El Cerrito High School Fields Project WELCOME AND INTRODUCTIONS Luis Freese, WCCUSD SITE DESIGN Marcia Vallier, Vallier Design Associates: Fencing and Landscaping PROJECT DESIGN Ike Ofodu, WLC Architects: Overall Project Design PROJECT STATUS


slide-1
SLIDE 1

El Cerrito High School Fields Project

WELCOME AND INTRODUCTIONS Luis Freese, WCCUSD SITE DESIGN Marcia Vallier, Vallier Design Associates: Fencing and Landscaping PROJECT DESIGN Ike Ofodu, WLC Architects: Overall Project Design PROJECT STATUS Hector De Leon and David Haddad, SGI Construction Management: Project Status STADIUM USE David Luongo ECHS Principal: Use of the Stadium QUESTIONS and ANSWERS

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4

Basketball Court

slide-5
SLIDE 5
slide-6
SLIDE 6

Fencing

slide-7
SLIDE 7

VISITOR TEAM ROOM & RESTROOM WEIGHT ROOM HOME TEAM ROOM HOME RESTROOM CONCESSION

Architects, Inc.

slide-8
SLIDE 8

BUILDING C BUILDING B BUILDING D BUILDING E

EL CERRITO HIGH SCHOOL STADIUM PROJECT - OPTION 1

BUILDING A

Architects, Inc.

WLC

slide-9
SLIDE 9

PRESS BOX DECK LIFT

8'0"

STORAGE STORAGE

UP UP

LIFT STORAGE

3'6" 15'0" 7'0" 8'0" 3'6"

CONC LANDING (TYP.) FLOOR LINE

  • CLG. LINE
  • GALV. METAL SIDING
21'6"

REMOVABLE GALV. GUARD RAILS (TYP.) REMOVABLE GALV. GUARD RAILS (TYP.)

CONC RAMP (TYP.) 3'6" 3'6"

STEEL BLEACHER SEAT SUPPORT (TYP.)

3'6"

PRESS BOX (TYP.)

21'6" 21'6" 8'712" 4'0" 3'0" 21'6" 8'0" 10" 3'612" 3'612" 3'612"

8 A1.31 8 A1.31 8 A1.31 7 A1.31 7 A1.31 7 A1.31

516 517 SEATS

3'0" 12'10" 12'10" 9'514" 3'0" 3'6" 1'3" 3'97 8" 3'5"

BLEACHER LEVEL PLAN MAIN FLOOR PLAN (SUPPORT LEVEL) NORTH ELEVATION EAST ELEVATION BLEACHER SECTION PRESS BOX SECTION SOUTH ELEVATION

Architects, Inc.

WEST ELEVATION

slide-10
SLIDE 10

Buildings:

  • Completed: Building exteriors, interior framing and drywall
  • Upcoming: Additional roofing system, HVAC roof units,

drywall taping, utilities and interior paint

Building A – Interior

slide-11
SLIDE 11

Home Bleachers

Home Bleachers:

  • Completed: Removal of wood seats and concrete

substrate prep

  • Upcoming: Painting, installation of new aluminum seats

and fencing

slide-12
SLIDE 12

Visitor Bleachers

Visitor Bleachers:

  • Completed: Installation of seats, press box, stairs and ramp
  • Upcoming: Fence mesh, siding and storage area structure
slide-13
SLIDE 13

Track

Track:

  • Completed: Base rock added, graded and compacted
  • Upcoming: Final grading of track is ongoing, to be followed

by asphalt and then track surfacing

slide-14
SLIDE 14

Field

Field:

  • Completed: Rough grading of field, installation of drainage

system, finish grading of base rock layer

  • Upcoming: Addition of layer of rock as substrate to field turf
slide-15
SLIDE 15

North Light Poles

Lighting:

  • Completed: Light poles and fixture installation
  • Upcoming: Power to be run and testing to be completed
slide-16
SLIDE 16

View of East Light Pole Adjacent to Colusa Ave.

slide-17
SLIDE 17

Site Elements

Site Elements:

  • Completed: Portion of site concrete, scoreboard, goal posts

and flagpoles

  • Upcoming: Completion of site concrete and removal of site

access ramp, fencing and landscaping

slide-18
SLIDE 18

QUESTIONS and ANSWERS