Generalized Deligne- Beilinson cohomology and regulators Regulators IV in Paris May 23, 2016 Gereon Quick NTNU Euler, Abel and Jacobi: Let f(x) be a polynomial of degree 3 with simple roots. Euler, Abel and Jacobi: Let f(x) be a polynomial


slide-1
SLIDE 1

Generalized Deligne- Beilinson cohomology and regulators

Regulators IV in Paris May 23, 2016 Gereon Quick NTNU

slide-2
SLIDE 2

Euler, Abel and Jacobi: Let f(x) be a polynomial of degree 3 with simple roots.

slide-3
SLIDE 3

Euler, Abel and Jacobi: Let f(x) be a polynomial of degree 3 with simple roots. ⌡ ⌠ I(t):= 1/√f(x)dx.

t

We would like to evaluate the integral

slide-4
SLIDE 4

In modern terms:

slide-5
SLIDE 5

In modern terms: Set E:y2 = f(x) and consider the space E(C) of complex solutions. Set ω = dx/y.

slide-6
SLIDE 6

In modern terms: Set E:y2 = f(x) and consider the space E(C) of complex solutions. Set ω = dx/y. Then I(t) = ω for some point P on E(C). ⌠ ⌡0

P

slide-7
SLIDE 7

In modern terms: Set E:y2 = f(x) and consider the space E(C) of complex solutions. Set ω = dx/y. Then I(t) = ω for some point P on E(C). ⌠ ⌡0

P

Calculating the integral depends on the choice of a homotopy class of paths from 0 to P.

slide-8
SLIDE 8

In modern terms: Set E:y2 = f(x) and consider the space E(C) of complex solutions. Set ω = dx/y. Then I(t) = ω for some point P on E(C). ⌠ ⌡0

P

Calculating the integral depends on the choice of a homotopy class of paths from 0 to P. E(C) C E(C) ~ Euler: this is a group homomorphism. Hence P ⟼ I(P) is really a function on the universal cover E(C) of E(C): ~

slide-9
SLIDE 9

The Jacobian of E and the Abel-Jacobi map:

slide-10
SLIDE 10

Choose two closed loops γ1 and γ2 which form a basis of H1(E(C);Z)≈H1(S1xS1;Z)≈ZxZ. The Jacobian of E and the Abel-Jacobi map:

slide-11
SLIDE 11

Choose two closed loops γ1 and γ2 which form a basis of H1(E(C);Z)≈H1(S1xS1;Z)≈ZxZ. Let and be the periods of E. λ1= ⌠ ⌡γ1 ω λ2= ⌠ ⌡

γ2

ω The Jacobian of E and the Abel-Jacobi map:

slide-12
SLIDE 12

Choose two closed loops γ1 and γ2 which form a basis of H1(E(C);Z)≈H1(S1xS1;Z)≈ZxZ. Let and be the periods of E. λ1= ⌠ ⌡γ1 ω λ2= ⌠ ⌡

γ2

ω The Jacobian of E and the Abel-Jacobi map: The map P ⟼ ⌠ ⌡0 ω

P

defines an isomorphism E(C) → C/(Zλ1⊕Zλ2) ≈ Jac(E).

slide-13
SLIDE 13

Lefschetz’ s theorem for (1,1)-classes: For simplicity, let X⊂PN be a surface.

slide-14
SLIDE 14

Lefschetz’ s theorem for (1,1)-classes: Let {Ct}t be a family of curves on X (parametrized over the projective line P1). For simplicity, let X⊂PN be a surface.

slide-15
SLIDE 15

Lefschetz’ s theorem for (1,1)-classes: Let {Ct}t be a family of curves on X (parametrized over the projective line P1). Associated to {Ct}t is the family of Jacobians J := ⋃t Jac(Ct) For simplicity, let X⊂PN be a surface.

slide-16
SLIDE 16

Lefschetz’ s theorem for (1,1)-classes: Let {Ct}t be a family of curves on X (parametrized over the projective line P1). Associated to {Ct}t is the family of Jacobians J := ⋃t Jac(Ct) and a fibre space π: J → P1 (of complex Lie groups). For simplicity, let X⊂PN be a surface.

slide-17
SLIDE 17

Lefschetz’ s theorem for (1,1)-classes: Let {Ct}t be a family of curves on X (parametrized over the projective line P1). Associated to {Ct}t is the family of Jacobians J := ⋃t Jac(Ct) and a fibre space π: J → P1 (of complex Lie groups). A “normal function” 𝜉 is a holomorphic section of π. For simplicity, let X⊂PN be a surface.

slide-18
SLIDE 18

Normal functions arise naturally: Lefschetz’ s proof continued:

slide-19
SLIDE 19

Normal functions arise naturally: Let D be an algebraic curve on X. It intersects Ct in points p1(t),…, pd(t). Lefschetz’ s proof continued:

slide-20
SLIDE 20

Normal functions arise naturally: Let D be an algebraic curve on X. It intersects Ct in points p1(t),…, pd(t). Lefschetz’ s proof continued: Choose a point p0 on all Ct. Then ∑i pi(t) - dp0 is a divisor of degree 0 and defines a point 𝜉D(t) ∈ Jac(Ct).

slide-21
SLIDE 21

Normal functions arise naturally: Let D be an algebraic curve on X. It intersects Ct in points p1(t),…, pd(t). Lefschetz’ s proof continued: Hence D defines a normal function 𝜉D: t ↦ 𝜉D(t) ∈ J. Choose a point p0 on all Ct. Then ∑i pi(t) - dp0 is a divisor of degree 0 and defines a point 𝜉D(t) ∈ Jac(Ct).

slide-22
SLIDE 22

Poincaré’ s Existence Theorem:

slide-23
SLIDE 23

Every normal function 𝜉 arises as the normal function 𝜉D associated to an algebraic curve D. Poincaré’ s Existence Theorem:

slide-24
SLIDE 24

Every normal function 𝜉 arises as the normal function 𝜉D associated to an algebraic curve D. Poincaré’ s Existence Theorem: Then Lefschetz proved:

slide-25
SLIDE 25

Every normal function 𝜉 arises as the normal function 𝜉D associated to an algebraic curve D. Poincaré’ s Existence Theorem:

  • Every normal function 𝜉 defines a class

𝜃(𝜉)∈H2(X;Z) of Hodge type (1,1) such that 𝜃(𝜉D) = clH(D) (=cycle class of the curve D). Then Lefschetz proved:

slide-26
SLIDE 26

Every normal function 𝜉 arises as the normal function 𝜉D associated to an algebraic curve D. Poincaré’ s Existence Theorem:

  • Every normal function 𝜉 defines a class

𝜃(𝜉)∈H2(X;Z) of Hodge type (1,1) such that 𝜃(𝜉D) = clH(D) (=cycle class of the curve D).

  • Every class in H2(X;Z) of Hodge type (1,1) arises

as 𝜃(𝜉) for some normal function 𝜉. Then Lefschetz proved:

slide-27
SLIDE 27

Deligne’ s diagram: Let X be a smooth projective complex variety.

slide-28
SLIDE 28

Deligne’ s diagram: CHp(X) Let X be a smooth projective complex variety.

slide-29
SLIDE 29

Deligne’ s diagram: CHp(X) Z⊂X Let X be a smooth projective complex variety.

slide-30
SLIDE 30

Deligne’ s diagram: CHp(X) Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety.

slide-31
SLIDE 31

Deligne’ s diagram: CHp(X) Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety. clHD HD (X;Z(p)) →

2p

Deligne cohomology combines topological with Hodge theoretic information

slide-32
SLIDE 32

Deligne’ s diagram: CHp(X) Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety.

→ 0

clHD HD (X;Z(p)) →

2p

Deligne cohomology combines topological with Hodge theoretic information

slide-33
SLIDE 33

Deligne’ s diagram: CHp(X) Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety. J2p-1(X) → 0 →

→ 0

clHD HD (X;Z(p)) →

2p

Deligne cohomology combines topological with Hodge theoretic information

slide-34
SLIDE 34

Deligne’ s diagram: CHp(X) Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety. J2p-1(X) → 0 →

→ 0

clHD HD (X;Z(p)) →

2p

Deligne cohomology combines topological with Hodge theoretic information Griffiths’ intermediate Jacobian (a complex torus)

slide-35
SLIDE 35

Deligne’ s diagram: CHp(X) CHp(X)h=Kernel of clH ⊂ Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety. J2p-1(X) → 0 →

→ 0

clHD HD (X;Z(p)) →

2p

Deligne cohomology combines topological with Hodge theoretic information Griffiths’ intermediate Jacobian (a complex torus)

slide-36
SLIDE 36

Deligne’ s diagram: CHp(X) CHp(X)h=Kernel of clH ⊂ Abel-Jacobi map µ Z⊂X Hdg2p(X) clH [Zsm]

Let X be a smooth projective complex variety. J2p-1(X) → 0 →

→ 0

clHD HD (X;Z(p)) →

2p

Deligne cohomology combines topological with Hodge theoretic information Griffiths’ intermediate Jacobian (a complex torus)

slide-37
SLIDE 37

Another map for smooth complex varieties:

slide-38
SLIDE 38

Another map for smooth complex varieties: Ω*(X)

slide-39
SLIDE 39

Another map for smooth complex varieties: Ω*(X) algebraic cobordism

  • f Levine and Morel
slide-40
SLIDE 40

Another map for smooth complex varieties: Ω*(X) algebraic cobordism

  • f Levine and Morel
  • gen. by proj. maps f:Y→X, Y smooth, modulo Levine’

s and Pandharipande’ s “double point relation”:

slide-41
SLIDE 41

Another map for smooth complex varieties: Ω*(X) algebraic cobordism

  • f Levine and Morel
  • gen. by proj. maps f:Y→X, Y smooth, modulo Levine’

s and Pandharipande’ s “double point relation”:

π-1(0) ∼ π-1(∞) for projective morphisms π: Y’→XxP1 such that π-1(0) is smooth and π-1(∞)=A∪DB where A and B are smooth and meet transversally in D.

slide-42
SLIDE 42

Another map for smooth complex varieties: Ω*(X) algebraic cobordism

  • f Levine and Morel
  • gen. by proj. maps f:Y→X, Y smooth, modulo Levine’

s and Pandharipande’ s “double point relation”:

π-1(0) ∼ π-1(∞) for projective morphisms π: Y’→XxP1 such that π-1(0) is smooth and π-1(∞)=A∪DB where A and B are smooth and meet transversally in D.

2

→ MU *(X)

complex cobordism of the top. space X(C)

slide-43
SLIDE 43

Another map for smooth complex varieties: Ω*(X) algebraic cobordism

  • f Levine and Morel
  • gen. by proj. maps f:Y→X, Y smooth, modulo Levine’

s and Pandharipande’ s “double point relation”:

π-1(0) ∼ π-1(∞) for projective morphisms π: Y’→XxP1 such that π-1(0) is smooth and π-1(∞)=A∪DB where A and B are smooth and meet transversally in D.

[Y→X]

2

→ MU *(X)

complex cobordism of the top. space X(C)

slide-44
SLIDE 44

Another map for smooth complex varieties: Ω*(X) algebraic cobordism

  • f Levine and Morel
  • gen. by proj. maps f:Y→X, Y smooth, modulo Levine’

s and Pandharipande’ s “double point relation”:

π-1(0) ∼ π-1(∞) for projective morphisms π: Y’→XxP1 such that π-1(0) is smooth and π-1(∞)=A∪DB where A and B are smooth and meet transversally in D.

[Y→X] [Y(C)→X(C)] ⟼

2

→ MU *(X)

complex cobordism of the top. space X(C)

slide-45
SLIDE 45

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

slide-46
SLIDE 46

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

H2*(X;Z)

slide-47
SLIDE 47

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

CH*(X) H2*(X;Z)

slide-48
SLIDE 48

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Hdg2*(X) ⊆

clH

CH*(X) H2*(X;Z)

slide-49
SLIDE 49

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z Hdg2*(X) ⊆

clH

CH*(X) H2*(X;Z)

slide-50
SLIDE 50

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z Hdg2*(X) ⊆

clH

CH*(X) H2*(X;Z)

slide-51
SLIDE 51

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z Hdg2*(X) ⊆

clH

CH*(X) H2*(X;Z)

slide-52
SLIDE 52

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z Hdg2*(X) ⊆

clH

Totaro

CH*(X) H2*(X;Z)

slide-53
SLIDE 53

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Levine-Morel ≈

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z Hdg2*(X) ⊆

clH

Totaro

CH*(X) H2*(X;Z)

slide-54
SLIDE 54

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Levine-Morel ≈

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z

≉ in general

Hdg2*(X) ⊆

clH

Totaro

CH*(X) H2*(X;Z)

slide-55
SLIDE 55

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Levine-Morel ≈

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z

≉ in general

Atiyah-Hirzebruch: clH is not surjective.

Hdg2*(X) ⊆

clH

Totaro

CH*(X) H2*(X;Z)

slide-56
SLIDE 56

Ω*(X)

MU2*(X)

Φ Atiyah-Hirzebruch and Totaro:

Levine-Morel ≈

Ω*(X)⊗L*Z MU2*(X)⊗MU*Z

≉ in general

Atiyah-Hirzebruch: clH is not surjective.

Hdg2*(X) ⊆

clH This argument does not work for Φ.

Totaro

CH*(X) H2*(X;Z)

slide-57
SLIDE 57

Kollar’ s examples:

slide-58
SLIDE 58

Kollar’ s examples: Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5.

slide-59
SLIDE 59

Kollar’ s examples: Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5. H2(X;Z)=Zh,

slide-60
SLIDE 60

Kollar’ s examples: Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5. H2(X;Z)=Zh,

X

H4(X;Z)=Zα, ∫ α∙h=1

slide-61
SLIDE 61

Kollar’ s examples: Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5. H2(X;Z)=Zh,

X

H4(X;Z)=Zα, ∫ α∙h=1

and all classes are Hodge classes.

slide-62
SLIDE 62

Kollar’ s examples: Kollar: Then any algebraic curve C on X has degree divisible by p. Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5. H2(X;Z)=Zh,

X

H4(X;Z)=Zα, ∫ α∙h=1

and all classes are Hodge classes.

slide-63
SLIDE 63

Kollar’ s examples: Kollar: Then any algebraic curve C on X has degree divisible by p. Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5. H2(X;Z)=Zh, Let C be a curve on X and [C]∈H4(X;Z) be its cohomology class.

X

H4(X;Z)=Zα, ∫ α∙h=1

and all classes are Hodge classes.

slide-64
SLIDE 64

Kollar’ s examples: Kollar: Then any algebraic curve C on X has degree divisible by p. Let X⊂P4 a very general hypersurface of degree d=p3 for a prime p≥5. H2(X;Z)=Zh, Let C be a curve on X and [C]∈H4(X;Z) be its cohomology class. Then [C]= nα for some n and ∫ [C]∙h=n.

X X

H4(X;Z)=Zα, ∫ α∙h=1

and all classes are Hodge classes.

slide-65
SLIDE 65

Kollar’ s examples: Kollar: p divides the degree of any curve on X. H2(X;Z)=Zh, H4(X;Z)=Zα, ∫ α∙h=1

X

n = ∫ [C]∙h

X

slide-66
SLIDE 66

Kollar’ s examples: Kollar: p divides the degree of any curve on X. H2(X;Z)=Zh, H4(X;Z)=Zα, ∫ α∙h=1

X

n = ∫ [C]∙h

X

= number of intersection points of C with h

slide-67
SLIDE 67

Kollar’ s examples: Kollar: p divides the degree of any curve on X. H2(X;Z)=Zh, H4(X;Z)=Zα, ∫ α∙h=1

X

n = ∫ [C]∙h

X

= number of intersection points of C with h = degree of C

slide-68
SLIDE 68

Kollar’ s examples: Kollar: p divides the degree of any curve on X. H2(X;Z)=Zh, H4(X;Z)=Zα, ∫ α∙h=1

X

n = ∫ [C]∙h

X

= number of intersection points of C with h = degree of C ⇒ p divides n

slide-69
SLIDE 69

Kollar’ s examples: Kollar: p divides the degree of any curve on X. H2(X;Z)=Zh, H4(X;Z)=Zα, ∫ α∙h=1

X

n = ∫ [C]∙h

X

= number of intersection points of C with h = degree of C ⇒ p divides n In particular, α is not algebraic (for n cannot be 1).

slide-70
SLIDE 70

Kollar’ s examples: Kollar: p divides the degree of any curve on X. H2(X;Z)=Zh, H4(X;Z)=Zα, ∫ α∙h=1

X

n = ∫ [C]∙h

X

= number of intersection points of C with h = degree of C ⇒ p divides n In particular, α is not algebraic (for n cannot be 1). But dα is algebraic (for ∫ dα∙h = d = ∫ h2∙h ⇒ dα=h2).

X X

slide-71
SLIDE 71

Consequence for Φ: Ω*(X) → MU2*(X):

slide-72
SLIDE 72

Consequence for Φ: Ω*(X) → MU2*(X): Let X⊂P4 be a very general hypersurface as above.

slide-73
SLIDE 73

Consequence for Φ: Ω*(X) → MU2*(X): Let X⊂P4 be a very general hypersurface as above. Then MU4(X) ↠ H4(X;Z) is surjective, and thus Kollar’ s argument implies that Φ is not surjective (on Hodge classes).

slide-74
SLIDE 74

Consequence for Φ: Ω*(X) → MU2*(X): Let X⊂P4 be a very general hypersurface as above. Then MU4(X) ↠ H4(X;Z) is surjective, and thus Kollar’ s argument implies that Φ is not surjective (on Hodge classes). These examples are “not topological”: there is a dense subset of hypersurfaces Y⊂P4 such that the generator in H4(Y;Z) is algebraic.

slide-75
SLIDE 75

Generalized Hodge filtered cohomology theories (joint work with Michael J. Hopkins): 0 → J2p-1(X) → HD2p(X;Z(p)) → Hdg2p(X) → 0

CHp(X) clH clHD Kernel of clH ⊂

Recall the diagram for Chow groups

slide-76
SLIDE 76

Generalized Hodge filtered cohomology theories (joint work with Michael J. Hopkins): Our goal: define new invariants for algebraic cobordism which combine 0 → J2p-1(X) → HD2p(X;Z(p)) → Hdg2p(X) → 0

CHp(X) clH clHD Kernel of clH ⊂

Recall the diagram for Chow groups

slide-77
SLIDE 77

Generalized Hodge filtered cohomology theories (joint work with Michael J. Hopkins): Our goal: define new invariants for algebraic cobordism which combine

  • Hodge theoretical information and

0 → J2p-1(X) → HD2p(X;Z(p)) → Hdg2p(X) → 0

CHp(X) clH clHD Kernel of clH ⊂

Recall the diagram for Chow groups

slide-78
SLIDE 78

Generalized Hodge filtered cohomology theories (joint work with Michael J. Hopkins): Our goal: define new invariants for algebraic cobordism which combine

  • Hodge theoretical information and

0 → J2p-1(X) → HD2p(X;Z(p)) → Hdg2p(X) → 0

CHp(X) clH clHD Kernel of clH ⊂

Recall the diagram for Chow groups

  • topological information of complex cobordism.
slide-79
SLIDE 79

Deligne cohomology:

slide-80
SLIDE 80

Deligne cohomology: Given an integer p≥0.

slide-81
SLIDE 81

Deligne cohomology: The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0.

slide-82
SLIDE 82

Deligne cohomology: The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0. a homotopy cartesian square of sheaves of complexes.

slide-83
SLIDE 83

Deligne cohomology: The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0. a homotopy cartesian square of sheaves of complexes. A *

sheaf of hol. forms on X

slide-84
SLIDE 84

Deligne cohomology: The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0. a homotopy cartesian square of sheaves of complexes. FpA * A *

sheaf of hol. forms on X

slide-85
SLIDE 85

Deligne cohomology: Z The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0. a homotopy cartesian square of sheaves of complexes. FpA * A *

sheaf of hol. forms on X

slide-86
SLIDE 86

Deligne cohomology: Z The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0. a homotopy cartesian square of sheaves of complexes. FpA * A *

sheaf of hol. forms on X

ZD(p)

htpy cart.

slide-87
SLIDE 87

Deligne cohomology: Z The Deligne complex of sheaves ZD(p) on the complex manifold X is defined by Given an integer p≥0. a homotopy cartesian square of sheaves of complexes. FpA * A *

sheaf of hol. forms on X

ZD(p)

htpy cart.

Deligne cohomology is the hypercohomology of this complex: HD(X;Z(p)) = Hn(X;ZD(p)).

n

slide-88
SLIDE 88

Z A * FpA * ZD(p) sheaves of A homotopy cartesian square of complexes

slide-89
SLIDE 89

Z A * FpA * ZD(p) sheaves of pre A homotopy cartesian square of complexes

slide-90
SLIDE 90

Z A * FpA * ZD(p) sheaves of pre A homotopy cartesian square of

slide-91
SLIDE 91

Z A * FpA * ZD(p) sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of

slide-92
SLIDE 92

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of

slide-93
SLIDE 93

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H=Eilenberg-MacLane spectrum functor for complexes

slide-94
SLIDE 94

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H=Eilenberg-MacLane spectrum functor for complexes

slide-95
SLIDE 95

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes

slide-96
SLIDE 96

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H H=Eilenberg-MacLane spectrum functor for complexes

slide-97
SLIDE 97

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H HZD(p) H=Eilenberg-MacLane spectrum functor for complexes

slide-98
SLIDE 98

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H HZD(p) H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra.

slide-99
SLIDE 99

Z A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra.

slide-100
SLIDE 100

A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra.

slide-101
SLIDE 101

A * FpA * sheaves of pre spectra on the site of complex manifolds A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra.

slide-102
SLIDE 102

A * FpA * sheaves of pre spectra on the site of complex manifolds MU A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra.

slide-103
SLIDE 103

A * FpA * sheaves of pre spectra on the site of complex manifolds MU A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra. V*:=MU*⊗C

slide-104
SLIDE 104

A * FpA * sheaves of pre spectra on the site of complex manifolds MU (V*) A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra. V*:=MU*⊗C

slide-105
SLIDE 105

A * FpA * sheaves of pre spectra on the site of complex manifolds MU (V*) (V*) A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra. V*:=MU*⊗C

slide-106
SLIDE 106

A * FpA * sheaves of pre spectra on the site of complex manifolds MU (V*) (V*) A homotopy cartesian square of H H H=Eilenberg-MacLane spectrum functor for complexes HZD(p) represents Deligne cohomology in the homotopy category of presheaves of spectra. V*:=MU*⊗C MUD(p)

htpy cart.

slide-107
SLIDE 107

Hodge filtered complex bordism:

MU HA *(V*) HFpA *(V*) MUD(p)

slide-108
SLIDE 108

Hodge filtered complex bordism:

MU HA *(V*) HFpA *(V*) MUD(p)

X a complex manifold, and n, p integers

slide-109
SLIDE 109

Hodge filtered complex bordism:

MU HA *(V*) HFpA *(V*) MUD(p)

X a complex manifold, and n, p integers MUD(p)(X):=HomHoPre(∑∞(X+),∑nMUD(p)) We define:

n

slide-110
SLIDE 110

Hodge filtered complex bordism:

MU HA *(V*) HFpA *(V*) MUD(p)

X a complex manifold, and n, p integers “HFC bordism” groups sit in long exact sequences. MUD(p)(X):=HomHoPre(∑∞(X+),∑nMUD(p)) We define:

n

slide-111
SLIDE 111

Let’ s get concrete:

slide-112
SLIDE 112

Let’ s get concrete: Given n, p and a smooth projective variety X.

slide-113
SLIDE 113

Let’ s get concrete: Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

slide-114
SLIDE 114

Let’ s get concrete: ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

slide-115
SLIDE 115

Let’ s get concrete: ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl

slide-116
SLIDE 116

Let’ s get concrete: ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl closed forms of total degree n

slide-117
SLIDE 117

Let’ s get concrete: C*(X;V*)n-1 ∋ h ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl closed forms of total degree n

slide-118
SLIDE 118

Let’ s get concrete: C*(X;V*)n-1 ∋ h ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl

Z*(X;V*)n

cocycles of total degree n closed forms of total degree n

slide-119
SLIDE 119

Let’ s get concrete: C*(X;V*)n-1 ∋ h ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. Elements in MUD(p)(X) consist of triples (f, h, ω):

n

f

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl

Z*(X;V*)n

cocycles of total degree n closed forms of total degree n

slide-120
SLIDE 120

Let’ s get concrete: C*(X;V*)n-1 ∋ h ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. ω Elements in MUD(p)(X) consist of triples (f, h, ω):

n

f

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl

Z*(X;V*)n

cocycles of total degree n closed forms of total degree n

slide-121
SLIDE 121

Let’ s get concrete: C*(X;V*)n-1 ∋ h ∋ f : X → MUn Map(X, MUn) Given n, p and a smooth projective variety X. ω Elements in MUD(p)(X) consist of triples (f, h, ω):

n

= ∂h

  • f

V*=MU*⊗C

FpA *(X;V*)n ω ∈

cl

Z*(X;V*)n

cocycles of total degree n closed forms of total degree n

slide-122
SLIDE 122

For smooth (not projective) complex varieties, we have to take colimits over compactifications.

slide-123
SLIDE 123

For smooth (not projective) complex varieties, we have to take colimits over compactifications.

  • Motivic ring spectrum MUD := ∨pMUD(p)
slide-124
SLIDE 124

For smooth (not projective) complex varieties, we have to take colimits over compactifications.

  • Motivic ring spectrum MUD := ∨pMUD(p)
  • Projective bundle formula
slide-125
SLIDE 125

For smooth (not projective) complex varieties, we have to take colimits over compactifications.

  • Motivic ring spectrum MUD := ∨pMUD(p)
  • Projective bundle formula
  • Transfers: a projective morphism induces a push-

forward map.

slide-126
SLIDE 126

For smooth (not projective) complex varieties, we have to take colimits over compactifications.

  • Motivic ring spectrum MUD := ∨pMUD(p)
  • Projective bundle formula
  • Transfers: a projective morphism induces a push-

forward map. ΦD : Ω*(X) → MUD*(∗)(X) =⊕pMUD (p)(X)

2p 2

  • This induces a natural ring homomorphism
slide-127
SLIDE 127

A new diagram: Let X be a smooth projective complex variety.

slide-128
SLIDE 128

A new diagram: Ωp(X) Let X be a smooth projective complex variety.

slide-129
SLIDE 129

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety.

slide-130
SLIDE 130

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety. Φ [Y(C)→X(C)]

HdgMU(X)

2p

slide-131
SLIDE 131

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety. ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

slide-132
SLIDE 132

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety. ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

slide-133
SLIDE 133

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety. ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

→ 0 →

slide-134
SLIDE 134

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety. 0 →JMU (X) →

2p-1

ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

→ 0 →

slide-135
SLIDE 135

A new diagram: Ωp(X) [Y→X] Let X be a smooth projective complex variety. 0 →JMU (X) →

2p-1

ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

“new Jacobian”: a complex torus ≈ MU2p-1(X)⊗R/Z

→ 0 →

slide-136
SLIDE 136

A new diagram: Ωp(X) Ωp(X)top:=Kernel of Φ ⊂ [Y→X] Let X be a smooth projective complex variety. 0 →JMU (X) →

2p-1

ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

“new Jacobian”: a complex torus ≈ MU2p-1(X)⊗R/Z

→ 0 →

slide-137
SLIDE 137

A new diagram: Ωp(X) Ωp(X)top:=Kernel of Φ ⊂ “Abel-Jacobi map” µMU [Y→X] Let X be a smooth projective complex variety. 0 →JMU (X) →

2p-1

ΦD

MUD (p)(X)

2p

Φ [Y(C)→X(C)]

HdgMU(X)

2p

“new Jacobian”: a complex torus ≈ MU2p-1(X)⊗R/Z

→ 0 →

slide-138
SLIDE 138

The Abel-Jacobi map:

slide-139
SLIDE 139

The Abel-Jacobi map: Given [Y→X]∈Ωp(X) (with X smooth projective).

slide-140
SLIDE 140

The Abel-Jacobi map: Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective).

slide-141
SLIDE 141

The Abel-Jacobi map: Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective). and let (f, h, ω) be the image in MUD (p)(X).

2p

slide-142
SLIDE 142

The Abel-Jacobi map: Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective).

  • H : XxI → MU2p

and let (f, h, ω) be the image in MUD (p)(X).

2p

slide-143
SLIDE 143

The Abel-Jacobi map: Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective).

  • H : XxI → MU2p
  • 𝜃 ∈ FpA

*(X;V*)2p-1

and let (f, h, ω) be the image in MUD (p)(X).

2p

slide-144
SLIDE 144

The Abel-Jacobi map: Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective).

  • H : XxI → MU2p
  • 𝜃 ∈ FpA

*(X;V*)2p-1

and let (f, h, ω) be the image in MUD (p)(X).

2p

Then (0,H-𝜃,0) = (f,h,ω) in MUD (p)(X),

2p

slide-145
SLIDE 145

The Abel-Jacobi map: and H-𝜃 ∈ C*(X;V*)2p-1 defines an element in MU2p-1(X)⊗R, unique modulo MU2p-1(X). Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective).

  • H : XxI → MU2p
  • 𝜃 ∈ FpA

*(X;V*)2p-1

and let (f, h, ω) be the image in MUD (p)(X).

2p

Then (0,H-𝜃,0) = (f,h,ω) in MUD (p)(X),

2p

slide-146
SLIDE 146

The Abel-Jacobi map: and H-𝜃 ∈ C*(X;V*)2p-1 defines an element in MU2p-1(X)⊗R, unique modulo MU2p-1(X). Abel-Jacobi map: Ωp(X)top→ MU2p-1(X)⊗R/Z Assume [Y(C)→X(C)]=0 in MU2p(X), Given [Y→X]∈Ωp(X) (with X smooth projective).

  • H : XxI → MU2p
  • 𝜃 ∈ FpA

*(X;V*)2p-1

and let (f, h, ω) be the image in MUD (p)(X).

2p

Then (0,H-𝜃,0) = (f,h,ω) in MUD (p)(X),

2p

slide-147
SLIDE 147

Examples: The new Abel-Jacobi map is able to detect interesting algebraic cobordism classes: Ωp(X) MU2p(X) CHp(X) Φ µMU JMU (X)

2p-1

slide-148
SLIDE 148

Examples: The new Abel-Jacobi map is able to detect interesting algebraic cobordism classes: Ωp(X) MU2p(X) CHp(X) ∃ α ∊ Φ µMU JMU (X)

2p-1

slide-149
SLIDE 149

Examples: The new Abel-Jacobi map is able to detect interesting algebraic cobordism classes: Ωp(X) MU2p(X) CHp(X) ∃ α ∊ Φ µMU JMU (X)

2p-1

slide-150
SLIDE 150

Examples: The new Abel-Jacobi map is able to detect interesting algebraic cobordism classes: Ωp(X) MU2p(X) CHp(X) ∃ α ∊ Φ µMU JMU (X)

2p-1

slide-151
SLIDE 151

Examples: The new Abel-Jacobi map is able to detect interesting algebraic cobordism classes: Ωp(X) MU2p(X) CHp(X) ∃ α ∊ ≠0 Φ µMU JMU (X)

2p-1

slide-152
SLIDE 152

New “regulator maps”:

slide-153
SLIDE 153

New “regulator maps”: Let E be an oriented motivic (ring) spectrum and E(C) be its associated topological spectrum.

slide-154
SLIDE 154

New “regulator maps”: Let E be an oriented motivic (ring) spectrum and E(C) be its associated topological spectrum. E → E(C)D := ∨pE(C)D(p)

slide-155
SLIDE 155

New “regulator maps”: Let E be an oriented motivic (ring) spectrum and E(C) be its associated topological spectrum. E → E(C)D := ∨pE(C)D(p) We can consider such a map as an (integral) “regulator map”.

slide-156
SLIDE 156

New “regulator maps”: Let E be an oriented motivic (ring) spectrum and E(C) be its associated topological spectrum. E → E(C)D := ∨pE(C)D(p) We can consider such a map as an (integral) “regulator map”. For example, if E represents algebraic K-theory: Kn(X) → ⊕pKD (p)(X)

2p-n

slide-157
SLIDE 157

Arakelov algebraic cobordism:

slide-158
SLIDE 158

Arakelov algebraic cobordism: Let S be a scheme of finite type over Z, and let 𝜃 be the generic point.

slide-159
SLIDE 159

Arakelov algebraic cobordism: Let MGL denote Voevodsky’ s Thom spectrum representing algebraic cobordism. Let S be a scheme of finite type over Z, and let 𝜃 be the generic point.

slide-160
SLIDE 160

Arakelov algebraic cobordism: Let MGL denote Voevodsky’ s Thom spectrum representing algebraic cobordism. MGLS → 𝜃 (MUD) * Let S be a scheme of finite type over Z, and let 𝜃 be the generic point.

slide-161
SLIDE 161

Arakelov algebraic cobordism: Let MGL denote Voevodsky’ s Thom spectrum representing algebraic cobordism. MGLArakelov → homotopy fibre represents “Arakelov algebraic cobordism” MGLS → 𝜃 (MUD) * Let S be a scheme of finite type over Z, and let 𝜃 be the generic point.

slide-162
SLIDE 162

Thank you!