EIF-ES / UNOPS Annual Joint Supervision Mission 28 Mar 01 Apr 2016 Kick-off meeting By CHHIENG Pich, Director, DICO National Project Director, TDSP Director, EIF-NIU 1. Brief update on Cambodia economic development 2. Progress Update on
- 1. Brief update on Cambodia economic development
- 2. Progress Update on TDSP
- 3. Progress Update on EIF
I. EIF Tier 1 implementation II. Final Evaluation of Tier 1 III. CEDEP I – M&E function IV. CEDEP II – M&E function V. CEDEP II MTE
- 4. Capacity building plan implementation
- 5. Exit and Sustainability Strategy
- 6. Medium Term Plan (MTP) for Aid for Trade 2016-2020
6.0% 7.1% 7.3% 7.4% 7.1% 6.9%
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
2010 2011 2012 2013 2014 2015e
PERCENT CHANGE
1.3 Cambodia’s Real GDP Growth Rate
Source: MEF
1.4 GDP Per Capita (current US$)
Source: CDC
1.2 Poverty Trends in Cambodia
Source: MoP
Achievement Cambodia’s MDGs
Millennium Development Goals (2000-2015)
- Goal 1: Eradicate extreme poverty and hunger
- Goal 2: Achieve universal primary education
- Goal 3: Promote gender equality and
empower women
- Goal 4: Reduce child mortality
- Goal 5: Improve maternal health
- Goal 6: Combat HIV/AIDS, malaria and other
diseases
- Goal 7: Ensure environmental sustainability
- Goal 8: Develop a global partnership for
development
- Goal 9: De-mining, UXO and victim assistance
- The poverty rate has declined
by more than half, falling from 53.2 % in 2004 to below 18% in
- 2014. (Source: MoP)
- The WB estimated Cambodia
achieved its MDGs 1 in 2009.
1.5 Cambodia’s Economic Prospects
- Cambodia is set to become a middle income
country by 2030, and hope to achieve high- income status by 2050.
Source: MEF
1. Project Development Objectives (PDOs): TDSP will contribute to increase the Royal Government of Cambodia's efficiency in formulating and implementing effective trade policies. 2. Multi-Donor Trust Fund : EU, DANIDA & UNIDO 3. Trust Fund Manager : World Bank 4. Executing Agency : DICO/MoC 5. Board approval date : 07 Jan 2009 6. Effective date : 09 Mar 2009 7. Duration : 5 years (until 31 Mar 2012) 8. Original budget : US$12,350,000 9. Additional budget : US$3,100,000
- 10. First extension
: 31 Jan 2014 (22 months)
- 11. Second extension
: 31 Mar 2015 (14 months)
- 12. Third extension
: 14 Aug 2016 (17 months)
- 13. WB Implementation Support Mission : 27 Oct – 27 Nov 2014
- 14. EU-ROM & WB Implementation Support Mission: 22 Sep – 02 Oct 2015
No Identified Projects # Projects 1. Total project under TDSP 29 2. Projects completed and closed 20 3. Ongoing projects 9
- Projects will be completed and closed by Aug 2016
ASYCUDA World System (GDCE-MEF), ICT Master Plan – Automation of Certificate of Origin (MoC), Automation of Business Registration (BRD), Automation of SPS Certificate (GDA-MAFF), Trade Training and Research Institute (TTRI-MoC), Drafts of Rice Standards – Certification Schemes for Rice (Accreditation System) (ISC-MIH), Development of a stronger National system for IP generation, protection, administration and enforcement (DIPR), Support for the Arbitration Council and Dispute Resolution in Cambodia Strengthening the Operational Capacity of the National Commercial Arbitration Centre 9
Cumulative Expenditure $12,165,487 (79%) Funds Required for DICO Operations & including various consultants $467,809 (3.0%) US$ 2,816,704 Balance Commitment under all MOUs including GDA, TTRI, ACF, NCAC & ICT but excluding the closed projects (18%)
TDSP Funds Position
As of 31st December 2015
(Unaudited - Expressed in Percentage of the Total Grant Amount of US$ 15.450 million)
- We have $ 3,284,513 to spend in the next
8 months,
- We need to spend $410,564 each month,
- Or $ 1,094,838 each quarter
TDSP Fund
Disbursement by Year, As of 31st December 2015
(Expressed in Percentage of the Total Grant Amount of US$ 15.450 million)
500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000
2009 2010 2011 2012 2013 2014 2015 116,584 615,558 1,674,943 2,751,160 2,087,570 2,704,645 2,214,943
17.5% 14.3% 4% 0.75 % 10.8% 17.8% 13.5%
NOTE: *. Cumulative Disbursement = USD 12,165,487 **. Cumulative Disbursement as a Percentage of Total Grant = 78.7%
Project Objective: The project aims at strengthening the in-country arrangements of the Enhanced Integrated Framework in order to increase Cambodia’s ownership of trade-related technical assistance (TRTA) and maximizing the benefits that the country, in particular the private sector, can derive from the Enhanced Integrated Framework.
- 1. Donors
: EIF Multi Donor Trust Fund, managed by UNOPS
- 2. Implementing Entity
: DICO/MOC (NIU)
- 3. Board Approval
: Date: September 29, 2009
- 4. Effective kick-off date
: February 3, 2010
- 5. Duration
: 6 years (until April 30, 2016)
- 6. Original budget
: US$1,293,900
- 7. Additional budget (CTIS update) : US$200,000
- 8. No-cost extension
: July 31, 2015 (8 months)
- 9. Current end date
: April 30, 2016
- 10. Last Supervision mission
: May 2015
- 11. Ongoing Supervision Mission
: Mar 29-Apr 01, 2016 (joint EIF-ES and UNOPS)
Trade SWAp Strategic Outcomes and Impacts EIF TIER 1 Program M & E Framework Strategic Outcome Strategic Indicators/KPI Target Outcomes KIPs Progress Results as of 29 March 2016 SO.3.1 RGC institutions can effectively integrate, coordinate and implement trade related reforms KPI.3.1 Reform agenda is implemented according to government strategy and international commitments. Roadmaps are updated and implemented Outcome #1: Sufficient institutional and management capacity built in EIF Countries to formulate and implement trade- related strategies and implementation plans CTIS updated one more time, using SWAp Pillar structure and three Pillar Roadmaps (combination of resource plan, action plan and M&E). Update should feed into Government next 5-year development plan.
- CTIS update 2014-2018
and SWAp Roadmap Update 2014-2018 launched by Cambodia’s Prime Minister on Feb 18, 2014.
- CTIS recommendation
fed into NSDP 2014-2018.
- The Medium-Term Plan
(MTP) 2016-2020, was formulated in 2015.
Trade SWAp Strategic Outcomes and Impacts EIF TIER 1 Program M & E Framework Strategic Outcome Strategic Indicators/KPI Target Outcomes KIPs Progress Results as of 29 March 2016
SO.3.5 Designated RGC institutions can effectively represent and negotiate Cambodia’s interests in trade at the bilateral, regional, and multilateral fora. KPI.3.5 National program for negotiating trade reform is implemented successfully National program to be set up by mid 2012 Outcome #3: Coordinated delivery of trade- related resources (funding, Technical Assistance, etc.) by donors and implementing agencies to implement country priorities following the adoption of the CTIS Action Matrix The Trade SWAp Roadmaps are living document, updated every year on the basis of programme review, used to plan and align DP interventions with government policies and monitor progress towards programme development
- bjectives.
- SWAp Pillar Roadmaps have
been updated and simplified as part of the CTIS update process
- The EIF Tier 1 project has been
a great support to Trade SWAp Pillar Roadmaps Goal III:
- The Multi-Donor Trust Fund–
also known as TDSP, has significantly contributed to Trade SWAp Pillar Roadmaps Goal I: Reform and Cross- Cutting Issues for trade Development.
- The MTP formulation, the
Trade SWAp Roadmap 2014- 2018 has been reviewed and assessed through a stock taking exercise with key stakeholders.
- Achievements in the SWAp
Roadmaps are being monitored quarterly by DICO M&E unit.
Trade SWAp Strategic Outcomes and Impacts EIF TIER 1 Program M & E Framework Strategic Outcome Strategic Indicators/KPI Target Outcomes KIPs Progress Results as of 29 March 2016
SO.3.5 Designated RGC institutions can effectively represent and negotiate Cambodia ’s interest in trade at the bilateral, regional and multilateral fora. PI.3.5 National program for negotiating trade reforms is implemented successfully National program to be set up by mid 2012 Outcome # 4: EIF Countries secure resources in support of initiatives that address CTIS Action Matrix priorities Annual work and budget plan from MoC and line ministries indicate needs for ODA and key priority areas. Annual work plans and budget plans in line with SWAp priorities and contributing to SWAp expected
- utcomes.
- MoC is moving to result-based
- management. As a consequence, each
department was invited to indicate expected results and corresponding budget for 2016-2018. DICO has aligned its annual work plan and AFT resources mobilization strategy accordingly.
- MoC and line ministries have actively been
involved in formulation of the Medium Term Plan (MTP) 2016-2020, to mobilize Aid for Trade (AfT) in support of the continuing implementation of its Trade SWAp Roadmap 2014-2018. BB.3.5.1 Capacity of MoC and Line Ministries to negotiate Cambodia’ s interest in trade at the bilateral, regional and multilateral level enhanced Line Ministries contribute to the preparation
- f the negotiation
process Line Ministries provide inputs in the national program for negotiation
1 Output 1: NIU staffing and training
Program Objectives Activities Expected outputs Status as of March 2016 To strengthen the NIU capacities to implement TRTA programs in an efficient and effective manner 1.1 Aid-For-Trade Program Management All TRTA projects handled by NIU are assessed as satisfactory and contributing to SWAp implementation On-going (To be completed by April)
- NIU is currently handled and functioned for the
solid purpose of managing AfT.
1.2 Short-term training for NIU staff capacity development (Local and overseas) D/ICO can function effectively as a one-stop program management unit for SWAp implementation Completed
- The training features primarily English training
(to MoC and L/O), communication, and M&E aspects of programme management
1.3 MoC Seminar Series on Trade, Development, Regional Integration and Private Sector Development The role of trade in development, poverty reduction and employment generation is better appreciated among various stakeholders Cancelled
- Organizing 2 provincial workshops is cancelled.
1.4 Exchange program with Laos and Bhutan NIU in Bhutan, Cambodia and Laos are able to learn from each other on AFT and TRTA best practices Completed
- The 5th NIU Exchange Programme (Cambodia –
Laos – Myanmar) was conducted on 6-9 December 2015 in Siem Reap province.
1.5 DICO annual retreat Problems, issues and lesson learned are discussed and solutions and/or alternatives
- found. Action plans are established and put
into action. Completed
- The DICO Annual Retreat was organized on
13-14 August 2015 in Sihanoukville. 1.6 Aid-for-Trade related capacity needs assessment with MoC Training Institute Stock taking of how Aid-for-Trade has been managed in Cambodia since launching the SWAP and what capacities are still lacking Cancelled (transferred to TTRI) 1.7 Recruitment Costs/Sundries Recruitment are conducted in a swift manner and in conformity with procurements rules On-going (To be completed by April) 1.8 NIU Running Cost/Operation & Maintenance n/a
2 Output 2: Support to creation of liaison offices and awareness raising on EIF in line ministries Program Objectives Activities Expected outputs Status as of March 2016 To maintain a network of SWAp focal points in line ministries working as an extended NIU 2.1 Training for L/O and Line Ministries on the formulation
- f trade-related indicators in
sectoral policies Line Ministries are providing better project proposals for the different donors assistance. On-going
- In 2015, L/O and line ministries participated
in a number of meetings to formulate the MTP and project concept notes.
2.2 Organize Quarterly Meetings (Core Team, L/O, and MIEs) EIF programme implementation benefits from inputs from all relevant line ministries through EIF L/O and core team members Completed
- Two quarterly meetings were organized in
2015.
- 1st quarterly meeting of 2016 was organized
- n 05 Jan 2016.
3 Output 3: Support to Sub-Steering Committee on Trade, Trade Integration Strategy Implementation To service the regular meetings of the Pillar WG, the IC and the SSC and ensure decisions are broadly communicated 3.1 Organize monthly IC meetings RGC is able to steer AFT resources into relevant and bankable projects On-going
- Five IC meetings were organized in 2015.
- Two IC meetings were organized in early
2016.
3.2 Organize and support quarterly SSC meetings RGC is able to engage more stakeholders in the implementation of the Trade SWAp, in particular from private sector
On-going
- Four SSC meetings were organized in 2015.
- First SSC meeting was held in Jan 2016.
4 Output 4: Awareness Creation & Monitoring on EIF and SWAp for national stakeholders (private sector, public sector, capital and provinces) Program Objectives Activities Expected outputs Status as of March 2016
To raise awareness of different stakeholders
- n the importance of
trade as an engine of growth and how EIF supports this 4.1 Organize regular MoC- DP meetings Local DPs are supportive of initiatives under the EIF Program and further align their programs to identified needs Completed
- DPs are regularly invited to participate in the SSC
- meetings. They discussed and considered to align
their development programs. 4.2 Organize regular MoC- Private Sector meetings Private sector participation in the trade sector development, mobilization of Aid-for-Trade resources and implementation of AFT projects increases Completed
- Private Sectors (PSs) are regularly invited to
participate in the SSC meetings and focused group meetings. Particularly, for the formulation
- f the MTP 2016-2020.
4.3 Workshop on Aid-for- Trade, Trade Mainstreaming and NSDP stock-taking Take stock of the progress in implementing trade-related components of the NSDP and RS On-going
- Aid-for-Trade Pledging Roundtable Meeting is
going to organize on 31st March 2016. 4.6 CTIS 2014 implementation mid-term review Take stock of reform and funding gaps at mid-term point Completed
- The MTP formulation 2016-2020 included a
review of CTIS Implementation was completed October 2015. From 2016 onwards the exercise will be carried out by NIU. 4.7 Study on the preparing for Cambodia's graduation from LDC status: scenarios and impact for export-led sectors A roadmap for preparing Cambodia's trade sector for moving into middle income status is shared with wide stakeholder audience On-going
- The study on the preparing for Cambodia's
graduation from LDC status, is ongoing, and it’s expected to be finished in early April 2016. 4.8 Study on Cambodia's competitiveness for selected markets in an ASEAN context Cambodia is better prepared to enter into FTA negotiations with ASEAN dialogue partners and key export markets Completed
- Conducted under TDSP.
- Study is validated by MoC Senior Minister.
5 Output 5: Support towards Preparation of Projects for Funding Program Objectives Activities Expected outputs
Status as of March 2016
To support the implementation of CTIS 2014-2018 through projects 5.1 Consultations for new SWAp project proposal formulation (as per NIU retreat discussion), eg CEDEP III, JICA, SIDA, etc. Consultation workshops organized with resident DPs to assess support for CTIS 2014-2018 implementation. Completed
- DICO/NIU annual retreat was organized on
13-14 Aug 2015 in Sihanoukville. 5.2 National Consultant for new project formulation Project proposals are developed and endorsed by SSC On-going
- The development of a concept note for
ACCESS TO FINANCE is ongoing. 5.3 EIF Core team retreat Stock taking of progress made by the different components of the EIF program in Cambodia Cancelled
- It was conducted jointly with DICO/NIU
Annual Retreat on 13-14 August 2015.
6 Output 6: Development of promotion and communication strategy and relevant tools
To develop communication
- utputs to raise
awareness on EIF program objectives and achievements 6.1 Organize communication support for each SWAp-related events Increased understanding and awareness of public on role of trade in the country's economic development On-going
- National consultant's contract is ongoing—
it will be ended on 30 April 2016. 6.2 Update SWAp communication strategy using EIF ES dedicated tools Maintain different stakeholders informed
- n SWAp and EIF achievements and
progress On-going
- A detailed communication plan was
developed to raise awareness on EIF programme activities, objectives and achievements. 6.3 Update SWAp website regularly, including communications products and factsheets Higher visibility of the EIF program through a bilingual portal On-going
- Trade SWAp website regularly updated by
NIU communication cell.
7 Output 7: Promotion of Cambodia’s TRTA and trade mainstreaming experience with other LDCs, increased exposure of NIU to AfT Program Objectives Activities Expected outputs Status as of March 2016 To share Cambodia's EIF successes and experience with
- ther LDCs
7.1 Foreign delegations are meeting relevant stakeholders and getting best practices on SWAp in the trade field in Cambodia Cambodia's TRTA and EIF experience is recognized as best practices and help other LDCs in their trade development vision Completed
- Three foreign delegations were visited in Cambodia 2015-
Korea University on Jan 20, 2015, Vanuatu’s EIF team on 21-22 Jan, 2015, and Mr. Peter Cederblad, SIDA in Stockholm on 10 -11 March 2015.
- Once again, a Korea University visited in Cambodia on 2
Feb 2016. 7.2 Participation of Cambodian officials and Private Sector representatives in international trade events Increased exposure of Cambodian public and private sector representatives in the role of trade in national development and the success of Cambodia in mainstreaming trade On-going
- 2 members of the MoC delegation, attended the WTO 10th
Ministerial Conference on 15-18 December 2015 in Nairobi, Kenya-funded by EIF Tier 1.
- 2 MoC officials to attend EIF SC meeting in April 2016
(funded by government budget) 7.3 Participation in RTG and other AFT related events Cambodia's AfT experience is documented and improved by participation in high-level fora Completed
- 2-member MoC, attended the EIF Global Platform on
March 17-19 2015 in Geneva funded by EIF.
- 3-member MoC delegation, attended the 5th Global review
- f AfT organized by the WTO on June 30-July 2 2015 in
Geneva (2 members funded by EIF Tier 1).
8 Output 8: Evaluation and international auditing of EIF Tier 1 program Program Objectives Activities Expected outputs Status as of March 2016 To measure progress made during the year and address deficiencies and shortcomings 8.1 Final Project Independent Evaluation The Tier 1 project is evaluated and its contribution to the SWAp and trade development is highlighted On-going
- The first draft report of Final Evaluation has completed
and submitted to DICO management for review and comments on 24 March 2016.
- The Tier 1 Final Preliminary Findings Meeting is going to
- rganize on 28 March 2016.
8.2 Prepare regular visits of UNOPS and for M&E purposes Guidance on good governance and efficiency are provided and adhered to On-going
- The EIF ES and TFM joint supervision mission is ongoing
(29 March-01 April 2016). 8.3 External auditing of EIF Tier 1 Project The firm regularly audit the accounts and make recommendations on findings On-going
- The external audit Financial Statement year ended 31
December 2014, was conducted jointly with TDSP in April 2015.
- The external audit Financial Statement year ended 31
December 2015, is being conducted jointly with TDSP in March 2016. 8.4 Update work plan and operations on basis
- f evaluation and audit
reports Improved implementation of the EIF fiduciary/financial components On-going
- The MoU amendment #7 signed on 09 June 2015 with a
revision of work plan and budget plan.
- The MoU amendment #8 is being prepared for a month
(April 2016) No-Cost Extension.
EIF Tier 1 (Phase I and II)
- 1. Starting date:
Feb 2010
- 2. Closing date:
Mar 2016
- 3. Net amount of Phase 1:
709,900
- 4. Total amount of Phase 2:
584,000
- 5. Total amount (P1+P2):
1,293,900
- 6. Total fund received (P1+P2):
1,293,900
- 7. Total fund disbursed:
1,179,865 EIF Tier 2 (CEDEP I and II)
- 1. Start date:
Jul 2012
- 2. Closing date:
Mar 2016
- 3. Total fund received:
225,000
- 4. Total fund disbursed:
139,844
As of December 31, 2015 (CEDEP I – US$ 110,190 and CEDEP II – US$ 29,654)
- 50,000
100,000 150,000 200,000 250,000 300,000 350,000 2010 2011 2012 2013 2014 2015 12,844 192,991 313,290 284,826 186,475 189,438
As of December 31, 2015 – Total Disbursement – US$ 1,179,865 or 91.2%
No. Description Beneficiaries (number) % of female participants 1 Domestic training: English, Project management and M&E, 21 35 2 M&E and Communication 40 25 3 Communication for EIF and TDSP Programs 59 30 4 Financial Management for EU Grants in Bangkok, Thailand, 31 August - 02 September 2015. 2 5 Contract Administration in Kuala Lumpur, Malaysia, 25-28 October 2015 2 50
Status of Implementation of ES/TFM Recommendations in May 2015 - 1/4
# Recommendation Timeline March 2016 Status 1
While a No-cost extension (NCE) for Tier 1 is envisaged till 31 March 2016, it is recommended that specific exit steps should be elaborated and fully implemented as part
- f the NCE workplan to ensure the
sustainability of the project outcomes and the continuation of momentum beyond the project funding
15 June 2015 Completed
- NIU submitted the first draft sustainability strategy
and exit workplan to ES on 08 June 2015.
- On 17 June 2015, NIU received feedback and
comments from the ES, to improve the exit strategy to be more comprehensive and applicable.
- The final exit and sustainability strategy (narrative
document) submitted to ES on 09 September 2015.
2
In the run-up to the end phase of Tier 1 and CEDEP I, it is recommended that the communication and M&E teams of DICO, in collaboration with relevant Main Implementing Entities (MIEs) to take stock of project results, good practices and success stories and to share them with the EIF constituencies and other stakeholders. As soon as possible and no later than 2 months before the closing of the projects
On-going
- Story in success on High Value Silk and Milled Rice
components
- SWAp newsletters volume 4 and 5
- Short video on “Trade Start from Here”, Short video
- n high value silk, featured out the success of
women entrepreneur in silk sector
- The proceedings of the 5th NIU Exchange
Programme.
- Stocktaking success story - EIF Tier 1 and Tier 2 is
prepared and submitted to management for review and comments.
Implementation of ES/TFM Recommendations in May 2015 – 2/4
# Recommendation Timeline March 2016 Status 3
The mission understood that DICO is going through a restructuring process. It is recommended that DICO shares with the ES and TFM its new organisational structure Once the new structure is approved by relevant authorities
On-going
- The new organigram for DICO is being finalized
for submission to MoC for review and approval. The necessary supporting documents for the new
- rganigram are being prepared these include
process mapping and ToRs of the new units.
4
As the Trade Swap Roadmap is the
- verarching logical framework of EIF
support to Cambodia, it is recommended that the M&E of Tier 1, CEDEP I and CEDEP II is linked up with the Trade Swap result framework and its key performance
- indicators. Where possible, DICO is
recommended to undertake the M&E of Trade Swap as a whole and regularly inform the EIF and other development partners of progresses made in key performance indicators 31 December 2015
Completed
- The linkage between the M&E of Tier 1 and the
Trade Swap result framework was developed and shared with key stakeholders.
Implementation of ES/TFM Recommendations in May 2015 – 3/4
# Recommendation Timeline March 2016 Status
5 Procurement files should be kept complete by filing the supporting documents, thus maintaining Audit trail. This includes the following:
- Splitting of costs between EIF and TDSP
- n co-funded activities have to be
properly reflected in the procurement files (and finance files).
- Notes and evidences of contract
negotiations and rejections (for example for the EIF Manager position).
- Advertisement of extension of deadlines
for applications ( for example EIF Manager position) Ongoing 30 June 2015 30 June 2015 30 June 2015
Completed
- DICO procurement unit has undertaken its
necessary action to complete all the points as agreed timeline.
Implementation of ES/TFM Recommendations in May 2015 – 4/4
# Recommendation Timeline March 2016 Status
6 A specific capacity building plan is made for the Finance Unit Chief in every area
- f his work, such budget preparations,
budget revision preparations, financial reporting, cash-flow forecasting and financial planning 30 June 2015 Completed
- Budget plan/budget revision preparations on 06 July
2015 (by DICO IC).
- Financial Reporting/IFRs preparations on 09
September 2015 (by DICO IC).
- Financial Management Procedures on 14 October
2015 (by DICO IC).
- On the job training through coaching and mentoring as
daily basis (by DICO IC).
- Financial Management for EU Grants in Bangkok,
Thailand, 31 August - 02 September 2015. 7 The Mission reiterates the recommendation of the Auditors that surprise checks are made on Petty Cash Start from now On-going
- On 26 March 2015
- On 23 July 2015
- On 22 December 2015
- Support the formulation of programme and project proposals to cover the period
2016-2020,
- Coordinate CEDEP III formulation consultation,
- Support to DICO, EIF Core team and liaison officers in particular providing training,
- Revise CEDEP II M&E component work plan and budget plan following CEDEP II MTE
report,
- Support the implementation of CEDEP I and II projects,
- Provide guidance to NIU M&E staff on implementation of Evaluation Function
components of CEDEP I and II,
- Programme-level M&E and reporting,
- Support to Cambodia delegation attending EIF SC meeting in Geneva,
- Close the EIF Tier 1 project,
- The Project Completion Report will be prepared in April 2016,
- The Project Closing Procedures will be done in accordance with the MOU and EIF and
TFM’s requirements.
- Final Evaluation consultant was recruited and commenced the work on 15
February 2016.
- The inception report was produced and submitted to key stakeholders on
25 February 2016.
- Data collection through stakeholders consultation meetings and key
stakeholders interviews and participatory rapid appraisal, was completed
- n 15 March 2016.
- Draft Evaluation Report was prepared and submitted to DICO
management on 24 March 2016.
- Preliminary Findings Meeting was organized on 28 March 2016.
- Final Evaluation Report is expected to be available by early April 2016.
Rating System
Category Color
- 1. Very good
- 2. Good
- 3. Satisfactory
- 4. Deficient
- 5. Unsatisfactory
Relevance The final evaluation rated the EIF Tier 1 as “GOOD” based on the rating on how extent project has suited to the priorities and policies of target group, Cambodian government and donor community, as the first outcome of EIF was to achieve sufficient institutional and management capacity built in Cambodia to formulate and implement trade- related strategies and implementation plans. Good Effectiveness The project has been rated as VERY GOOD by measuring the extent to EIF Tier 1 attained its objectives. The key achievements noted in this regard that DICO has been established at MOC in 2007 in the purpose of managing the AfT while there was almost no capacity of the ministry staff in formulating trade strategy. Fist CTIS was developed by EIF ES consultant and the 2nd update CTIS was done by UNDP whereas the latest (3rd) update has been done through DICO. Very Good Efficiency Tier 1 in both quantitative and qualitative aspects is rated as “GOOD”. All the resources (funds, human resources, time, expertise, etc.) were allocated strategically by EIF ES and RGC to achieve outcomes. Fund flow and activities were on
- time. Compare to other projects, EIF Tier 1 project had enjoyed better flexibility in annual planning process every year.
It was based on the actual strategic requirements of capacity development and it was real time planning and implementation. Good Outcome achievements The Final evaluation rated on EIF Tier 1 project outcome achievements as VERY GOOD based on the overall
- assessment. The project aimed at strengthening the in-country arrangements of the Enhanced Integrated Framework
in order to increase Cambodia’s ownership of trade-related technical assistance (TRTA) and maximizing the benefits that the country, in particular the private sector. Very Good Sustainability The Final evaluation rated the likelihood of sustainability of EIF Tier 1 project outcomes as GOOD based on the overall assessment. Good
Outputs Evalution Rating 01 NIU Staffing and Training. GOOD 02 Mainstreaming trade through Aid-for-Trade project implementation with line ministries. GOOD 03 Support to Sub-Steering Committee on Trade, Trade Integration Strategy Implementation. VERY GOOD 04 Awareness Creation & Monitoring on EIF and SWAp for national stakeholders (private sector, public sector, capital and provinces). SATISFACTORY 05 Support towards Preparation of Projects for Funding. GOOD 06 Development of promotion and communication strategy and relevant tools. GOOD 07 Promotion of Cambodia’s TRTA and trade mainstreaming experience with
- ther LDCs, increased exposure of NIU to AfT.
VERY GOOD 08 Evaluation and international auditing of EIF Tier 1 programme. GOOD
Rating System
Category Color
- 1. Very good
- 2. Good
- 3. Satisfactory
- 4. Deficient
- 5. Unsatisfactory
For EIF Tier 1:
- 1. A specialized econometric study on the EIF Tier 1 investment will be worth carried out for a better view on cost
benefit analysis of such investments;
- 2. Options needs to be explored to the best use of available funds under EIF CEDEP I or II projects, so as to ensure
continued support not only to the EIF program but also to DICO and to the key SWAp stakeholders, to bridge the gaps until the next programming cycle;
- 3. The capacity development intervention shouldn’t stop. Tier 1 should continue through further phases of EIF
implementation or through streamlining with other trade sector project/ programs; Cost sharing modality (e.g. 50- 50) to be discussed and decided between the RGC and the donors. For Future Program Design and Implementation:
- 1. Future EIF implementation should ensure more inclusive of Gender mainstreaming and Disaster or Crisis
management;
- 2. Special attention should be given for Pro-poor mechanisms are at place in design of AfT and trade sector policy,
plans and their implementations.
- 3. Environment and social protection issues should be also well taken care of in policy and program formulation and
implementation;
- 4. Strong consideration needed to resume incentive/motivation schemes such as the Priority Operating Cost (POC)
mechanism for salary supplementation to the government staff.
- 5. Baseline should be established on the results framework from the beginning and careful control should be at place
for any change in the framework.
- Capacity development is a continuous process and it always pays-off sooner or later. EIF Tier 1 project is
itself an example of capacity improvement and growth in the trade sector in past five years.
- The setup and functional of Trade SWAp and SSC and IC had been considered a model worth adopting in
- ther LDCs benefiting from the integrated framework. The linkages between Cambodia Trade SWAP Pillar
3’s Roadmap and Cambodia EIF Tier 1 Program M&E Framework are highly evident. Contribution of EIF to inclusive growth and Cambodia’s medium term AfT strategy highlights the importance of AfT in enabling economic growth in partner countries. Its development policy emphasizes the role of (rapid) economic growth as a key element underpinning the development process and its importance for poverty reduction.
- There was a generally positive view of the EIF’s ability to contribute to the improvement of the capacity of
government officials; this was the strongest among beneficiaries, specifically DICO staff and LOs from the line-ministries.
- Cambodian government had suspended the Priority Operating Cost (POC) for the government staff in
middle stage of EIF implementation and since then the absenteeism and lack of interest continued to prevail among the low paid government support staff in implementation of EIF Tier 1 activities without having the salary supplementations. Similarly the full engagement of the LOs from line-ministries also suffered from the termination of the salary-supplement mechanism in all the ministries of RGC. It was a great challenge for the project and EIF management took some initiatives to strengthen the link between the LOs and senior officials of the respective institutions, specially engaging them in soft skills development and exposure visits to learn and perform better.
See t to attach ched t table
Outcomes Expected Outputs Key Activities Implementation Status as March 2016 Remarks Outcome #1: Strengthen the NIU’s capacity to monitor and evaluate progress made under Trade SWAp, including evaluating impacts and results of technical assistance Output #1: A mid-term independent evaluation
- f CEDEP I- is organized
and carried out 1.1 ToRs for independent mid-term evaluation team developed, shared and endorsed by ES and TFM The ToRs for independent mid-term evaluation team was developed and endorsed by ES and TFM. Completed 1.2 Mid-term evaluation team identified and recruited (one international, one national) One international and one national consultant was successfully recruited in September 2014. Completed 1.3 Draft report of mid-term evaluation team reviewed and commented Draft report completed and submitted in October 30, 2014 Completed 1.4 Final mid-term report received Final mid-term report submitted to DICO/NIU on November 26, 2014 Completed Output #2: A final independent evaluation
- f CEDEP I- is organized
and carried out 2.1 ToRs for independent final evaluation team developed, shared and endorsed by ES and TFM TOR for final evaluation team drafted and submitted to DICO director and EIF programme manager to finalize On-going 2.2 Final evaluation team identified and recruited (two international, two national – one international expert for each product sector) The final evaluation team have been reduced to only recruit one lead international and one national consultant Not yet started 2.3 Draft report of final evaluation team reviewed and commented AWP 2016 (Q2) Not yet started 2.4 Final evaluation report received AWP 2016 (Q2) Not yet started
Outcomes Expected Outputs Key Activities Implementation Status as of March 2016 Remarks Outcome #2: Strengthening the NIU’s capacity to disseminate progress and results of technical assistance under Trade SWAp Output #1: A final independent evaluation f CEDEP I- is organized and carried out 1.1. Presentation prepared in Khmer for dissemination workshops Completed for the MTE report and presentation On-going 1.2.5x3=15 regionals workshops organized and held for disseminating monitoring results and evaluation reports One regional workshop basically focused on Trade SWAp and EIF CEDEP I has been
- rganized on 28 May in Rattanakiri province,
which participated by line ministries and
- fficials from 5 provinces.
On-going Output #2: Findings from evaluations (mid-term and final) are published and disseminated within Cambodia and to the international community 2.1 Exec Summaries of mid-term and final evaluations reports translated into Khmer
- Completed for MTE report
- AWP 2016 for final evaluation
Completed Not yet started 2.2 NIU to report on mid-term and final evaluation to SSC (NSC) Completed for MTE Pending for Final evaluation 2.3 Evaluation reports uploaded to website Completed for MTE Pending for Final evaluation 2.4 Final evaluation report published and printed AWP 2106 Not yet started 2.5 Event for national and international audience organized in PP to disseminate final evaluation AWP 2016 Not yet started
Outcomes Expected Outputs Key Activities Implementation Status as of March 2016 Remarks Outcome #2: Strengthening the NIU’s capacity to disseminate progress and results of technical assistance under Trade SWAp Output #3: Management Function and Core Teams 3.1. M&E and communication training on Tier2 and Trade SWAp
- M&E and Communication training conducted
- n 15-16 January 2015
- Communication training conducted on 12-13
February 2015 Partly completed 3.2. Preparation, publication and dissemination of CEDEP I material In cooperation with DICO communication team On-going 3.3 CEDEP I MIEs quarterly meeting (L/O, Core team)
- The 1st Quarterly meeting was jointly
conducted with Tier 1 on 06 March 2015
- The second Quarterly meeting was conducted
- n 23 June 2015 and third on 5 Jan 2016
On-going 3.4 Introductory team building workshop for core teams, IAs and NIU This activities will be carried out under EIF Tier 1 instead Completed 3.5 National Support Consultant (will be used
- nly upon the clearance of ES and TFM)
Project formulation to be follow-up with MIEs Not yet started 3.6 one National M&E consultant full time Recruited on September 2014 The consultant is on board and on-going 3.7 FP, NIU and core team monitoring and evaluation of individual component delivery Field visit will be conducted by NIU management and staff, consultant, core team and M&E unit to the project implementation site Partly completed 3.8 Participation of core team members to MIE events overseas Core team from CEDEP I programme are being selected to joint MIEs event overseas up on their active participation with the project Partly completed 3.9 Operation cost To cover up recruitments, stationery and other
- verheads
On-going
No. Description Amount/Budget (USD) Remarks 1
Total project component budget (3 years)
$312,960
This amount included government contribution
- f $22,440
2
Total fund received as of 12 Dec 2014
$150,000
CEDEP I M&E have received the first fund by 25 Dec 2012
3
Total fund disbursed as of 30 Dec 2015
$67,802.98
This amount only covered the disbursement period
- f 01 Jan to 30 Dec 2015
Implementation of ES/TFM Recommendations in May 2015 – 1/2
# Recommendation Timeline March 2016 Status 1 While a No-cost extension (NCE) for CEDEP I is envisaged, it is recommended that specific exit steps should be elaborated and fully implemented as part
- f the NCE workplan to ensure the
sustainability of the project outcomes and the continuation of momentum beyond the project funding 30 June 2015 Completed
- The exit steps, work plan, and sustainability strategy
- f CEDEP I M&E Component was already revised by
DICO/NIU. Relevant documents were submitted to EIF EF and UNOPS and approved on 28 September 2015. 2 In the run-up to the end phase of CEDEP I, it is recommended that the MIEs of CEDEP I to collaborate with the communication and M&E teams of DICO to take stock of project results, good practices and success stories and to share them with the EIF constituencies and
- ther stakeholders.
As soon as possible and no later than 2 months before the closing of the projects On-going
- A gentle reminder was made by the EIF DICO/M&E,
communication and MIEs team have work very closely together , as a result Newsletter volume 4 & 5 was completed, and success story of Milled Rice
- n 30 November and High Value Silk have been
produced on 15 May 2015.
- Stocktaking success story - EIF Tier 2- CEDEP I is
prepared and submitted to management for review and comments.
Implementation of ES/TFM Recommendations in May 2015 – 1/2
# Recommendation Timeline March 2016 Status 3 The MIEs should work closely with DICO and relevant line Ministries to strengthen the participation of core team in the implementation and M&E of CEDEP I. A clear TOR and shared workplan between core tam members and MIEs should be agreed upon. 30 June 2015 Completed
- During the 2nd EIF MIEs Quarterly meeting conducted on
23 June 2015, the ToR and participations of core team members in the project implementation have actively been encouraged to discuss among DICO and MIEs.
- As a results, MIEs and core team have been well
collaborated more often and core team often participated in training, meeting and events which supported by MIEs and DICO as a mean of capacity building and take stock of project implementation, results, achievements and impacts. 4 Due to the un-functioning of the Rice Programme Committee, it is recommended that IFC discusses with DICO to identify an appropriate national/sector governance structure which can review and approve the project implementation progresses and workplan and budget. 30 July 2015 Completed
- The issue has been discussed between DICO/NIU and IFC-
Milled Rice component, to promote the functioning of the Project Steering Committee (PSC).
- The last PSC of the Rice component organized on 15 Feb
2016 at the MoC.
No. Key Activities Remarks
1 EIF CEDEP I, Semi-Annual Report CEDEP I final evaluation CEDEP I Completion report Jan-June 2016 July 2016 Aug 2016 2 Core team participation in training/workshop and
- thers events/fairs with MIEs
Apr-Aug 2016 (TBC) 3 CEDEP Field visit study May-Aug 2016 (actual date and venue TBC based on management level availability) 4 CEDEP I last Dissemination Regional workshop 18 May 2016, SHV (tentative date subject to be changes) 5 CEDEP I, project formulation training (two training to be conducted) May-July 2016 6 CEDEP I, team building workshop June 016 7 Training and Mentoring on private sector development
- f CEDEP targets sectors
Apr-May 2016 (actual date TBC) 8 Core team to participate in local and international trade fair/event with IFC May-Aug (TBC by IFC) 9 Dissemination workshop for CEDEP I final evaluation result to DPs, MIEs and project beneficiaries Aug 2016 (TBC)
See t to attach ched t table
- 1a. Review of Implementation Progress Against Work Plan – 1/3
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT Outcomes/Outputs/Activities Status Progress as of March 2016 Remarks
Outcome #1: Strengthen the NIU’s capacity to monitor and evaluate progress made under Trade SWAp, including evaluating impacts and results of technical assistance
Output #1: A mid-term independent evaluation of the CEDEP II is organized and carried out
1.1 TOR for independent mid-term evaluation team developed Completed
- ToRs developed and shared with ES & TFM on 22 April 2015
1.2 Mid-term evaluation team identified and recruited (one international, one national) Completed
- An international consultant recruited and commenced the work
in February 2016 1.3 Draft report of mid-term evaluation team reviewed and commented Completed
- The draft report of MTE has submitted to DICO and key
stakeholders for review and comments on 29 Feb 2016.
- The preliminary findings meeting was organized on 23 March
2016. 1.4 Final mid-term report received On-going
- The final MTE report is expected to be available by the first week
- f Apr 2016
Output #2: A final independent evaluation of the CEDEP II is organized and carried out
Not Started
- 1a. Review of Implementation Progress Against Work Plan – 2/3
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT
Outcomes/Outputs/Activities Status Progress as of March 2016 Remarks
Outcome #2: Strengthening the NIU’s capacity to disseminate progress and results of technical assistance under Trade SWAp Output #1: Findings of project results and impacts are explained and disseminated twice a year for the regional workshops Not Started Output #2: Findings from Findings from evaluations (mid-term and final) are published and disseminated within Cambodia and to the international community Not Started Output 3: Management Function and Core Teams 3.1 M&E and communication training on Tier 2 and trade SWAp On-going
- A training focusing on PPP and Tourism was conducted on 12
Nov 2015 3.2 CEDEP II MIE quarterly meeting (L/O, Core team) On-going
- 2 meetings in 2015
- 1 meeting was arranged on 5 Jan 2016
3.3 Introductory and team building workshop for Core Team, MIEs and NIU Cancelled
- The activity was incorporated into the activity
3.2 above
- 1a. Review of Implementation Progress Against Work Plan - 3/3
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT
Outcomes/Outputs/Activities Status Progress as of March 2016 Remarks Output 3: Management Function and Core Teams (Cont.) 3.4 National M&E Expert full time On-going contract 3.5 FP, NIU and Core Team monitoring and evaluation of individual component delivery On-going
- 3 field visits have been conducted jointly with CEDEP I M&E
component in 2015. 3.6 Participation of core team members to MIE events overseas On-going
- 2 core members from MoC and MAFF attended the
Shanghai Starch Exhibition, from 23 to 26 June 2015- Cassava/UNDP 3.7 Operation Costs On-going See finance sections
- 1b. Review of Project’s Implementation Progress Against Log-frame – 1/4
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT Strategic Intervention KPIs Achievements as of March 2016
Impact #1 Enhancing the Government’s ability to lead and drive its Aid for Trade as a means to strengthen the effectiveness of the mainstreaming of Trade in its development policies and development of its institutions
- DICO is able to
manage an overall evaluation of Trade SWAp progress by 2016
- MoC /DICO has capacity to manage and lead MTP
formulation.
- MoC /DICO is also be able to participate in the monitoring
framework recently developed for all government ministries which led by MoP.
- MoC/DICO has ability to produce annual reports to the RGC
- n progress made in key trade development areas and every
2.5 years on the progress towards NSDP objectives. Management Function and Establishment of Core Teams NIU sets up a team of government
- fficials acting as CEDEP liaison
- fficers from various line Ministries
in one Core Team (CT) (five officials for each component total: 15
- fficials)
- Key M&E capacity
gaps have been identified
- NIU with the help of
M&E consultant provides quarterly report
- 14 core members from different line ministries were
identified to be part of the MIEs: 7 members for UNDP- Cassava component, 3 members for UNIDO-Marine Fisheries Products component, and 4 members for Shift 360-ACAC component.
- The role of CT members in providing the quarterly
implementation report to DICO M&E Unit that feed into DICO’s report on CEDEP II
- 1b. Review of Project’s Implementation Progress Against Log-frame – 2/4
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT Strategic Intervention KPIs Achievements as of Mach 2016 Outcome #1: Strengthen the NIU’s capacity to monitor and evaluate progress made under Trade SWAp, including evaluating impacts and results of technical assistance
- DICO able to prepare
templates and ToR for future Trade SWAp evaluation
- NIU able to advise on
relevance of benchmarks in the updated SWAp road maps DICO M&E team has continued to provide a regular update
- n all EIF project implementation during regular SWAp, SSC,
IC and MIE EIF meetings. The linkage between the M&E CEDEP II and the Trade SWAp result framework are developed and updated their progresses against KPIs in the annual narrative report 2015. The 2016-2020 MTP was endorsed. 5 out of 10 concept notes were developed while other 5 concept notes will be preparing by National Consultant hired by DICO in 2016. Output 1: A mid-term independent evaluation of CEDEP II is organized and carried out
- Mid-term independent
evaluation report completed
- Evaluation reports are
endorsed by NSC (SSC)
- The Mid-term Evaluation is being carried out and hopefully
that the MTE report will officially be completed in early April, and the final MTE report will be endorsed in the 25th SSC-TD-TRI meeting on 30 May 2016.
- 1b. Review of Project’s Implementation Progress Against Log-frame - 3/4
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT Strategic Intervention KPIs Achievements as of March 2016
Output 2: A final independent evaluation of CEDEP II is organized and carried out
- Final independent evaluation
report completed
- Evaluation reports are endorsed
by NSC (SSC)
- Not yet started
Outcome #2: Strengthening the NIU’s capacity to disseminate progress and results of technical assistance under Trade SWAp
- NIU able to organize
dissemination event for planned Trade SWAp evaluation Although the MTE report has not been produced, a number of activities has been implemented through a jointly organised with M&E CEDEP I to share project
- bjectives, scopes, and possible impacts of the project to
relevant stakeholders for both national and sub-national levels. A M&E and Communication training workshop focusing
- n PPP was organized to share project related
information, in particular to build capacity of key actors
- n M&E and communication.
- 1b. Review of Project’s Implementation Progress Against Log-frame – 4/4
EVALUATION FUNCTION AND ORGANIZATION OF A CORE TEAM COMPONENT Strategic Intervention KPIs Achievements as of March 2016
Output 1: Findings from monitoring of project results and impacts are explained and disseminated through regional workshops
- Number of regional
workshops organized to disseminate progress of CEDEP II Three regional workshops were jointly organized with M&E CEDEP I component in Ratanakiri, Battambang provinces for 2015 and Siem Reap for 2016. Output 2: Findings from evaluations are published and disseminated within Cambodia and to the international community
- Publications and number of
events organized to disseminate results of CEDEP II
- Not yet started
- 2. F
Financial Ma Manageme ment-Disb sburse sement o
- f Funds
EIF Tier 2 CEDEP II – M&E Component
- 1. Start date:
Aug 2014
- 2. Closing date:
Aug 2017
- 3. Total fund received:
75,000
- 4. Total fund disbursed:
29,667
As of 31 Dec, 2015
- 3a. Implementation of ES & TFM recommendations (May 2015) – 1/3
Tracking Action Plan against Recommendations
#
ES and TFM recommended actions (May, 2015)
Mar 2016 Status 1 The MIEs should work closely with DICO and relevant line Ministries to strengthen the participation of core team in the implementation and M&E of CEDEP II. A clear TOR and shared work plan between core team members and MIEs should be agreed upon. Completed
UNDP/Cassava component is being done The ToR of core team members and MIEs work plan (some MIEs) have been presented and shared during the 2nd MIE Quarterly meeting held on 23 June 2015. MoC/NIU organized a special meeting among key stakeholders (Shift 360 and core team member) to present project-related documents to core team members as well as discussed other related issues including collaboration and participation of core team members in the project implementation etc.
- 3a. Implementation of ES & TFM recommendations (May 2015) – 2/3
Tracking Action Plan against Recommendations
#
ES and TFM recommended actions (May, 2015)
Mar 2016 Status 2 Due to different starting time and implementation pace of each component, it is recommended that the timing and modality of Mid-term evaluation of CEDEP II should be further discussed and agreed upon between DICO, MIEs, ES and TFM. Completed The ToR was already finalized and agreed by all key stakeholders. The recruitment of consultants for the Mid-term evaluation was completed.
- 3a. Implementation of ES & TFM recommendations (May 2015) – 3/3
Tracking Action Plan against Recommendations
#
ES and TFM recommended actions (May, 2015)
Mar 2016 Status 3 It is recommended that UNIDO works closely with DICO and other implementing partners to speed up the implementation of the fishery component of CEDEP II. Project technical progress reports should be submitted timely to the Project Steering Committee for endorsement and subsequently to ES, TFM and DICO for review and clearance. On-going UNIDO had already submitted the narrative and financial reports directly from their HQ to EIF ES and UNOSP in June. The 2nd Project Steering Committee meeting was organized on 1st September 2015. The main objectives of the meeting were to seek the endorsement of narrative report, revised annual work plan, and presentation the findings of the related studies and assessments
- f the project.
Reporting & Coordinating Mechanism
Regularly collecting of information and data related to the project component through the Quarterly EIF CEDEP meeting and field visits; Sharing of information and engaging with all relevant MIEs and stakeholders (incl. core team, project beneficiaries and other development partners) for reporting and follow-up on implementation to all recommendations; Encouraging all key actors to share its project related information with DICO and other key stakeholders through Trade SWAp website and Facebook page Some core team members have faced time constraint to participate in project implementation (meetings, field visit, …etc) due to conflict schedules at own line ministries. Updating project progress, achievements, and results is one of the key challenges faced by DICO/NIU as each MIEs have its internal procedures and deadlines with EIF and UNOPS respectively.
- 6. Next Key Activities
Organising of the regional workshop for dissemination the monitoring results and evaluation report; Conducting of M&E and Communication Training on Tier 2 and Trade SWAp; Facilitation a core member from MoC, to attend the Study Tour to Bangladesh (Date to be confirmed). Marine Fisheries/UNIDO; Conducting of quarterly visits to each MIEs to discuss progress achieved and issues that could arise during the project implementation; Conducting of regular field visits to MIEs sites to meet with the project’s beneficiaries and key stakeholders; and Preparing Semi-Annual Technical Narrative Reports.
- Support the formulation of programme and project proposals to cover
the period 2016-2020
- Coordinate CEDEP III formulation consultation
- Support to DICO, EIF Core team and liaison officers in particular
providing training.
- Revise CEDEP II M&E component work plan and budget plan following
CEDEP II MTE report
- Support the implementation of CEDEP I and II projects
- Provide guidance to NIU M&E staff on implementation of Evaluation
Function components of CEDEP I and II
- Programme-level M&E and reporting
- Support to Cambodia delegation attending EIF SC meeting in Geneva
- Close the EIF Tier 1 project
No. Risks / Challenges Proposed Mitigation Solution 1 Core team lack of their own commitments toward the project, information and progress of the project due to their heavy work load Core team to follow-up more closely with the project implementation by MIEs 2 Lack of cooperation between MIEs and core team MIEs, M&E DICO and Core team to strengthen their cooperation within the project implementation, dissemination and progress 3 DICO and core team capacity building needed within the project arears MIEs to take action on providing capacity building to core team and DICO team
Evaluati tion
- n M
Method
- dol
- log
- gy
- Evaluation Inception Report outlined methodology, schedule and
participants
- Separate Guidelines were developed for KII/FGD with
Implementers/Partners and Beneficiaries.
All information requested was related to DAC criteria, timeliness and
- wnership.
- Collection of data in the field undertaken over three weeks between 8th-
29th February.
- KII and FGD with MIE’s, Stakeholders, Board Members and PSC, Core
Teams, Donors (SIDA, EU and WB), Direct beneficiaries (Cassava and Marine Fisheries), UNOPS. Meeting schedules assisted by MIE’s.
- Meetings held in Phnom Penh, Kampot, Kampong Som, Battambang and
Pailin.
- An ongoing participatory process until the compilation of final report.
Will also input comments from MIEs and ES and from EIF Mission.
Preliminary M Main F Findings gs (DAC):
- Relevance: Highly Satisfactory. Relevant to RGC priorities (The RGC’s RSIII and the National
Strategic Development Plan (NSDP) place PSD and trade at the center of the reform agenda). Highly relevant to donor frameworks, UN and Shift 360 mandates. Relevance stressed by beneficiaries and all stakeholders to MTE.
- Efficiency: Moderately Satisfactory when compared against plan with low current
disbursement and slow start up of activities. However, MIEs are accelerating progress (UNIDO around 50%). MIEs are well chosen technical implementers. Generally cost effective interventions offering opportunities for up scaling and lessons learned. Measurement against
- Govt. indicators (e.g the KPIs), EIF recommendations (however not all implemented) and LFs
enhances efficiency.
- Effectiveness: Satisfactory and enhanced by working with other TRTA e.g TDSP and other UN
projects/frameworks. A generally solid programme document helpful. Ultimately , however whether the activities will achieve a pro poor outcome is not measurable yet.
- Potential Impact: Highly Satisfactory. If delivered outcomes will contribute to MDGs through
skills development, labour intensive employment diversification and improving relationships/experience between public and private sectors. Better measurement of actual impact on poverty and export diversification needed. Too early to measure any actual impact (especially for ACAC).
- Sustainability: Moderately Unsatisfactory (at the time of the MTE). It will be a challenge to
complete all the remaining activities on time. Regulatory frameworks will ultimately need developing and this will take time. Especially for UNIDO and UNDP regarding any higher level policy and institutional development and for DICO regarding the maintenance of HR capacity with the end of EIF 1
CE CEDE DEP I II Ac Achievements b s by 29 F Feb eb 2 2016
(Measured by output only)
1 2 3 6 5 6 3 5 1 5 1 1 2 3 4 5 6 7
Cassava Fisheries ACAC M&E
Complete Ongoing Not Commenced
Set of recommendations issued to DICO (MIE):
- The CEDEP II M&E component should revise the work and budget plans so as to ensure continued
support to the CEDEP II M&E component from existing national and international consultants within EIF 1 project which is ending.
- This is line with DICO and MOC request to EIF in December 2015 to maintain EIF team, using CEDEP I and II
available budget, to ensure EIF continued relevance in Cambodia
- This support could also take the form of preparing sustainability strategies for the CEDEP Programme,
the CEDEP II project and look into up-scaling of project results or formulating continuation project to be considered under the MTP 2016-2020.
- Continue work to link Component outcomes from Logical Frameworks match CTIS outcomes.
- Consider revising project timelines and updating the programme LF to reflect slow commencement of
some components.
Recomme mmendations
Set of recommendations issued to RGC: Set of recommendations issued to MoC: Set of recommendations issued to each MIEs:
- Developed annually by DICO, approved annually by ES and TFM
- Encompasses training sponsored by EIF, TDSP and MoC own resources
- Tracked every quarters
- Includes soft and hard skill training
No. Description Beneficiaries (number) % of female participants 1 Domestic training: English, Project management and M&E, 21 35 2 M&E and Communication 40 25 3 Communication for EIF and TDSP Programs 59 30 4 Financial Management for EU Grants in Bangkok, Thailand, 31 August - 02 September 2015. 2 5 Contract Administration in Kuala Lumpur, Malaysia, 25-28 October 2015 2 50
No. Date Conducted Title/ Topics Location/ Venue Total Participants
1 15-16 January 2015 M&E and Communication training Sieam Reap Province, Impress Angkor Hotel 45 2 12-13 February 2015 Communication training Kep Province, Rock Royal Hotel 65 3 28 May 2015 Dissemination Regional workshop on: Trade SWAp, EIF CEDEP I&II Project finding, Monitoring and Evaluation, Results and Impacts Rattanakiri Province, Rattanak City Hotel 74 4 4-6 June 2015 Milled Rice core team participated in The 9th China (Guangzhou) International High Quality Rice and Brand Grains Exhibition 2015 Guangzhou, China 2 5 11-June 2015 Participated in training, provided by UNDP on Project Management UNDP building5, BKK, PP 10 6 23-June 2015 Q2 meeting with MIEs MoC 31 7 20-23 July 2015 First Stakeholder Consultation Workshop for Silk Sector Strategy Updated MoC 40
No. Date Conducted Title/ Topics Location/ Venue Total Participants
8 24-26 Aug 2015 Join field visit (CEDEP I&II) to Silk, Rice and Cassava beneficiary Siem Reap province 10 9 27 Aug 2015 CEDEP I Regional workshop Battambang province 67 10 4 Sep 2015 Training provided by IFC team (to rice core team) on the aspect of rice project implementation IFC office, PP Tower Level 5 4 11 28-30 Oct 2015 Rice core team participated in the 7th TRT World Rice Conference
Kl Malaysia 2
12 6 Nov 2015 Contract farming and its application workshop, Pailin province Commerce Department, Pailin province 92 13 1 Dec 2015 Silk core team join ITC field trip to Takeo to update
- n silk beneficiary progress and achievement
Takeo province 17 14 2-3 Dec 2015 Second Stakeholders validation workshop on Silk Sector Strategy workshop MoC 45 15 15 Dec 2015 Silk project dissemination workshop on results, progress and achievement Frangipani Hotel, PP 25
No. Date Conducted Title/ Topics Location/ Venue Total Participants
16 25 Jan 2016 Rice core team joint the 5th Cambodia Rice Forum Sokha Hotel, PP More than 100 17 26 Jan 2016 Field visit to silk beneficiary in Prey Veng , to up date
- n progress and improvement within the project
support Prey Veng province 21 18 4 Feb 2016 M&E training provided by DICO M&E consultant team (TDSP & CEDEP I&II) to DICO NIU team DICO, MoC 10 19 26 Feb 2016 3rd Dissemination Regional workshop on: Trade SWAp, EIF CEDEP I Project finding, Monitoring and Evaluation, Results and Impacts Angkor Paradise Hotel, SR province 70 20 29 Feb-2 March 2016 Join field visit of CEDEP I&II to rice and cassava project beneficiaries Tbong Kmoum and Kampong Cham province 21 21 18 March 2016 Launching of Silk Sector Strategy (updated version) Raffles Hotel, PP 120
Post Q1 2016 Challenges
- 1. Maintaining EIF programme support challenging following Tier 1
completion: need continued substantive advisory support
- 2. Seeking continued support on rice and silk from core team even in
absence of project components / sector intervention
- 3. Formulating follow-up or scaling up assistance projects
- 4. Gaps between Tier 1, CEDEP I and new Trust Fund / Bilateral
projects or loans
- 5. Uncertainty surrounding support from EIF ES in Phase 2 (lack of
funding, focus only on new EIF members / Tier 1 projects)
Required by EIF ES Aligned with SWAp and MTP Bridging the gap with and building solid foundations for next 5-year AFT cycle
- 1. To design strategies and action plans to further enhance the National
Implementation Unit’s capacity in formulating, implementing, managing, and monitoring trade-related technical assistance programs.
- 2. To adopt an institutional set up within DICO that will enable the
continuous operation of the NIU beyond Tier 1 and Tier 2.
- 3. To identify appropriate strategies to close each project component in
- rder to maintain the benefits that have been achieved.
- 4. To provide a Road Map to guide DICO and the development partners to
work on sustainability efforts, specifically on the continuation of project activities beyond the EIF program period.
- 5. To help identify the necessary resources to sustain various successful
projects, encourage the development of partnerships and support collaboration
- 1. NIU support to overall EIF programme implementation weaker without
dedicated consultant support and core team participation
- 2. As Cambodia develops, new financing mechanisms are offered with little
experience/knowledge within MOC (grants, PPP, private sector funding)
- 3. Lack of clarity, transparency and communication on EIF Phase 2, eg new
project templates, Tier 1 follow-up project, regional capacity building, CEDEP III (in the case of Cambodia)
- 4. NIU Cambodia at the forefront of new initiatives (Roadmaps, MTP, LDC
graduation, exchange programme, PPP) but how to share those with other LDCs and learn from them: -> avoid centralization of decisions in EIF ES
The purpose of the Medium Term Plan is to take stock of the progress of implementation of Cambodia’s Trade SWAp Roadmap 2014-2018, review areas already receiving technical support, and identify and prioritize areas where additional technical assistance is necessary for advancing the implementation of the Roadmap in the next five years (2016-2020)
- First, assessing Cambodia’s progress in implementing the outcomes and specific indicative actions outlined
in the Trade SWAp Roadmap 2014-2018.
- Second, prioritizing clusters of activities for furthering the implementation of the Trade SWAp Roadmap
(ten priority cluster identified for future technical assistance by the technical team and prioritized them for purposes of immediate resource mobilization.
- Third formulating cluster concept notes for the top five clusters to allow DICO and relevant stakeholders to
engage with partners on program formulation and resource mobilization.
- Fourth, completing five additional concept notes to cover the remaining five clusters following completion.
# of Actions % of Total Status of Work No Work 56 42% Work under way 74 55% Completed 4 3% Total 130 100% Status of TA Not needed 31 23% Ongoing 62 46% TA needed 41 31% Total 130 100%
- 1. Trade Policy, Sector Policy, Legal and Regulatory Reform: Formulate Trade Policy in view of AEC, RCEP, TPP and erosion of preferences including RoOs; develop
sector policies (e.g. cassava, fish, rubber, others); identify sector-specific NTMs; implement the Government’s 2012-2015 Work Program on Legal Reform, including key reforms identified in the Trade SWAp Road Map 2014-2018.
- 2. Trade Facilitation and Transport Logistics: Establish the NSW including automation of trade related documents; respond to the Bali Agreement on Trade
Facilitation; develop, adopt, implement a national transportation logistics plan; improve cross-border transit agreements; improve and enforce road transport regulations; encourage modernization of road transport fleet.
- 3. SPS and Other Quality Systems for Trade: Complete key legal reforms in SPS; develop capacity of key agencies not only in Phnom Penh but in field offices as well
especially in areas of surveillance and inspections; promote a culture of SPS including through encouraging agro exporters to adopt SPS standards required by importing markets, develop various quality systems to support export sectors (e.g. rubber, silk.)
- 4. Private Sector Structuring: Strengthen sector associations and private sector in rice, cassava, fisheries, rubber, and hospitality including ability of sectors to
articulate positions and engage government through G-PSF or other venues; strengthen and promote branding through sector-specific collective marks, GIs, Quality Seals, other means as well as through “Made in Cambodia” branding; strengthen export promotion capacity including through capacity building in sector associations.
- 5. Development of Inclusive Value Chains: Build capacity of priority export sectors identified by Government in the Trade SWAp Road Map 2014, including in light
manufacturing, agro-processing, rubber and tourism.
- 6. Trade Mainstreaming and Management of Aid for Trade: Continue to build capacity for monitoring and communicating Trade SWAp as a program instead of a
collection of projects; continue to mobilize and coordinate AFT support; strengthen capacity of MoC and other line ministries to participate in SWAp; improve fiduciary management of AFT projects using different disbursement modalities. Deepen trade build trade-related training and research capacity in Government;
- 7. Skills for Exports: Address the lack of skilled technical personnel as a result of the absence of a robust TVET structure is a serious bottleneck in Cambodia’s ability
to move up value chains; address the lack of well-trained engineers (mechanical, structural, agricultural, chemical, biologist, etc.); strengthen collective bargaining environment and dispute resolution mechanisms.
- 8. Investment Environment, Integration in Regional Value Chains, Backward Linkages: Complete supportive legal framework including encouraging
development/deepening of backward linkages in garment, bicycles, footwear, hospitality (horticulture); diversify investment in regional and global value chains beyond garment, footwear and bicycles; develop investment promotion capacity including at provincial level.
- 9. Rural Development for Exports including Extension Services, Cooperatives Development, Surveillance Services: Develop structured value chains between farmers
and semi-agro-processors or agro-processors through farmers groups, cooperatives, contract farming arrangements, etc; strengthen quality of seeds, seedling, and other plantings; 10.Access to Finance: Address the lack of access to working capital and trade finance especially for SMEs and other small producers/exporters as it is a significant constraint to export development.
Cluster 1: Trade policy, sector policy and legal and regulatory reform Cluster strategic objectives Trade SWAp Roadmap Outcomes
- 1. Complete trade-related key legal and
regulatory reforms Outcome 1: Trade policy, legal reform and trade negotiations
- 2. Strengthening implementation of trade-related
laws and regulations through strengthening of implementation and enforcement capacity of relevant line ministries and agencies Outcome 6: Establishing a trade-supportive framework for intellectual property rights
- 3. Formulate a trade policy 2015-2025 to guide
Cambodian negotiators Outcome 1: Trade policy, legal reform and trade negotiations
- 4. Develop sector policies based on value chain
analytical work Outcome 18: Mainstreaming trade Start-up projects (Low-hanging fruits) 1) Accelerate implementation of the work program on legal reform 2012-2015 2) Analyze non-tariff measures included in the National Trade Repository 3) Strengthen enforcement of geographical indications 4) Formulate a trade policy Estimated resource needs (2016-2020) USD 4-5 million
Cluster 2: Trade facilitation and Transport logistics Cluster strategic objectives Trade SWAp Roadmap Outcomes
- 1. Implement Cambodia National Single Window
(NSW) Outcome 2: Trade facilitation
- 2. Formulate and Implement National Trade Logistics
Plan Outcome 3: Trade logistics
- 3. Implement ATIGA and the WTO Trade Facilitation
Agreement (“Bali Package”) Outcome 2: Trade facilitation Outcome 1: Trade policy, legal reform and trade negotiations Start-up projects
1)
Review Arrangements among Cambodian Border Agencies and with Vietnamese and Thai Counterparts Agencies to Create Shared Border Point Offices/Facilities at Key Crossings
2)
Assessment of Other Trade-Facilitation-related Documents not yet Computerized
3)
Support Initial Work on National Trade Logistics Plan
4)
Institutional Arrangements and Assistance Modalities for TFA Implementation in Cambodia Estimated resource needs (2016-2020) USD 5 million
Cluster 3: SPS and other Quality Systems for Trade Cluster strategic objectives Trade SWAp Roadmap Outcomes 1. Establish a coherent WTO- and ASEAN-compatible legal and regulatory framework for SPS and other quality systems Outcome 4: Strengthened capacity of exporters to meet technical standards and SPS requirements. 2. Enhance systems and structures to develop adoption of SPS standards and practices throughout the entire food value chain from “farm-to-fork”, including strengthening SPS practices at farm, producer, and retailer levels Outcome 4: Strengthened capacity of exporters to meet technical standards and SPS requirements. 3. Achieve international accreditation of Cambodian laboratories for relevant parameters Outcome 4: Strengthened capacity of exporters to meet technical standards and SPS requirements. Outcome 17: Bridging the skill gap for exports. Start-up projects
1.
Amend and adopt a WTO-compliant Law on Standards
2.
Complete drafting of Food law and assemble group of experts to eliminate contradictions and lack of coherence in current SPS framework.
3.
Adopt 250 or ASEAN harmonized standards not yet adopted by Cambodia Estimated resource needs (2016-2020) USD 5-7 million
Cluster 4: Private Sector structuring Cluster strategic objectives Trade SWAp Roadmap Outcomes 1. Private sector Associations are able to articulate positions and dialogue with Government through the G-PSF or other venues Outcome 10: Processed food. Outcome 12: Milled rice. Outcome 13: Cassava. Outcome 14: Rubber. Outcome 16: High value silk. 2. The private sector and Government develop PPP arrangements to narrow the labor skill gap, invest in common facilities, or support other investment in “public goods” Outcome 7: Garments. Outcome 9A: SEZ. Outcome 15: Tourism. 3. The private sector increases capacity in marketing, promotion and branding for exports Outcome 7: Garments. Outcome 8: Footwear. Outcome 10: Processed food. Outcome 12: Milled rice. 4. The private sector is able to meet international SPS and other quality standards Outcome 4: Strengthened capacity of exporters to meet technical standards and SPS requirements. Outcome 7: Garments. Outcome 14: Rubber. Outcome 17: Skill gap Start-up projects
1.
Develop culture of professions in Tourism
2.
Develop/strengthen collective branding in High-value fragrant rice, garments, and high-value silk. Estimated resource needs (2016-2020) USD 5-6 million
Cluster 5: Development of inclusive export value chains Cluster strategic objectives Trade SWAp Roadmap Outcomes
- 1. Develop export capacity in priority sectors identified
by the Government, beginning with the priority sectors identified in CTIS 2014-2018 and the 2015 Industrial Development Policy Outcome 9B: Light manufacturing assembly. Outcome 10: Processed food. Outcome 12: Milled rice. Outcome 13: Cassava. Outcome 16: High value silk products
- 2. Develop a business and investment environment
supportive of the development of Inclusive Value Chains including through deepening backward linkages Outcome 5: Investment environment for exports. Outcome 9A: SEZ. Start-up projects
1.
Prepare Draft Project Document(s) for Submission to EIF or Other Interested Development Partners.
2.
Support Implementation of Laws on Investment and SEZ once adopted.
3.
Develop Relevant Investment Promotion Tools to Attract New Investment in Key Priority Export Value Chains Estimated resource needs (2016-2020) USD 5-7 million
No. Description Estimated budget Cluster 1 Trade policy, sector policy and legal and regulatory reform USD 4-5 million Cluster 2 Trade facilitation and Transport logistics USD 5 million Cluster 3 SPS and other Quality Systems for Trade USD 5-7 million Cluster 4 Private Sector structuring USD 5-6 million Cluster 5 Development of inclusive export value chains USD 5-7 million TOTAL USD 24-30 million
Cluster DPs Line Ministries 1 Trade Policy, Sector Policy, Legal and Regulatory Reform EU, GIZ MoC 2 Trade Facilitation and Transport Logistics EU, WB, USAid WB/GDCE 3 SPS and Other Quality Systems for Trade EU, UNIDO MAFF/MoC 4 Private Sector Structuring ADB MIH/MoC 5 Development of Inclusive Value Chains EU, ESCAP, IFAD, CBI MoC/MAFF 6 Trade Mainstreaming and Management of Aid for Trade EIF, EU MoC 7 Skills for Exports SIDA, AFD, CBI MOLVT/MOC 8 Investment Environment, Integration in Regional Value Chains, Backward Linkages JICA, EU, GIZ CDC 9 Rural Development for Exports including Extension Services, Cooperatives Development, Surveillance Services IFAD MAFF 10 Access to Finance ADB MEF
Next step: resource mobilization MOC-DP Pledging Roundtable March 31, 2016
Timetable for SSC-TD-TRI Meeting in 2016 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec SSC Thu 25 SSC Mon 30 SSC Wed 31 SSC Tue 29 Timetable for IC Meeting in 2016 IC Mon 11 IC Thu 11 IC Tue 15 IC Thu 21 IC Wed 11 IC Tue 14 IC Tue 12 IC Thu 11 IC Tue 13 IC Wed 12 IC Thu 10 IC Tue 13 Timetable for DICO and IAs Meeting in 2016 Mod 07 Tue 05 Wed 04 Timetable for D/ICO and Line Ministries Meeting in 2016 (Under EIF) Wed 06 Tue 10 Mon 05 Thu 08
្លកសួងពិណ ិ ជកម និយកដ នសហ្លតិបតិករអនរជិតិ
អស័យដ ន: ឡូត៌េលខ ១៩-៦១ វិថី្លកសួងពណ ិ ជកម (១១៣េប), ភូមិទឹកថិ , សង ត់ទឹកថិ , ខ័ណ ែសនសុខ, រជធិនីភំេពញ ១២១០២ ទូរស័ព/ទូរសរៈ ០២៣-៨៦៦-០៧៤
Email: chhiengpich@gmail.com www.moc.gov.kh | www.moc.gov.kh/tradeswap Ministry of Commerce Department of International Cooperation Lot 19-61, MoC Road (113B) Phum Teuk Thla, Sangkat Teuk Thla Khan Sen Sok, Phnom Penh 12102 Cambodia Tel/Fax: 023-866-074 Email: chhiengpich@gmail.com www.moc.gov.kh | www.moc.gov.kh/tradeswap