For personal use only Wowo Gap Nickel Laterite Project Papua New Guinea Resource Mining Corporation Disclaimer This presentation has been prepared by Resource Mining Corporation Limited (RMC or the Company). It should not be For
This presentation has been prepared by Resource Mining Corporation Limited (“RMC” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation. This presentation contains forecasts and forward looking information. Such forecast, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. RMC have not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, RMC make no representation and can give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation. You should not act or refrain from acting in reliance on this presentation material. This overview of RMC does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investments decision.
Disclaimer
Competent Persons Statement: The information in this presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based
- n information compiled by Mark Hill, who is a Member of the Australian Institute of Geologists. Mark Hill is a
director of Exman Consultancy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mark Hill consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.
For personal use only
Wowo Gap – Nickel Laterite Project
ACCESS
- Helicopter direct to
site – 3 landing locations
- Fixed wing to
Embessa or Obea (1,000m grass airstrips) + 1 day walk to site
- Canoe from
Popondetta approx 1 day
For personal use only
Previous Wacker Drill Holes Previous Diamond Drill Holes LEGEND 2011 Core Holes 2010 Core Holes 712,000 mE 710,000 mE 711,000 mE 713,000 mE 707,000 mE 708,000 mE 709,000 mE 8,947,000 mN 8,948,000 mN 8,944,000 mN 8,945,000 mN 8,946,000 mN 8,943,000 mN 8,941,000 mN 8,942,000 mN 706,000 mE 8,940,000 mN
Exploration Summary
- 295 holes drilled
- 200 metre spacings
- 12 km strike length
- 70% of holes Ni
>1.0%
- 125 Mt @ 1.06% Ni
and 0.06% Co
- Total contained Ni
1.32Mt
Resource Drilling Program - last core drilling 2011
Wowo Gap – Nickel Laterite Project
For personal use only
Type Year Drill Company No Holes Core Size Metres Drilled diamond 1972 PNE 17 (PN & PND holes) NQTT 405.3 wacker 1999 ANL 23 (WGW001 - 23) BQTT 119.1 wacker 2004 NN 70 (WGW024 - 93) BQTT 341 wacker 2008 NN 55 (WGW101-155) BQTT 270.9 diamond 2003 UPD 8 (1 - 8) HQTT 160.7 diamond 2004 UPD 18 (9 - 26) HQTT 404.6 diamond 2007 Paradise 45 (27 - 72) NQTT 1085.4 diamond 2008 Paradise 11 (73 - 83) HQTT 235.7 diamond 2008 Paradise 17 (84 - 98) HQTT 277.5 core 2010 NN 159 (101 - 258) NQTT 1007.5 core 2011 NN 138 (259 - 395) NQTT 738.3
Mineral Resource Statement
- Current Resource - Indicated 72MT @ 1.03% Ni and 0.07% Co
plus Inferred 53MT @ 1.09% Ni and 0.06% Co
- Independent verification
- f:
- Drilling and sampling
procedures
- QA/QC on site
- Confirmed to Canadian
Ni 43-101 standard for technical reporting of mineral projects
- Ravensgate (Perth based
Independent Minerals Industry consultant) completed the Resource Update
Wowo Gap – Nickel Laterite Project
Project Drilling History
For personal use only
0.8% Ni cut off grade Indicated + Inferred: 125Mt @ 1.06%Ni 1.0% Ni cut off grade Indicated + Inferred: 63Mt @ 1.23%Ni 1.2% Ni cut off grade Indicated + Inferred: 25Mt @ 1.43%Ni
Wowo Gap Resource Estimate By Ni Grade
Wowo Gap – Nickel Laterite Project
For personal use only
Ore mineralogy – Saprolite and Limonite
- Serpentine (e.g. antigorite, lizardite,
clinochrysotile)
- Smectite (e.g. nontronite)
- Other silicates (e.g. talc, tremolite,
forsterite)
- Quartz, dolomite
- Garnierite
- Goethite
- Lithiophorite
- Quartz, talc
- Spinels (e.g. chromite, trevorite)
4- 864 FLUORITE, SYN 27- 1276 CLINOCHRYSOTILE 2- 100 ANTIGORITE 82- 1837 LIZARDITE 29- 1497 NONTRONITE-15A 21- 1260 FORSTERITE 13- 558 TALC-2M 85- 2157 TREMOLITE 85- 1053 QUARTZ - SYNTHETIC 5- 622 DOLOMITE
File Name: c:\...\qxrd\rmcsap~2.cpi
Sample ID
2-Theta Angle (deg) 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 6 12 18 24 30
Intensity (Counts) X 100
4- 864 FLUORITE, SYN 17- 536 GOETHITE 13- 558 TALC-2M 85- 1053 QUARTZ - SYNTHETIC 41- 1378 LITHIOPHORITE 23- 1119 TREVORITE, FERROAN 24- 512 CHROMITE, SYN
File Name: c:\...\qxrd\rmclim~2.cpi
Sample ID
2-Theta Angle (deg) 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 1 2 3 4 5
Intensity (Counts) X 100
Wowo Gap – Nickel Laterite Project
Saprolite Limonite
For personal use only
Testing: Amdel – Perth metallurgical laboratory HPAL chosen route Limonite X Saprolite Feasibility Study demonstrated questionable HPAL project economics based on:
- Nickel Price
- Project CAPEX
- Economics of processing limited amounts of 2/3rds of the then known ore body
(Saprolite) Outcome 1. Need a larger limonite resource to improve economics or, 2. Alternative new process technology Metallurgical Testwork
Wowo Gap – Nickel Laterite Project
For personal use only
Alternative Process Technology
Ni Co Ore Type Head Assay Initial Testwork Leach Extraction New Process Leach Extraction Head Assay Initial Testwork Leach Extraction New Process Leach Extraction % % % % % % Limonite 0.76 6 50 0.14 39 100 Limonite 1.08 7 55 0.13 54 100 Limonite 1.37 13 72 0.09 67 100 Limonite 1.51 14 75 0.08 58 100 Saprolite 1.21 16 93 0.05 60 89 Saprolite 0.95 18 78 0.03 78 94 Saprolite 0.93 20 84 0.02 71 88 Saprolite 0.84 21 90 0.04 55 79
Metal Extraction Results From Test Work
A. Investigated Alternative Inorganic Acids – patented process, expensive process entry costs B. Organic Acid Leach – Alternative process option?
Wowo Gap – Nickel Laterite Project
Nickel Cobalt
For personal use only
Future Development Options
- Mine – ship ore
- Mine + part process – ship product
- Mine + full process – ship nickel
Limited Infrastructure: No Electricity Network Electricity Challenges
- Remote
- No existing power infrastructure
- No gas
- No coal
- Wind questionable
Opportunity
- Hydro electricity
Wowo Gap – Nickel Laterite Project
For personal use only
Requirements:
- Regular water supply
- Sustained water flow
- Adequate “head”
RMC Team has identified two waterfalls with all 3 requirements adjacent to the Wowo Gap deposit Advantages:
- Run-of-river
- No dams required
Hydro Electricity Power Potential
Wowo Gap – Nickel Laterite Project
For personal use only
Located 2 options:
- 50 metre fall
- 250 metre fall
Basic measurement to determine:
1. Velocity of a body of water 2. Cross-sectional area of a ‘slice’ of stream (in velocity measurement section) 3. Flow of the stream using 1 and 2 4. Vertical height of a slope down which the water flows 5. Calculate the power generation potential
Wowo Gap – Nickel Laterite Project
Hydro Electricity Power Potential
For personal use only
Logistics - +280 casual employees involved in the process Taruma Water Supply – RMC provided 4.5km of pipe fittings, pressure relief systems and labour for water supply Obea and Embessa Schools – RMC provided equipment and specialist labour to assist in construction of Pre-Primary school Fresh Food Production – Joint village/RMC initiative at Embessa and Obea. Backloading on company aircraft to Port Moresby Health Initiative – RMC funded employees deliver medical service and practical assistance and advice to improve village health and hygiene Airstrip Maintenance – Equipment, fuel and labour provided to maintain airstrips Landowner meeting process – On-going process with focus on village dialogue
Social Engagement
Wowo Gap – Nickel Laterite Project
For personal use only
Health Worker and Health Support
Wowo Gap – Nickel Laterite Project
Social Responsibility Social Mapping – detailed social mapping of local tribes, clans and sub-clans well advanced Responsibility – Community/Employees
Environmental survey completed – dynamic issue, regular maintenance