ENGINEERING OUR ENVIRONMENT

slide-2
SLIDE 2

Contents

  • Company Background
  • Renew Group
  • Company Structure
  • Financial Information
  • Services
  • Typical Projects
  • Contact Details
slide-3
SLIDE 3

Company Background

  • VHE was founded in 1979 in South Yorkshire,
  • perating as a civil engineering specialist.
  • The company has expanded and diversified,

providing contaminated land remediation and civil engineering services throughout the UK.

  • VHE now directly employs over 70 staff and

has a turnover in the region of £20m per annum.

  • Offices in Barnsley and Cumbernauld.
slide-4
SLIDE 4

Renew Group

In December 2001, VHE was acquired by the Renew Holdings Group (£460 million turnover).

slide-5
SLIDE 5

Company Structure

slide-6
SLIDE 6

Financial Information

Turnover 2015 - £16,565,000 2014 - £15,425,000 2013 - £14,203,000 Operating Profit 2015 - £620,000 2014 - £579,000 2013 - £529,000

slide-7
SLIDE 7

Services

Extensive experience across a variety of market sectors including:

  • Housing
  • Commercial
  • Infrastructure
  • Utilities
  • Landfill
  • Flood Defence
  • Coastal Protection
  • Nuclear & Radiological
slide-8
SLIDE 8

Services

  • Bioremediation
  • Demolition
  • Groundwater treatment
  • Soil Washing
  • Soil Stabilisation
  • Material recycling
  • Bulk earthworks
  • Highway construction
  • Landfill cell construction
  • Flood protection schemes
  • Drainage and utilities
  • Public Realm works

VHE supply a wide range of land remediation and civil engineering solutions including:

slide-9
SLIDE 9

Services

Our Technologies team support the site work through:

  • Pre-contract appraisal and site investigation work
  • Site monitoring to measure environmental affects
  • On-site testing
  • Full validation of contaminated land sites
  • Waste classification
slide-10
SLIDE 10

Typical Projects

slide-11
SLIDE 11

North Gawber Colliery, Barnsley Harworth Estates - £1.6 million

  • Redevelopment for up to 325 residential

properties.

  • Significant earthworks, involving breaking out

structures and the crushing of hard materials.

  • 300m x 6m high Reinforced earth wall.
  • Diversion of a watercourse.
  • Attenuation pond.
  • Construction of a road, footpath, footbridge

and cycle-way forming part of the new site infrastructure.

slide-12
SLIDE 12

Knowle Avenue, Ashton Under Lyme Kier Living - £55,000

  • Phase 1 soil stabilisation / lime modification

provided by our experienced in-house team.

  • Incorporated geotechnical improvement of

the road formation for new housing areas.

slide-13
SLIDE 13

Sighthill TRA Glasgow City Council - £11 million

  • Remediation of historical contamination

both ex-situ and in-situ in particular Galligu.

  • It will also see demolition, ground

engineering, deep grouting, drainage diversions and infrastructure works.

  • Design and build contract covering 50

hectares.

  • Almost 800 new homes are to be built

including new roads and pedestrian bridges, amenity parkland, a new school and sports campus, student accommodation and more.

slide-14
SLIDE 14

Shawfield Enabling Works Clyde Gateway Developments - £3.9 million

  • Key strategic site in advance of future

development and pedestrian linkages for the 2014 Commonwealth Games.

  • Re-engineering to create development platforms,

accesses and sustainable urban drainage systems.

  • Remediation of Hexavalent Chromium CrVI.
  • Innovative use of Calcium Polysulphide imported

from Japan.

  • 8000 rods inserted and almost 150,000 injections.
  • Ground Engineering Awards - Highly

Commended.

slide-15
SLIDE 15

Luneside East Development Luneside East Ltd - £3.4 million

  • The 7Ha site on the south bank of the River

Lune has a long history of industrial uses which led to contamination.

  • VHE helped secure £4 million from the

Growing Places Fund for the mixed use development including housing.

  • A design and build scheme - VHE developed

a remediation strategy for the site with WYG, which reduced the reliance on off- site disposal.

slide-16
SLIDE 16

Rylands Garage, Birmingham Birmingham City Council - £0.2 million

  • Removal of redundant fuel tanks and

interceptors, exploration for LNAPL contaminants and the removal of hydrocarbon material for Bioremediation.

  • Demolition of a public house and car park.
  • Concrete slabs and foundations, covering the

whole site area, removed for crushing and subsequent reuse on site.

  • Below slab made ground re-engineered to a

depth of circa 2m across the whole of the site to create the platform for planned development.

slide-17
SLIDE 17

Commonwealth Games Athletes Village Glasgow City Council - £6.5 million

  • 33 hectare site.
  • Remediation of 112 contaminated hotspots.
  • Selective excavation of around 140,000m³ of

contaminated soils and materials.

  • Approximately 100,000m³ of the material

underwent soil washing.

  • Bio-remediation.
  • Invasive species treatment.
  • Service disconnections and diversion.
  • Demolition.
slide-18
SLIDE 18

Otter Island, Leeds Strata Homes - £1.5 million

  • Site Clearance Works.
  • Turnover of the site including excavating cut

to fill 30,000m3 of made ground including 5000m3 of hard materials which were processed for removal from site and recycled.

  • 1200 tonne of non-hazardous materials

which were unsuitable for reuse were removed from site.

  • Extensive Vibration monitoring was

employed to ensure that works were carried

  • ut in accordance with the agreed limits.
slide-19
SLIDE 19

Trent Basin, Nottingham HCA / Blueprint - £0.8 million

  • The works involved the dredging of the basin

inlet, concrete repairs to both the basin walls and those out on the River Trent and the remediation of the land adjacent to the basin.

  • VHE secured a second contract on a

recommendation by the Homes and Communities Agency to replace 500m of basin and river walls.

slide-20
SLIDE 20

Cudworth & West Green Bypass Barnsley MBC - £17 million

  • The Cudworth & West Green Bypass comprised the

construction of 5.2km of single carriageway road.

  • Incorporating 5 roundabouts and associated

ancillary works.

  • The road was constructed on embankments up to a

maximum height of 10 metres and in cuttings to a maximum depth of 7 metres.

  • A 110 tonne rail bridge installed.
slide-21
SLIDE 21

Millennium Town Park, St Helier The States of Jersey - £8 million

  • This challenging project involved a complex

public realm scheme to remediate a 1.3Ha former town gasworks in the centre of St Helier.

  • A key feature of the remediation of the park

was the reuse of existing site material as Jersey has no facility to treat contaminated material.

  • Some material was treated and transported

to Europe by barge.

slide-22
SLIDE 22

Scour protection and flood alleviation Network Rail, Environment Agency

  • Scour protection works to 17 rail structures

throughout the UK.

  • Works involved a mixture of activities including

installation of temporary dams, fish relocation, excavation of river silts and rubble, diversion of watercourses.

  • Permanent works involved installation of fibre

reinforced concrete fabric mattresses, placement of rock armour/ gabion walls and brickwork repairs.

slide-23
SLIDE 23

National Grid Remediation Framework National Grid Property Holdings

  • Since 1996 VHE has been retained by National

Grid Property Holdings under their national term contract to undertake the remediation of former coal gas production and coking works sites.

  • In 2014 VHE were appointed to the National

Grid Framework for Gas Holder demolition and have to date demolished eight holders with two more currently ongoing.

  • VHE are also on the Scottish Gas Network

framework.

slide-24
SLIDE 24

Neepsend Lane Gasworks (Sheffield) National Grid Property Holdings - £10 million

  • VHE has carried out five phases of work on

the former Neepsend Gasworks in Sheffield between 2006 and 2012.

  • Remedial works included screening the
  • verlying construction and demolition

wastes, selective excavation, treatment and disposal of contaminated soils.

  • A total of 17,000 tonnes of contaminated

material was sentenced for treatment by bioremediation.

slide-25
SLIDE 25

Ackworth, West Yorkshire Strata Homes - £4 million

  • VHE have undertaken three phases of works at

Ackworth since 2008 on behalf of our client Strata Homes, creating over 800 new homes.

  • Works included turnkey solutions of

demolition, remediation, ground engineering, reclamation, roads, sewers and storm water attenuation.

slide-26
SLIDE 26