ECSEL CALLS 2018 YVES GIGASE CALLS 2018 Results will be - - PowerPoint PPT Presentation

ecsel calls 2018
SMART_READER_LITE
LIVE PREVIEW

ECSEL CALLS 2018 YVES GIGASE CALLS 2018 Results will be - - PowerPoint PPT Presentation

ECSEL CALLS 2018 YVES GIGASE CALLS 2018 Results will be communicated next week Always remember... Rumors are carried by haters, spread by fools, and accepted by idiots. Serenity ECSEL PROJECTS YVES GIGASE ECSEL A UNIQUE FUNDING


slide-1
SLIDE 1

ECSEL CALLS 2018

YVES GIGASE

slide-2
SLIDE 2

CALLS 2018

  • Results will be communicated next week
  • Always remember... Rumors are carried by haters, spread by fools,

and accepted by idiots.

  • Serenity
slide-3
SLIDE 3

ECSEL PROJECTS

YVES GIGASE

slide-4
SLIDE 4

ECSEL A UNIQUE FUNDING MECHANISM

Averages 1: National programmes 22% 2: ESI funding 1% 3: EU Budget H2020 24% 4: Own contribution 53%

Based on 2016-2017 selected projects

FP7/H2020 Calls

Contractual PPPs

EUREKA Clusters National Programmes

Member States

JTIs /JUs

Public companies Companies (large and small) Universities, RTOs,…

Regions

Smart Specialization ESIF/ERDF

1 2 3 4 > 1.17B€ 1.17B € > 1.6B€

slide-5
SLIDE 5

ECSEL: NETWORKS OF PARTNERS AND PROJECTS

CPS platform developments More Moore T echnology Silicon on Insulator T echnology Other Components MtM IC-T echnology MtM pilot lines for ISS Digitalisation of Industry CPS with mixed HW/SW developments Integrated Smart Systems Platforms for Cyber Physical Systems

slide-6
SLIDE 6

NETWORKS OF PROJECTS

Cybercars 2 DESERVE 3CCAR ADOS ENABLE-S3 SafeAdapt

AUTODRIVE

CESAR UDRIVE CRYSTAL ARTEMIS PEGASUS RobustSENSE SVA MBAT DRIVE C2X E3CAR MotorBrain BATTMAN eDAS ReVAS MOBINET TEAM VRUITS PANAMA ADEPT IoE CASTOR EMC2 POLLUX Demanes

ECSEL

OTHER OTHER ARTEMIS ENIAC

slide-7
SLIDE 7

18 Projects 435 Participants

15 15 3 9 58 10 12 15 109 5 3 87 4 7 33 6 2 4 6 7 5

IL

1 7 12

Partners per country Projects with same coordinator (*) supporting clusters all over Europe

(*) coordinator is ST located in France

TOGETHER!

slide-8
SLIDE 8

SM E … LE 7… Othe r …

ENTITIES PARTICIPATING TO AT LEAST ONE ECSEL CALL

38% of the SME entities participated

more than once in an ECSEL call

49% of the SME entities participate

in at least one SELECTED project

50% funding for the SME’s

✓ Ease of participating to an ECSEL project ✓ First steps ✓ Enlarging the environment for the SME ✓ SME help the project in focussing, bringing in their experience

SME PARTICIPANTS

slide-9
SLIDE 9

ECSEL PROJECTS

  • Has a centre of gravity of selected projects around larger pan European

projects (30+ partners from 10+ ECSEL Participating States this includes Israel, Norway, Turkey, Switzerland) ,

  • Addresses
  • IA- call: higher Technology Readiness Levels (TRLs 5-8) like pilot lines,

pilot innovation projects, demonstrators, test beds, full scale testing, …

  • RIA-call: lower TRLs (3-4) executed by an industrial consortium,

innovation, demonstrators in realistic environment, deployment plan showing the valorisation for the ECS ecosystem

  • BUT does not preclude smaller projects focusing on topics with strong

industrial support or projects with a non-industrial coordinator.

slide-10
SLIDE 10

 Funding rates  National eligibility and national funding rates  Page limits  Various thresholds!  Various caps  Etc.  Read the Work Plan carefully!!!

DIFFERENCES WITH OTHER H2020 CALLS

IA Funding rates LE / SME / OTHER: 20% / 25% / 35% RIA Funding rates LE / SME / OTHER: 25% / 30% / 35%

slide-11
SLIDE 11

ECSEL CALLS 2019

YVES GIGASE

slide-12
SLIDE 12

PLANNING CALL 2019 Something along the lines of 2018:

 Call 2018-1 Innovation Action  Call 2018-2 Research and Innovation action

Part A: All Grand Challenges except “Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters”

Part B: Grand Challenge “Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters”  Call 2018-3 Coordination and Support Action for the Lighthouse Initiative Industry4.E  Call 2018-4 Coordination and Support Action for the Lighthouse Initiative Mobility.E  T

wo procurement studies

slide-13
SLIDE 13

CALL 2019 PLANNING

BROKERAGE EVENT 15-16 January Call 2019 Launch 06/02/2019 Call 2019 PO Deadline 07/05/2019 Call 2019 FPP Deadline 18/09/2019 Call 2019 Selection decision 19/11/2019