FTEC-2016 PROGRAM Project: HBWD Slotted Line Kicker MEMBERS: Supervisor: Eric Montesinos Responsible: Sebastien Calvo Trainee: Irene Alonso Romero (BE-RF-PM section) Contents HBWD SLOTTED LINE KICKER Introduction


slide-1
SLIDE 1

FTEC-2016 PROGRAM

MEMBERS:

Supervisor:

Eric Montesinos

Responsible:

Sebastien Calvo

Trainee:

Irene Alonso Romero

(BE-RF-PM section)

Project:

HBWD – Slotted Line Kicker

slide-2
SLIDE 2

Contents

HBWD – SLOTTED LINE KICKER

  • Introduction
  • Installation Simulation
  • Auxiliary parts design
  • Current point of the project

APS COUPLER

  • Previous prototype
  • Proposals

PLANNING

2

slide-3
SLIDE 3

Slotted Line Kicker

3 Slotted Line Kicker

slide-4
SLIDE 4

Introduction

4 Slotted Line Kicker

For what?

Part of the LHC Injector Upgrade (LIU) project HBWD Is needed as a damper to control unstable modes within a bunch

Where?

In the Long Straight Section 3 (LSS3) in the third sextant of the SPS

  • n the half period 32110-32210

HBWD – SLOTTED LINE KICKER

  • Introduction
  • Installation Simulation
  • Auxiliary parts design
  • Current point of the project

APS COUPLER PLANNING

slide-5
SLIDE 5

Installation Simulation

5 Slotted Line Kicker

Bellow Supporting system Alignment system Slotted Line kicker Connector

HBWD – SLOTTED LINE KICKER

  • Introduction
  • Installation Simulation
  • Auxiliary parts design
  • Current point of the project

APS COUPLER PLANNING

slide-6
SLIDE 6

Auxiliary parts design

6 Slotted Line Kicker

Bellow connection with kicker and slotted Fitting connector with slotted and pipe Fit Fittin ing con

  • nnector

Ov Oval l be bell llow

HBWD – SLOTTED LINE KICKER

  • Introduction
  • Installation Simulation
  • Auxiliary parts design
  • Current point of the project

APS COUPLER PLANNING

slide-7
SLIDE 7

Current point of the project

7 Slotted Line Kicker

Currently

  • Wait to receive parts of the assembly
  • Make drawings of the auxiliary parts
  • Support analysis

17,7 MPa

HBWD – SLOTTED LINE KICKER

  • Introduction
  • Installation Simulation
  • Auxiliary parts design
  • Current point of the project

APS COUPLER PLANNING

slide-8
SLIDE 8

APS COUPLER

8 APS Coupler

slide-9
SLIDE 9

Previous prototype

9

  • What is a coupler?
  • How does it work?
  • Aspects to consider

APS Coupler

TESTED PROTOTYPE

  • What did the laboratory request?
  • Why is a redesign requested?

HBWD – SLOTTED LINE KICKER APS COUPLER

  • Previous prototype
  • Proposals

PLANNING

slide-10
SLIDE 10

Proposals

1st PROPOSAL 2nd PROPOSAL

APS Coupler 10

HBWD – SLOTTED LINE KICKER APS COUPLER

  • Previous prototype
  • Proposals

PLANNING

slide-11
SLIDE 11

20170613 - PLANNING

Jun. 2017 Jul. 2017 Aug. 2017 Sep. 2017 Oct. 2017 Nov. 2017 Dec. 2017 Jan. 2018 Feb. 2018

Design, Analysis and Drawings of auxiliary parts

Mar. 2018 Apr. 2018

11 Planning

HBWD – SLOTTED LINE KICKER APS COUPLER PLANNING

May. 2018 Tests 1+1 Fabrication

Installation

Reports Shipment Reception and Assembly of Parts Technical Stop Design, Analysis, Drawings, Manufacturing and Test

APS PS COU OUPLER HB HBWD – SL SLOTTED LI LINE KIC ICKE KER

Corrections

slide-12
SLIDE 12

Tha hanks for r yo your r at attention