FTEC-2016 PROGRAM
MEMBERS:
Supervisor:
Eric Montesinos
Responsible:
Sebastien Calvo
Trainee:
Irene Alonso Romero
(BE-RF-PM section)
FTEC-2016 PROGRAM Project: HBWD Slotted Line Kicker MEMBERS: - - PowerPoint PPT Presentation
FTEC-2016 PROGRAM Project: HBWD Slotted Line Kicker MEMBERS: Supervisor: Eric Montesinos Responsible: Sebastien Calvo Trainee: Irene Alonso Romero (BE-RF-PM section) Contents HBWD SLOTTED LINE KICKER Introduction
MEMBERS:
Supervisor:
Eric Montesinos
Responsible:
Sebastien Calvo
Trainee:
Irene Alonso Romero
(BE-RF-PM section)
HBWD – SLOTTED LINE KICKER
APS COUPLER
PLANNING
2
3 Slotted Line Kicker
4 Slotted Line Kicker
Part of the LHC Injector Upgrade (LIU) project HBWD Is needed as a damper to control unstable modes within a bunch
In the Long Straight Section 3 (LSS3) in the third sextant of the SPS
HBWD – SLOTTED LINE KICKER
APS COUPLER PLANNING
5 Slotted Line Kicker
Bellow Supporting system Alignment system Slotted Line kicker Connector
HBWD – SLOTTED LINE KICKER
APS COUPLER PLANNING
6 Slotted Line Kicker
Bellow connection with kicker and slotted Fitting connector with slotted and pipe Fit Fittin ing con
Ov Oval l be bell llow
HBWD – SLOTTED LINE KICKER
APS COUPLER PLANNING
7 Slotted Line Kicker
Currently
17,7 MPa
HBWD – SLOTTED LINE KICKER
APS COUPLER PLANNING
8 APS Coupler
9
APS Coupler
TESTED PROTOTYPE
HBWD – SLOTTED LINE KICKER APS COUPLER
PLANNING
1st PROPOSAL 2nd PROPOSAL
APS Coupler 10
HBWD – SLOTTED LINE KICKER APS COUPLER
PLANNING
Jun. 2017 Jul. 2017 Aug. 2017 Sep. 2017 Oct. 2017 Nov. 2017 Dec. 2017 Jan. 2018 Feb. 2018
Design, Analysis and Drawings of auxiliary parts
Mar. 2018 Apr. 2018
11 Planning
HBWD – SLOTTED LINE KICKER APS COUPLER PLANNING
May. 2018 Tests 1+1 Fabrication
Installation
Reports Shipment Reception and Assembly of Parts Technical Stop Design, Analysis, Drawings, Manufacturing and Test
APS PS COU OUPLER HB HBWD – SL SLOTTED LI LINE KIC ICKE KER
Corrections
Tha hanks for r yo your r at attention