www.geronimoenergy.com 1
www.geronimoenergy.com 1 c@J Wild Springs Solar GERONIMO " - - PowerPoint PPT Presentation
www.geronimoenergy.com 1 c@J Wild Springs Solar GERONIMO " - - PowerPoint PPT Presentation
www.geronimoenergy.com 1 c@J Wild Springs Solar GERONIMO " ENERGY a nat io nal grid company Project Developer Wild Springs Solar, LLC, a wholly owned subsidiary of Geronimo Energy, LLC, a National Grid Company We develop,
www.geronimoenergy.com 2
Wild Springs Solar
Project Developer
- Wild Springs Solar, LLC, a wholly owned subsidiary of
Geronimo Energy, LLC, a National Grid Company
- We develop, construct, own, and operate renewable
energy projects
- 2,400 MW of wind and solar in operation or under
construction
- ~100 utility-scale and community solar projects
completed
128 MW Solar Energy Facility
- Located south of New Underwood in Pennington County
- Project Area ~1,499 acres with voluntary lease
agreements
- Interconnect to the WAPA New Underwood Substation
- PPA executed for 2022 COD with construction as early
as fall 2021
;--;-...-__
,-
1 3,pid City I East UT
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 3
Economics
~150 construction jobs, ~4 full-time jobs ~$12 million in new tax revenue over 20 years ~$190 million in capital infrastructure improvements Hundreds of thousands in increased local and state spending ~$500,000 in new charitable funding for host community
- ver 20 years – unique to Geronimo
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 4
- Local: Conditional Use
Permit from Pennington County
- State: Facility Permit from
the SD PUC
- Federal: Environmental
Assessment/FONSI from WAPA
Permitting Overview and Field Studies
STUDY STATUS Sharp-tailed Grouse and Greater Prairie Chicken Lek Surveys Complete – No Leks Identified in 2017 or 2020 Ground Based Raptor Nest Surveys
Complete – No Raptor Nests identified in Project Area
Wetland Delineations Jurisdictional Determinations Received Cultural Resource Surveys SHPO Concurrence Received Breeding Bird Surveys (June 2020 and years 2 & 4 post construction)
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 5
6/24/2020
www.geronimoenergy.com
5
~·
'
1 2. An inverter's job is
to convert DC electricity into Alternating Current (AC) electricity.
- <> 1. Sun beams radiate
- nto solar panels (A) . Solar
panels then convert the solar energy into Direct Current (DC) electricity. The DC electricity is then sent to the inverter (B).
0 ~-,
~
- 3. AC electricity is then
pumped into the local electric grid, either through transmission lines (C} or via local distribution lines or substations (D).
- 4. The electricity produced by solar
energy projects is high quality and offers many electrical grid benefits, such as reducing power fluctuations and providing energy at peak demand times (such as in the middle of a hot summer when air conditioners are constantly running).
www.geronimoenergy.com 6
Solar Project Footprint
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 7
What Does it Look Like Inside the Fence?
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 8
Blue Stone Solar Before
What Does It Look Like from a Road?
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 9
Blue Stone Solar After
What Does It Look Like from a Road?
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 10
Key Parts of a Solar Facility – Access Roads
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 11
Key Parts of a Solar Facility – Delivery
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 12
Key Parts of a Solar Facility – Pier Installation
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 13
Key Parts of a Solar Facility – Solar Array
a: . •
,I)...
l .
c@J
GERONIMO"
ENERGY
a nationalgrid companyJ PM (45 DECREES)
9 AM ( 45 DECREES) TYPICAL SOLAR TRACKER PROFILE VIEWS {9 .M.,
2 P.M., J P
- )
www.geronimoenergy.com 14
Key Parts of a Solar Facility – Elect. Collection
- Electrical collection system will be
installed below-ground, above- ground, or a combination of both:
- Below-ground: DC collection providing
power to the inverters and AC collection providing stepped up power from inverter skids to substation trenched or ploughed.
- Hybrid: DC collection providing power to
the assigned inverter/transformer skid strung above-ground under panels. AC collection providing stepped up power from inverter skids to substation trenched
- r ploughed.
Above-ground DC Trenching cables
CAS SYSTEM MOUNTING ,, aRACKET 4' STEEL M ESS£NGE R WJRE USf NUMSER OF CONDUITS AS RE QU'.RED. TWO ORCUITS PER CONDUIT. D!R.ECT BUR Y OR ARMORED CAN ALSO SEl&D IN PlACE
OF CONDUIT.c@J
GERONIMO"
ENERGY
a nationalgrid company S!Dt\/PN :NVERTER MED[W.c,
www.geronimoenergy.com 15
Key Parts of a Solar Facility – Substation
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 16
Key Parts of a Solar Facility – Restoration/Revegetation
c@J
GERONIMO"
ENERGY
a nationalgrid companywww.geronimoenergy.com 17
Contact Information
Melissa Schmit Director, Permitting melissa@geronimoenergy.com 612-259-3095 Jay Hesse Senior Developer jay@geronimoenergy.com 701-809-8431 c@J
GERONIMO"
ENERGY
a nationalgrid company