el cerrito high school fields project
play

El Cerrito High School Fields Project WELCOME AND INTRODUCTIONS Luis - PowerPoint PPT Presentation

El Cerrito High School Fields Project WELCOME AND INTRODUCTIONS Luis Freese, WCCUSD SITE DESIGN Marcia Vallier, Vallier Design Associates: Fencing and Landscaping PROJECT DESIGN Ike Ofodu, WLC Architects: Overall Project Design PROJECT STATUS


  1. El Cerrito High School Fields Project WELCOME AND INTRODUCTIONS Luis Freese, WCCUSD SITE DESIGN Marcia Vallier, Vallier Design Associates: Fencing and Landscaping PROJECT DESIGN Ike Ofodu, WLC Architects: Overall Project Design PROJECT STATUS Hector De Leon and David Haddad, SGI Construction Management: Project Status STADIUM USE David Luongo ECHS Principal: Use of the Stadium QUESTIONS and ANSWERS

  2. Basketball Court

  3. Fencing

  4. VISITOR TEAM ROOM & RESTROOM WEIGHT ROOM CONCESSION HOME TEAM ROOM HOME RESTROOM Architects, Inc.

  5. BUILDING A BUILDING B BUILDING C BUILDING D BUILDING E WLC EL CERRITO HIGH SCHOOL STADIUM PROJECT - OPTION 1 Architects, Inc.

  6. REMOVABLE GALV. GUARD RAILS (TYP.) PRESS BOX (TYP.) 3'�6" GALV. METAL SIDING CLG. LINE 8'�0" 7'�0" 3'�6" FLOOR LINE 3'�6" 21'�6" 21'�6" 15'�0" 12'�10" CONC RAMP (TYP.) 3'�6" 3'�0" CONC LANDING WEST ELEVATION (TYP.) STEEL BLEACHER SEAT SUPPORT (TYP.) SOUTH ELEVATION REMOVABLE GALV. 8 7 GUARD RAILS (TYP.) A�1.31 A�1.31 8'�0" 3'�6" 3'�5" 21'�6" 12'�10" 9'�5 14 " 3'�6" 3'�9 7 8 " 1'�3" 3'�0" EAST ELEVATION NORTH ELEVATION 8 7 A�1.31 A�1.31 LIFT PRESS DECK BOX 3'�6 12 " 10" 3'�6 12 " 3'�6 12 " BLEACHER LEVEL PLAN 516 � 517 SEATS BLEACHER SECTION 8 7 A�1.31 A�1.31 LIFT STORAGE STORAGE STORAGE 4'�0" 8'�7 12 " 8'�0" 3'�0" 21'�6" UP UP MAIN FLOOR PLAN (SUPPORT LEVEL) PRESS BOX SECTION Architects, Inc.

  7. Building A – Interior Buildings: • Completed: Building exteriors, interior framing and drywall • Upcoming: Additional roofing system, HVAC roof units, drywall taping, utilities and interior paint

  8. Home Bleachers Home Bleachers: • Completed: Removal of wood seats and concrete substrate prep • Upcoming: Painting, installation of new aluminum seats and fencing

  9. Visitor Bleachers Visitor Bleachers: • Completed: Installation of seats, press box, stairs and ramp • Upcoming: Fence mesh, siding and storage area structure

  10. Track Track: • Completed: Base rock added, graded and compacted • Upcoming: Final grading of track is ongoing, to be followed by asphalt and then track surfacing

  11. Field Field: • Completed: Rough grading of field, installation of drainage system, finish grading of base rock layer • Upcoming: Addition of layer of rock as substrate to field turf

  12. North Light Poles Lighting: • Completed: Light poles and fixture installation • Upcoming: Power to be run and testing to be completed

  13. View of East Light Pole Adjacent to Colusa Ave.

  14. Site Elements Site Elements: • Completed: Portion of site concrete, scoreboard, goal posts and flagpoles • Upcoming: Completion of site concrete and removal of site access ramp, fencing and landscaping

  15. El Cerrito High School Fields Project QUESTIONS and ANSWERS

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.