DUNE Electrical Review Guidelines Theresa Shaw DUNE Technical Board Meeting November 7, 2018 Expectations of review materials for electrical aspects of a project Guidance document in DUNE DocDB 11269 This is a general list to be


  1. DUNE Electrical Review Guidelines Theresa Shaw DUNE Technical Board Meeting November 7, 2018

  2. Expectations of review materials for electrical aspects of a project • Guidance document in DUNE DocDB 11269 • This is a general list to be tailored to each subsystem being reviewed. • The sooner material is presented in the design process, the easier it will be to spot any issues requiring corrective issues. • Much of the material may be ready for review at the 60% review, all of relevant material must be ready prior to a pre-production review. 2 11/8/2018 T. Shaw

  3. Electrical Review • System Level Diagram and Grounding plan - System Level block diagram including grounding scheme • Printed Circuit Boards - Schematic - Bill of Material - Board Layout Files - Specified electrical tests to be done by manufacturer on Printed Circuit Board - Specified tolerances given to manufacturers - Desirable – native board files 3 11/8/2018 T. Shaw

  4. Electrical Review • Mechanical/Electrical - Pressfit pins – documentation showing how manufacturer specifications are fulfilled in the design of the printed circuit board - Verify soldering temperature profiles met - Plans to verify board assembly process (visual, AOI, x-ray) - Cable Strain relief - Any Pressure specifications (i.e, Flange boards) - Qualifications of board glue joints • Electrical Interfaces - Connector pinout information of BOTH mating ends of board/cable, cable/cable, or board/board 4 11/8/2018 T. Shaw

  5. Electrical Review • Power - One Line Drawing(s) – Show Connectors, pinouts, cables, and current ratings – include (specifications and part numbers, manufacturer if known, cable AWG, cable color) - Validation of power supply – show it will meet load specs • Assembled Boards - Plans for testing and/or stress testing - Qualification process for “good” board • Component Qualification - Voltage ratings correct (i.e., Capacitors) - Verification procedures for all “cold” components 5 11/8/2018 T. Shaw

  6. Electrical Review • ASICs - Requirements and specification - Test and qualification testing - Qualification procedures for “cold” operation • Cables - Specifications and manufacturer if known - Required ampacity for power cables; length of cable - Materials must be low smoke halogen free OR a waiver must be applied for - Cable performance at expected lengths 6 11/8/2018 T. Shaw

  7. Electrical Review • HV Power - Verify connectors are rated for or tested for voltage levels - Verify no touch potential hazards • Firmware - Plan for firmware development; file storage, version control and access - Plan for long term maintenance • System Performance and Documentation - Verification that all system requirements have been met - Verification of all interface requirements - Verification all design documentation is in EDMS 7 11/8/2018 T. Shaw

  8. Electrical Review • Safety - Verification that commercial equipment meets agreed upon safety standards - Verification that custom designs meet safety guidelines and have or can pass operational readiness review 8 11/8/2018 T. Shaw

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.