East Bay Bus Rapid Transit Project Project Design Workshops November 2012 1 Todays Meeting Introductory Presentation Project Overview Station Architecture Public Art Strategy Landscape Architecture Station Access


slide-1
SLIDE 1

East Bay Bus Rapid Transit Project

Project Design Workshops

November 2012

1 ¡

slide-2
SLIDE 2

Today’s Meeting

  • Introductory Presentation

– Project Overview – Station Architecture – Public Art Strategy – Landscape Architecture – Station Access and Wayfinding – Next Steps

  • Open House Discussion

– We want your input!

2 ¡

slide-3
SLIDE 3

East Bay Bus Rapid Transit Project

Downtown Oakland to Downtown San Leandro

3 ¡

  • 9.5 miles in Oakland and San

Leandro

  • Same fare as local service
  • Faster, more reliable services
  • Dedicated bus lanes for 81% of

corridor

  • ~$174 Million capital investment
slide-4
SLIDE 4

4 ¡

BRT Provides Rail-Like Experience

Off-bus fare payment Eliminate hassles and delays at farebox Shelter, seating Provide comfortable place to wait Real-time arrival signs Reduce waiting anxiety Cameras, lighting Provide safety and security at stations

slide-5
SLIDE 5

5 ¡

BRT Provides Fast, Reliable Transit Service

Bus lanes Remove interference from traffic Traffic signal priority Reduce delays at signals Level boarding Quicker and easier to get on and off the bus Station spacing Maintain higher speed

  • ver longer stretches
slide-6
SLIDE 6

Improve Public Safety & Access

  • Emergency response vehicles in bus lane
  • Better lighting and visibility
  • New traffic and pedestrian signals
  • Pedestrian scale lighting
  • ADA Best Practices
  • Safer crosswalks
  • Safety cameras
  • New bike lanes per

City Plan

6 ¡

slide-7
SLIDE 7

Project Schedule

7 ¡

2013

  • Confirm project features

2014

  • Complete engineering

2014-2016

  • Construction

2016

  • Open for service
slide-8
SLIDE 8

Downtown Today 11th Street @ Harrison Street - simulation

8 ¡

slide-9
SLIDE 9

Downtown 11th Street @ Harrison Street - simulation

9 ¡

slide-10
SLIDE 10

Fruitvale Today ¡ ¡ International Blvd. @ 34th Ave.

10 ¡

slide-11
SLIDE 11

Fruitvale ¡ ¡ International Blvd. @ 34th Ave.- simulation

11 ¡

slide-12
SLIDE 12

Elmhurst Today ¡ ¡

International Blvd. @ 82nd Ave.

12 ¡ 95th Ave 86th Ave 90th Ave 103rd Ave

slide-13
SLIDE 13
  • Developed with the community
  • Proven in other communities and

Elmhurst ¡ ¡

International Blvd. @ 82nd Ave.- simulation

13 ¡ 95th Ave 86th Ave 90th Ave 103rd Ave

slide-14
SLIDE 14

San Leandro Today Interna(onal ¡Blvd. ¡@ ¡Durant ¡Ave. ¡

14 ¡

slide-15
SLIDE 15

San Leandro Interna(onal ¡Blvd. ¡@ ¡Durant ¡Ave. ¡

15 ¡

slide-16
SLIDE 16

Architectural Goals

Industrial ¡Modern ¡

  • ¡ ¡Passenger ¡Safety ¡
  • ¡ ¡Passenger ¡Comfort ¡
  • ¡ ¡Accessibility ¡
  • ¡ ¡Code ¡Compliance ¡
  • ¡ ¡Durability ¡
  • ¡ ¡IdenEficaEon ¡
  • ¡ ¡CustomizaEon ¡
  • ¡ ¡Art ¡Opportunity ¡

16 ¡

slide-17
SLIDE 17

Median Station Concept

17 ¡

slide-18
SLIDE 18

Median Station Concept

18 ¡

slide-19
SLIDE 19

Side Station Concept

19 ¡

slide-20
SLIDE 20

Kit-of-Parts

Industrial ¡Modern ¡

Handrails ¡ Sea(ng ¡

¡ ¡Pla9orm ¡Surface ¡

Canopy ¡Glazing ¡ Plan(ng ¡ Screens ¡

20 ¡

slide-21
SLIDE 21

Public Art Strategy

21 ¡

  • Enlivens our civic life
  • Celebrates the unique character of
  • ur communities
  • Public art concept integrated with

proposed Kit-of-Parts

  • Art enhancement at most stations
  • Fair, equitable and competitive artist

selection process

  • Opportunities for local artists
slide-22
SLIDE 22

Kit-of-Parts Possibilities

Industrial ¡Modern ¡

Handrails* ¡ Sea(ng* ¡ Pla9orm ¡ ¡ Surface* ¡ Canopy ¡ Glazing* ¡ Plan(ng ¡ Screens* ¡ (* ¡Art ¡Opportunity) ¡

22 ¡

slide-23
SLIDE 23

BRT Landscape Architecture

  • Station Landscaping

– Part of East Bay BRT’s visual identity – Included in “kit of parts” for Median & Curbside Stations – Contributes to comfortable & attractive station environment – Uses drought tolerant plants

  • Median Landscaping beyond Stations

– Enhances general streetscape – Part of overall corridor identity

23 ¡

slide-24
SLIDE 24

BRT Station Landscaping Examples

Bookend ¡ Hipped ¡Roof ¡

24 ¡

slide-25
SLIDE 25

Station Landscaping Concepts

  • Curbside Station

25 ¡

Sta$on ¡“Iden$ty” ¡Trees ¡ Sta$on ¡Accent ¡Plan$ng ¡ “Green ¡Fence” ¡ along ¡back ¡of ¡pla<orm ¡

slide-26
SLIDE 26

Station Landscaping Concepts

  • Median Station

26 ¡

Sta$on ¡“Iden$ty” ¡Trees ¡ Sta$on ¡Accent ¡Plan$ng ¡ in ¡raised ¡planter ¡ Direc$onal ¡Signage ¡

slide-27
SLIDE 27

Medians beyond Stations

  • BRT Project:

– Preserves and restores medians on International between 81st to 100th Avenue – Maintains and restores median at Fruitvale BART – Adds new medians where included in the project design (landscape or paving) – Uses drought tolerant and low maintenance plant material

27 ¡

slide-28
SLIDE 28

Station Access Crossings

28 ¡

Median ¡Sta(on ¡

  • Crosswalk Design at BRT Median and Curbside Stations

– Part of East Bay BRT’s identity – Follows ADA Best Practices and includes audible signals

Applies ¡to ¡all ¡four ¡crosswalks ¡at ¡a ¡BRT ¡Sta(ons ¡ Curbside ¡Sta(on ¡

slide-29
SLIDE 29

Enhanced Mid-Block Crossings

29 ¡

  • Mid-block Crosswalk Design

– Includes enhanced pedestrian refuge – Allows passage of Emergency Vehicles – Includes high visibility striping and other pedestrian safety features

Enhanced ¡Pedestrian ¡Refuge ¡ High-­‑visibility ¡Crosswalk ¡ Bulbouts ¡where ¡included ¡in ¡ the ¡BRT ¡Design ¡ Median ¡Crossing ¡for ¡ Emergency ¡Vehicles ¡

slide-30
SLIDE 30

Directional and Wayfinding Signage

30 ¡

  • Modeled after existing Regional Signage Program
  • Provided:
  • Maps combine Wayfinding & Transit Information
  • In addition to real-time “Next Bus” Information
  • at stations
  • to and from connecting transit routes
  • in some key locations between stations

¡

slide-31
SLIDE 31

We Want Your Feedback!

  • Talk now with AC Transit and the Project Team and

give your input

  • Additional input opportunities on Kit-of-Parts and

Public Art in early 2013

31 ¡

  • Materials posted to www.actransit.org

– Follow front page link – Download a comment form or email brt@actransit.org with your thoughts