Dune Grounding Issues Impedance Concerns
- T. Shaw
Dune Grounding Issues Impedance Concerns T. Shaw 11APR2018 - - PowerPoint PPT Presentation
Dune Grounding Issues Impedance Concerns T. Shaw 11APR2018 Detector Ground Isolation 2 10APR2018 Cryostat Slab and Final Design Intermediate small test structure For Discussion - Small scale tests of detector ground isolation - Is it
10APR2018 Cryostat Slab and Final Design 2
drift area?
bonded to the “building” reference must be available for us to hook-up to.
final pad) must be placed on dry drift floor.
top of the new concrete pad.
detector block.
10APR2018 Cryostat Slab and Final Design 3