From�SW�5th�Avenue�to�SW�2nd�Avenue FM�No.:�424407�1�22�01 ETDM�No.:�11240 February�29 th ,�2012
Luis�Costa,�P.E. Project�Manager
Flagler�Street�Bridge SW�1 st Street�Bridge SW�5 th Av. SW�2nd�Av.
� Bridge�condition�is�fair�to�poor � Extensive�deterioration � Constructed�in�1929 � Designed�for�50�year�service�life � Bridge�is�functionally�obsolete � Narrow�sidewalks � Narrow�deck�and�shoulders�(Intolerable) � Substandard�clearances
� Structural�condition�is�fair � Deck�=�Satisfactory � Superstructure�=�Fair � Substructure�=�Fair � Machinery�and�Controls�=�Poor Superstructure�Active�Corrosion � Bridge�railings�are�substandard Active�Corrosion Damaged�Pedestrian�Rail Substandard�Bridge�Rail Substructure
21’ 16.5’ 16.5’ 14’ 12’ 12’ � Substandard�channel�clearances � Substandard�bridge�underclearance at� Horizontal: 75’�existing�/�125’�required North�and�South�River�Drives Vertical: 14’�existing�/�21’�required Vertical: 12’�existing�/�16.5’�min.�required
Narrow�Channel�for�Miami� River�Traffic � Channel�Alignment Turns�in�Miami�River�and� Channel�Skewed�to�Piers
Low�Underclearance at�South�River�Drive � Substandard�bridge�underclearance at� North�and�South�River�Drives Vertical: 12’�existing�/�16.5’�min.�required Impact�Damage�to�Low�Beam
Brickell Cottage/104� SW�South�River�Drive� 428�SW�1 st Street� SW�1 st Street�Bridge 438�SW�1 st Street� J.W.�Warner�House� 111�SW�5 th Ave. South�River�Drive� South�River�Drive� NRHP�Historic�District Local�Historic�District
NW 3 RD STREET LUMMUS PARK MIAMI RIVER GREENWAY W FLAGLER STREET END�PROJECT SW 5 TH AVENUE BEGIN�PROJECT SW 2 ND AVENUE JOSE MARTI PARK RIVERSIDE PARK SW 5 TH STREET
� No�Build� � Rehabilitation � Replacement�Alternatives � Fixed�High�Level � Tunnel Movable�Bridge �
� Replace�Fender�System � Replace�Access�Stairs � Replace�Bridge�Deck � Repair�and�Refinish�Structural�Steel
� Replace�Bascule�Leaves � Replace�Operating�Machinery � Replace�Control�Systems � Replace�Control�House � Ship�Impact�Upgrades
� Fixed�High�Level�Bridge � Tunnel � Bascule�(Movable�Bridge)
SW 7 th Avenue SW 6 th Avenue 12’ SW 5 th Avenue 43’ SW S. River Dr. 75’ SW N. River Dr. Existing Bridge Profile 49’ SW 2 nd Avenue Fixed Bridge Profile 10’ SW 1 st Avenue Miami Avenue
SW 7 th Avenue SW 6 th Avenue SW 5 th Avenue SW S. River Dr. 20’ 20’ SW N. River Dr. Existing Bridge Profile SW 2 nd Avenue Tunnel Profile SW 1 st Avenue Miami Avenue
71’ 10’ 5’ 10’ 12’ 12’ 12’ 5’ Shoulder Sidewalk Shoulder Sidewalk
56’ 2.5’ 5’ 11’ 11’ 11’ 5.5’ 5’ Sidewalk Shoulder Sidewalk Shoulder
View from S. River Drive � Renderings are shown to depict the height and scale of a replacement movable bridge and do not represent a proposed bridge design.
� Renderings are shown to depict the height and scale of a replacement View from Miami River Inn movable bridge and do not represent a proposed bridge design.
Alternative Est.�Construction�Cost� (millions) Rehabilitation $23.1�(25�year�service�life)� Bascule�Bridge $50�(75�year�service�life)
Activity Activity 2010 2010 2011 2011 2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 2017 2017 2018 2018 Continuous Public Continuous Public Involvement Involvement PD&E Study PD&E Study Final Design Final Design Construction Construction
For More Information Ms.�Bao�Ying�Wang,�P.E. Project�Manager Florida�Department�of�Transportation (305)�470�5211 Baoying.Wang@dot.state.fl.us Ms.�Jeannette�Lazo Public�Information�Officer (305)�262�4017 jeannette_lazo@urscorp.com Efficient�Transportation�Decision� Making�Website�ETDM�No.:�11240 https://etdmpub.fla�etat.org/est/