February29 th ,2012 LuisCosta,P.E. ProjectManager - - PowerPoint PPT Presentation
February29 th ,2012 LuisCosta,P.E. ProjectManager - - PowerPoint PPT Presentation
FromSW5thAvenuetoSW2ndAvenue FMNo.:42440712201 ETDMNo.:11240 February29 th ,2012 LuisCosta,P.E. ProjectManager FlaglerStreetBridge SW1 st StreetBridge SW5 th Av.
LuisCosta,P.E. ProjectManager
SW5th Av. SW2ndAv. FlaglerStreetBridge SW1st StreetBridge
Bridgeconditionisfairtopoor Extensivedeterioration
Constructedin1929 Designedfor50yearservicelife
Bridgeisfunctionallyobsolete
Narrowsidewalks Narrowdeckandshoulders(Intolerable)
Substandardclearances
Structuralconditionisfair
Deck=Satisfactory Superstructure=Fair Substructure=Fair MachineryandControls=Poor Bridgerailingsaresubstandard
DamagedPedestrianRail ActiveCorrosion Substructure SubstandardBridgeRail SuperstructureActiveCorrosion
12’ 12’ 14’ 16.5’ 16.5’ 21’ Substandardchannelclearances Horizontal: 75’existing/125’required Vertical: 14’existing/21’required Substandardbridgeunderclearance at NorthandSouthRiverDrives Vertical: 12’existing/16.5’min.required
ChannelAlignment NarrowChannelforMiami RiverTraffic TurnsinMiamiRiverand ChannelSkewedtoPiers
Substandardbridgeunderclearance at NorthandSouthRiverDrives Vertical: 12’existing/16.5’min.required LowUnderclearance atSouthRiverDrive ImpactDamagetoLowBeam
428SW1st Street 438SW1st Street SouthRiverDrive NRHPHistoricDistrict SouthRiverDrive LocalHistoricDistrict SW1st StreetBridge J.W.WarnerHouse 111SW5th Ave. Brickell Cottage/104 SWSouthRiverDrive
NW 3RD STREET W FLAGLER STREET SW 5TH STREET LUMMUS PARK RIVERSIDE PARK
MIAMI RIVER GREENWAY
SW 5TH AVENUE SW 2ND AVENUE
ENDPROJECT BEGINPROJECT
JOSE MARTI PARK
NoBuild Rehabilitation ReplacementAlternatives
- FixedHighLevel
- Tunnel
- MovableBridge
ReplaceFenderSystem ReplaceAccessStairs ReplaceBridgeDeck RepairandRefinishStructuralSteel
ReplaceBasculeLeaves ReplaceOperatingMachinery ReplaceControlSystems ReplaceControlHouse ShipImpactUpgrades
FixedHighLevelBridge Tunnel Bascule(MovableBridge)
SW 7th Avenue SW 6th Avenue SW 5th Avenue SW S. River Dr. SW N. River Dr. SW 2nd Avenue SW 1st Avenue Miami Avenue 12’ 43’ 75’ 49’ 10’ Existing Bridge Profile Fixed Bridge Profile
SW 7th Avenue SW 6th Avenue SW 5th Avenue SW S. River Dr. SW N. River Dr. SW 2nd Avenue SW 1st Avenue Miami Avenue Existing Bridge Profile Tunnel Profile 20’ 20’
71’ 12’ 12’ 12’ 5’
Sidewalk
5’
Sidewalk
10’
Shoulder
10’
Shoulder
56’ 5’
Sidewalk
5’
Sidewalk
2.5’
Shoulder
5.5’
Shoulder
11’ 11’ 11’
- Renderings are shown to depict the height and scale of a replacement
movable bridge and do not represent a proposed bridge design.
View from S. River Drive
View from Miami River Inn
- Renderings are shown to depict the height and scale of a replacement
movable bridge and do not represent a proposed bridge design.
Alternative Est.ConstructionCost (millions) Rehabilitation $23.1(25yearservicelife) BasculeBridge $50(75yearservicelife)
Activity Activity 2010 2010
PD&E Study PD&E Study Continuous Public Involvement Continuous Public Involvement
2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 2017 2017 2018 2018 2011 2011
Final Design Final Design Construction Construction