FINAL DESIGN PRESENTATION 13 th St N Kirkwood Rd to N. Johnson St - - PowerPoint PPT Presentation

FINAL DESIGN PRESENTATION 13 th St N Kirkwood Rd to N. Johnson St (Lyon Village Neighborhood) Angela Marshall, Neighborhood Conservation Planner Community Planning, Housing, & Development Neighborhood Conservation Program Final Design


slide-1
SLIDE 1

FINAL DESIGN PRESENTATION

13th St N – Kirkwood Rd to N. Johnson St (Lyon Village Neighborhood)

Angela Marshall, Neighborhood Conservation Planner Community Planning, Housing, & Development Neighborhood Conservation Program

slide-2
SLIDE 2

Final Design N560 13th Street N (N Kirkwood Rd to N Johnson St)

slide-3
SLIDE 3

Agenda:

  • 1. Overview of the Project
  • 2. Street Improvement Design Plan
  • 3. Sign and Pavement Markings Plan
  • 4. Landscape Plan
slide-4
SLIDE 4

Presentation Purpose: Present final design to property owners in preparation for construction of the street improvement project on 13th St N, Kirkwood Rd to N. Johnson St. Project Goal: Pedestrian Safety project to include a 5-foot wide sidewalk, curb and gutter on the south-side, and curb and gutter only

  • n the north-side of 13th St N between Kirkwood Rd to N.

Johnson St and a retaining wall at one property. All improvements within existing right-of-way; ADA compliant accessible curb ramps at the intersection of 13th Street N and N Kirkwood Rd. Parking on either side of 13th St N will not be permitted.

slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9

Temporary Easements

  • Temporary easements and construction agreements allow the County

contractor to access private yards to perform construction-related work, including the relocation of fences, replacement of disturbed sod, and making grade adjustments.

  • The County agrees to restore the disturbed area on and adjacent to the

Temporary Easement Area as nearly as practicable to its original condition.

  • Temporary easements become null and void at the end of the project.
slide-10
SLIDE 10

Next steps

1. Questions and comments

  • Relative to the overall project design
  • Relative to individual lots
  • 2. Final design plan 90%→100%
  • 3. Temporary easements complete
  • 4. Utility relocation complete
  • 5. On-call contractor/Prepare for construction
slide-11
SLIDE 11