expert group meeting on the harmonization of the rules
play

Expert Group Meeting on the Harmonization of the Rules and - PowerPoint PPT Presentation

TU MINISTRY OF TRANSPORT MALAYSIA Expert Group Meeting on the Harmonization of the Rules and Regulations for Facilitation of International Railway Transport - Country Presentation: MALAYSIA - 4-5 SEPTEMBER 2017 Content: i. Cross Border


  1. TU MINISTRY OF TRANSPORT MALAYSIA Expert Group Meeting on the Harmonization of the Rules and Regulations for Facilitation of International Railway Transport - Country Presentation: MALAYSIA - 4-5 SEPTEMBER 2017

  2. Content: i. Cross Border Railway Facilities ii. Cross Border Railway Arrangement iii.Customs Clearance Procedure

  3. Cross Border Railway Facilities

  4. MAIN NETWORK PENINSULAR MALAYSIA • Track Gauge: 1,000 mm • Track Length: 1,566 km • No. of Stations: 104 • No. of Halts: 68 LEGEND Single Track Padang Besar Electrified Double Electrified Double Track (EDT) (765 km): Arau THAILAND Track Tumpat Alor Setar • Ipoh – Padang Besar (329 km) Pasir Mas Station Rantau Panjang • Rawang – Ipoh (180 km) Track Closed Sungai Petani Krai • Rawang – Seremban (105 km) Butterworth Bukit Mertajam • Batu Caves – Port Klang (53 km) Parit Buntar • Seremban – Gemas (98 km) Taiping Gua Musang Kuala Ipoh Kangsar Single Track (801 km): Kuala Lipis Tapah Road • Gemas – Johor Bahru (197 km) • Gemas – Tumpat (528 km) Jerantut Tanjong • Pasir Gudang Line (29 km) Malim Rawang Batu Caves • PTP Line (32 km) Sentul Sri Subang KL Sentral Yad Pelabuhan Klang Utara • West Port, Pulau Indah (15 km) Kajang Pelabuhan Klang Selatan Seremban Pulau Indah Senawang West Port Sg. Gadut Gemas Rembau Segamat Port Dickson Services Provided: Tampin • Intercity • Cargo Kluang • ETS • Commuter Kempas Baru Tg. Pelepas Pasir Gudang Woodlands Johor Bahru Sentral

  5. INTERNATIONAL ENTRY POINT : RANTAU PANJANG [NORTHEAST] • Constructed: 1933 • Distance: 18.7 km • Passenger services • Was 3 services daily • Discontinued in June 1982 • Due to security reason (smuggling activities) • Cargo services • Was carrying cement from Northwest of Malaysia • Discontinued in 2003 • Due to Southern Thailand unrest • Current state: track condition deteriorating due to damage from flooding in 2007

  6. INTERNATIONAL ENTRY POINT : JOHOR BAHRU [SOUTH] • MY-SG Rail link opened in 17 th Sept 1923 • Originally end at south of Singapore in Tanjung Pagar Railway Station (TPRS) • Cargo services to feed New Harbour (aka Keppel Harbour) • MY-SG Point of Agreement(POA) [May 2010] • ended train services to Singapore • KTMB terminus relocated from TPRS to Woodlands Train Check Point (WTCP) • Effective date from 1 st July 2011 • Cargo services to SG discontinued • Only passenger services remains • KTM will cease services to WTCP when Rapid Transit System between Johor Bahru & Woodlands become operational (est. December 2024)

  7. INTERNATIONAL ENTRY POINT : PADANG BESAR [NORTHWEST] • 14 tracks • Passenger: 2 tracks (electrified) • Container terminal: 5 tracks (non- electrified) • General: 7 tracks (non-electrified) • Container Terminal: • Current: 108,000 TEUs Per Annum • 1,241 TEUs Laden Container at any one time • 2 weight bridge • Container stacking: 3 layers • 4-5 daily trips to New Butterworth Container Terminal • Upgrade works: • Estimated completion: March 2018 • Cost: RM29 Millions/USD6.8 Millions

  8. PADANG BESAR CONTAINER TERMINAL UPGRADE Upgrade works: • Upgrade hardstand to accommodate 5-layer stacking • New elevated office & security post • Additional 2 weight bridge • Replace existing BS80 rail & turnout to UIC54 • Track flushing • Increase annual capacity to 132,000 TEUs

  9. 9 Tracks for Padang Besar Container Terminal

  10. Limited access road 10

  11. S RT passenger train & Malaysia – Thailand Landbridge S ervice

  12. Existing Weight Bridge (1-in, 1-out)

  13. Maintenance Depoh Towards Thailand

  14. Maintenance Depot (7 bays)

  15. LANDBRIDGE SERVICE BETWEEN MALAYSIA - THAILAND (CARGO SERVICES)  introduced in year 1999 Maptaput  represents an international collaboration Bangsue between KTMB and the State Railway of Trang Suratthani Thailand (SRT) Hatyai  started with 2 weekly trains from Port Klang to Bangsue  gradually expanded to major dry and sea Penang Port ports in Malaysia and terminates at various stations and freight terminal in Thai territory. Port Klang  Shorter travelling time by rail from Port Klang – Bangsue takes 60 hours while sea transport takes 5-7 days. 15

  16. SHUTTLE TRAIN SERVICE BETWEEN JB SENTRAL – WOODLANDS, SG  introduced on 1 st July 2015 with 14 trips daily  Current frequency 26 trips daily  Distance of 1.1 km  5-minutes journey compared to 30-60 minutes by road on Causeway  Train capacity: 320 pax  Average daily passengers: 5,900 pax  Fare:  Towards SG: MYR5.  Towards MY: SGD5  Current status: under negotiation for frequency increase to 36 trips daily 16

  17. Cross Border Railway Arrangement

  18. INTERNATIONAL ENTRY POINT : RANTAU PANJANG [NORTHEAST] • Effective from 1 st January, 1954 • Terms on: i. Joint Station (Padang Besar & Sungai Golok): • Land ownership & use; • Construction & maintenance; • Traffic management; • Joint staffing ii. Through traffic: • Safety requirement; • Priority for express train; • Ticketing iii. Rollingstock: • Hire & haulage charges; • Responsibility for damage & repairs; • Responsibility for loss of life, bodily harm & loss to goods iv. Settlement of account

  19. Customs Clearance Procedure

  20. EXPERT GROUP MEETING ON THE HARMONIZATION OF THE RULES AND REGULATIONS FOR FACILITATION OF INTERNATIONAL RAILWAY TRANSPORT BANGKOK CUSTOMS PROCEDURE FOR LANDBRIDGE 04-05 AUGUST 2017 UNITED NATION ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC AHMAD REZA ZAMHUDI BIN MUHAMAD TEL : 03 ‐ 8882 2873 EMAIL : zamhudi.muhamad@customs.gov.my

  21. SCOPE 1. Legislations 2. Document 3. Customs Procedure For Landbridge Services 21

  22. LEGISLATION  Customs Act 1967  Excise Act 1976  Goods Service Tax 2014  Free Zone Act 1990  Customs Regulations 1977  Customs Duties Order 2017  Customs (Prohibition Of Import) Order 2017  Customs (Prohibition Of Export) Order 2017  Customs Duties (Exemption) Order 2013 22

  23. DOCUMENT REQUIRED  Custom No. 8 (Paperless)  Train Load Manifest (TLM) or List Train Manifest (LTM)  Consignment Note  Invoice  Import License / Permit if required  General Bond/ Bank Guarantee  Packing List  Shipping Note if required 23  Train receipt

  24. CUS TOMS PROCEDURE Departing Station (Malaysia)  Customs Agent declared Customs No. 8 through systems and submit all relevant documents to Customs Officers example invoice, packing list, TLM or LTM.  Container No. declared should be the same as stated in TLM or LTM  Customs Seals.  Customs Officers released Customs No.8 through system.  Guarantee covers Duties and Tax. General Bond for Non 24 Critical Goods. Bank Guarantee for Critical Goods

  25. Continue… .. Receiving Station (Malaysia)  Create inbound Customs No. 8 (Matching)  Customs Officers ensured Customs seal is still intact. 25

  26. Customs S tation  Padang Besar, Perlis  Penang Port, Pulau Pinang  Klang Port, Selangor  Tanjung Pelepas Port, Johor  Pasir Gudang Port, Johor 26

  27. THANK YOU

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.