Natural gas

slide-11
SLIDE 11

Glow SPP 11 Phase 1 & 3 Power Plant

Location : Siam Eastern Industrial Park, Rayong Production Capacity : Power 162.118 MW, Chilled water 2,200 RT, Clarifjed water 300* cu.m./hr., Demineralized water 60* cu.m./hr. Commercial Operation Date : October 2000, October 2006 and April 2015 Type of Fuel : Natural gas

Glow SPP 11 Phase 2 Power Plant

Location : Siam Eastern Industrial Park, Rayong Production Capacity : Power 110 MW, Chilled water 1,200 RT, Clarifjed water 200* cu.m./hr., Demineralized water 12* cu.m./hr. Commercial Operation Date : December 2012 Type of Fuel : Natural gas

Glow Energy Solar Power Plant

Location : Asia Industrial Estate, Rayong Production Capacity : Power 1.55 MW Commercial Operation Date : August 2012

Remark: * Raw material for chilled water

slide-12
SLIDE 12

ENGIE develops its businesses (power, natural gas, energy services) around a model based on responsible growth to take on the major challenges of energy’s transition to a low-carbon economy: access to sustainable energy, climate- change mitigation and adaptation, security of supply and the rational use of resources. The Group provides individuals, cities and businesses with highly effjcient and innovative solutions largely based on its expertise in four key sectors: renewable energy, energy effjciency, liquefjed natural gas and digital technology.

ENGIE

slide-13
SLIDE 13

Anti-Bribery Policy

Glow Group is committed to conducting business in full compliance with anti-bribery laws/regulations, ENGIE Ethic Charter and Glow Group’s Anti-Bribery Policy. Glow Group regards compliance with anti-bribery laws/regulations crucially important, and everyone who acts for Glow Group is expected to apply the highest standards of integrity to all their activities, and to comply fully with the Glow Group ethical principles, policies, procedures and processes. This will ensure that Glow Group’s activities and operations are aligned with ethical responsibilities, and maximize the long term sustainability of

  • ur business and of the communities in which we operate.

Gift Travel Hospitality

NO NO NO

Think ethically; Act transparently; No tolerance for any form of corruption.

slide-14
SLIDE 14

During the 20 years Glow has been operating in Thailand, we have always placed great emphasis on growing our business

  • responsibly. We realize the importance of society in economic,

environmental and social development and how valuable the sustainable relationship with our stakeholders is. We, therefore,

  • perate our business with integrity and transparency by taking into

account the interests benefjt of all involved parties. We place great emphasis on operating and living in harmony with society in general and local communities in the areas where we

  • perate. Therefore, we have initiated and continue to support multiple

projects aimed at enhancing people’s quality of life, improving educational fundamentals and preserving the environment, both in communities in areas where we operate and in remote or less developed areas of Thailand and Lao PDR.

Corporate Social Responsibilities

slide-15
SLIDE 15
slide-16
SLIDE 16

Environmental, Health and Safety Management

consumption, energy conservation, industrial waste and biodiversity management on a continuous basis. We have also used efgective environmental and safety management systems in accordance with established international standards such as ISO 14001, TIS18001 to protect the environment. In addition, Glow Group has strictly followed the ENGIE Group of Glow Group on the “Environmental Charter” and the “Occupational Health and Safety Charter” as Group’s core policies. Glow Group has committed itself to conducting its core business in a socially and environmentally responsible way. We also realize that our electricity generation process may have an impact on the environment and nearby communities. We have a policy to use the best state-of-the-art and environmentally friendly technology and to strictly follow the rules and regulations regarding occupational health and safety. The Group is implementing an environmental monitoring program for air emissions, water and natural resources

slide-17
SLIDE 17
slide-18
SLIDE 18

GLOW GROUP

Head Office

1 Empire Tower, 38th Floor - Park Wing, South Sathorn Road, Yannawa, Sathorn, Bangkok 10120 Tel: 0 2670 1500 - 1 Fax: 0 2670 1548 - 9

Rayong – Map Ta Phut

11 I - 5 Road, Map Ta Phut Industrial Estate, Muang District, Rayong 21150 Tel: 0 3869 8400 - 10 Fax: 0 3868 4789

slide-19
SLIDE 19

Rayong – Pluak Daeng

60/19 Moo 3, Siam Eastern Industrial Park, Map Yang Porn, Pluak Daeng District, Rayong 21140 Tel: 0 3889 1324 - 8 Fax: 0 3889 1330

Chonburi

42 Moo 8, CIE - 8 Road, Hemaraj Chonburi Industrial Estate, Bowin, Sriracha District, Chonburi 20230 Tel: 0 3834 5900 - 5 Fax: 0 3834 5906

Houay Ho

P .O. 661 Pakse, Lao PDR. Tel: (856) 36 211 720 - 1 Fax: (856) 36 211 719

slide-20
SLIDE 20

www.glow.co.th

slide-21