EXHIBIT LIST Reference No: HOC/10001 Petitioner: Route Presentation - - PDF document

exhibit list
SMART_READER_LITE
LIVE PREVIEW

EXHIBIT LIST Reference No: HOC/10001 Petitioner: Route Presentation - - PDF document

EXHIBIT LIST Reference No: HOC/10001 Petitioner: Route Presentation Published to Collaboration Area: Friday 16-Mar-2018 Page 1 of 30 No Exhibit Name Page 1 Route Overview (P1) 2 - 30 HOC/10001/0001 Phase 2a Route Overview for House of


slide-1
SLIDE 1

EXHIBIT LIST

Reference No: HOC/10001 Petitioner: Route Presentation Published to Collaboration Area: Friday 16-Mar-2018 Page 1 of 30 No Exhibit Name Page 1 Route Overview (P1) 2 - 30 HOC/10001/0001

slide-2
SLIDE 2

Phase 2a Route Overview for House of Commons Select Committee

Professor Andrew McNaughton 19 March 2018

P1 (1)

HOC/10001/0002

slide-3
SLIDE 3

2

High Speed Rail Network

P1 (2)

HOC/10001/0003

slide-4
SLIDE 4

3

High Speed Rail is 53 Years Old

P1 (3)

HOC/10001/0004

slide-5
SLIDE 5

4

International Technical Standards

P1 (4)

HOC/10001/0005

slide-6
SLIDE 6

5

Indicative Rail Corridor

P1 (5)

HOC/10001/0006

slide-7
SLIDE 7

6

HS1 Two Track Railway

P1 (6)

HOC/10001/0007

slide-8
SLIDE 8

7

200m long trains which can be coupled to run in pairs 400m long

P1 (7)

HOC/10001/0008

slide-9
SLIDE 9

8

HS2 Design Principles

  • 1. Integrated noise protection and visual screening
  • 2. Further screen planting to supplement earthworks and fit with local landscape
  • 3. An earthworks solution removes the need for a fence type noise barrier (cutting costs + maintenance burden)
  • 4. Land returned to agriculture up to the railway (opportunity to improve agricultural land)
  • 5. This earthworks solution minimises the width of the rail corridor
  • 6. Protection of environmental features (e.g. ecology, heritage, landscape)
  • 7. Boundary fence visually concealed behind the earthworks
  • 8. The majority of the original land take is handed back for productive use

P1 (8)

HOC/10001/0009

slide-10
SLIDE 10

9

Phase 2a Route Overview

P1 (9)

HOC/10001/0010

slide-11
SLIDE 11

10

  • 1. Fradley to

Kings Bromley

P1 (10)

HOC/10001/0011

slide-12
SLIDE 12

11

  • 2. Kings

Bromley to Blithbury

Newlands Lane Auto Transformer Feeder Station

P1 (11)

HOC/10001/0012

slide-13
SLIDE 13

12

Newlands Lane Auto Transformer Feeder Station

View from North looking South

P1 (12)

HOC/10001/0013

slide-14
SLIDE 14

13

  • 3. Colton to

Colwich

Newlands Lane Auto Transformer Feeder Station

P1 (13)

HOC/10001/0014

slide-15
SLIDE 15

14

  • 4. Moreton

to Ingestre

Great Haywood viaduct

P1 (14)

HOC/10001/0015

slide-16
SLIDE 16

15

  • 5. Staffordshire

Show Ground to Marston

P1 (15)

HOC/10001/0016

slide-17
SLIDE 17

16

  • 6. Marston to

Stone

Stone Infrastructure Maintenance Base - Rail

P1 (16)

HOC/10001/0017

slide-18
SLIDE 18

17

  • 7. Stone

Infrastructure Maintenance Base to Swynnerton

Stone Infrastructure Maintenance Base - Rail

P1 (17)

HOC/10001/0018

slide-19
SLIDE 19
  • Stone Infrastructure Maintenance Base - Rail

P1 (18)

HOC/10001/0019

18

slide-20
SLIDE 20

19

  • 8. Swynnerton

to Stableford

P1 (19)

HOC/10001/0020

slide-21
SLIDE 21

20

  • 9. Whitmore

Heath Tunnel to Madeley Tunnel

P1 (20)

HOC/10001/0021

slide-22
SLIDE 22

21

High Speed Porous Tunnel Portal

P1 (21)

HOC/10001/0022

slide-23
SLIDE 23

22

  • 9. Whitmore

Heath Tunnel to Madeley Tunnel

P1 (22)

HOC/10001/0023

slide-24
SLIDE 24

23

  • 10. Madeley

Tunnel to Blakenhall

P1 (23)

HOC/10001/0024

slide-25
SLIDE 25

24

  • 11. Crewe

Approaches

P1 (24)

HOC/10001/0025

slide-26
SLIDE 26

25

Crewe Existing Layout

P1 (25)

HOC/10001/0026

slide-27
SLIDE 27

26

Crewe Proposed Layout HS2 Trains Passing Crewe Highlighted

P1 (26)

HOC/10001/0027

slide-28
SLIDE 28

27

Crewe Proposed Layout HS2 to WCML Highlighted

P1 (27)

HOC/10001/0028

slide-29
SLIDE 29
  • P1 (28)

HOC/10001/0029

28

slide-30
SLIDE 30

29

High Speed Rail Network

P1 (29)

HOC/10001/0030