Fitch For Residential & Commercial Heating Systems Patent - - PowerPoint PPT Presentation

fitch for residential commercial heating systems patent
SMART_READER_LITE
LIVE PREVIEW

Fitch For Residential & Commercial Heating Systems Patent - - PowerPoint PPT Presentation

Fitch For Residential & Commercial Heating Systems Patent Protected For more info: 888-881-2774 or 860-985-8585 What does Fitch do to Heating Oil? Reduces the concentration of Aromatics Increases the concentration of Aliphatics


slide-1
SLIDE 1

Patent Protected

For more info: 888-881-2774 or 860-985-8585

Fitch For Residential & Commercial Heating Systems

slide-2
SLIDE 2
  • Reduces the concentration of Aromatics
  • Increases the concentration of Aliphatics
  • Releases more inherent btus heat energy

What does Fitch do to Heating Oil?

slide-3
SLIDE 3

w/o Fitch With Fitch Visibly brighter flame

More efficient combustion

Visible reduction

  • f Soot

w/o Fitch w/Fitch

Fitch Treated Fuel Produces More Complete Combustion

slide-4
SLIDE 4

Fitch Increases Stack Temperature

allowing the reduction of nozzle size

slide-5
SLIDE 5
  • Use Less Fuel (reduce nozzle size)
  • Improve Combustion Efficiency
  • Reduce Soot & CO2 (GHG)
  • Reduce Overall Boiler Maintenance

Increased stack temperature allows the nozzle reduction

slide-6
SLIDE 6

Fitch Installation on Home Heating Unit

Must be installed by a licensed burner technician

slide-7
SLIDE 7

UL Approved Fitch Fuel Catalyst HO Series

slide-8
SLIDE 8

6.5 Ton Cleaver Brooks

Commercial Boiler Application

slide-9
SLIDE 9

New York City Housing Authority Boiler: Johnson PFTX-350-31LG15S Burner: Johnson FD69CA400LM Results: 5% Reduction in Fuel Consumption Reduction in Emissions – CO 98%, NOx 15% Increase efficiency: 1.2%

slide-10
SLIDE 10

Hse 334 (Furnace) - Average Efficiency

84.5 85.3 86.4 86.9 86.8 87 83 84 85 86 87 88

2/19/2006 2/19/2006 2/19/2006 2/19/2006 3/5/2006 6/6/2006 Initial efficiency test reduced nozzle by .15 (.65 to .5) Installed Fitch Adjusted Excess Air Efficiency after three weeks Efficiency after three months

E ffic ie n c y

2 4 6 8 10 12 14 16 18 20

C O (P P M )

slide-11
SLIDE 11

Sofitel Seminyak Bali

Accor Hotels & Resorts

Boiler: 2 x 1 ton Boiler Plant Test Period: 5 Month Test Results: 22% Fuel Consumption Reduction

slide-12
SLIDE 12

Grand Hyatt – Hyatt Resort Reported: 20.38% fuel consumption reduction “The Stack Temperatures have decreased, the Smoke Emissions have cleared and the internal sooting levels are only at a fraction of the levels previously experienced”

slide-13
SLIDE 13

Results: 27% Fuel Consumption Reduction

Hotels Using Fitch