DISTRICT 2
VIRTUAL TOWNHALL MEETING
March 12, 2020
DISTRICT 2 VIRTUAL TOWNHALL MEETING March 12, 2020 Community - - PowerPoint PPT Presentation
DISTRICT 2 VIRTUAL TOWNHALL MEETING March 12, 2020 Community Resource Representatives Melony Martin melony.martin@birminghamal.gov 205.254.2535 Harold Houston harold.Houston@birminghamal.gov 205.254.2523 Jasmine Fells 205.297.8336
VIRTUAL TOWNHALL MEETING
March 12, 2020
Community Resource Representatives
Melony Martin melony.martin@birminghamal.gov 205.254.2535 Harold Houston harold.Houston@birminghamal.gov 205.254.2523 Jasmine Fells 205.297.8336 Jasmine.Fells@birminghamal.gov
Demolition and Condemnation
Structures demolished in District 2 since January 2018
Demolition and Condemnation
Structures condemned and identified for demolition in the following District 2 neighborhoods
Zoning Enforcement Cases
Active zoning enforcement cases in District 2
This includes violations such as Business Use of Residential Property, Outside Storage, Home Occupation Violations, Fence Violations, and some Inoperable Vehicle cases.
Housing Code Enforcement Violations
Housing code inspections conducted in District 2 since January 2019
These include properties reported to be in violation of the City’s Property Maintenance Code and include violations such as deteriorated roof systems, damaged windows or doors, chipped exterior paint, damaged or deteriorated facades, and inadequate utility service.
Critical Repair Applications
Critical repair applications approved by the Community Development Department during the 2019 cycle within the following District 2 neighborhoods
The average cost for a Critical Repair Grant per home is $10,837. The smallest amount is $2,100 and the maximum amount is $15,000.
General Code Enforcement
Occupied Properties (DPW)
Active general/environmental code enforcement cases in District 2
This includes junk/debris, salvage material, overgrowth and inoperable vehicles.
Illegal Dumping
Active illegal dumping cases reported within the following District 2 neighborhoods
30 cases of illegal dumping have been resolved since January 2019.
Weed Abatements
Lots cut or cleaned in District 2 since January 1, 2019
There are 185 vacant properties active in the Weed Bill for District 2. These are properties that are either waiting to be put on a contractor list or still being processed.
Potholes Repaired and Patching
Potholes repaired in District 2 since January 2019
Potholes Repaired and Patching
The following Locations that have been or will be patched in District 2 this fiscal year for the 2019 contract.
Street Resurfacing Projects
Street segments this fiscal year
Investment in street resurfacing segments
Street Resurfacing Projects
The following street segments will be completed in District 2 this fiscal year
GARDEN CIRCLE)
MONTEVALLO TO SWALLOW LN
CITY LIMITS
(INCLUDING 5 SIDE SPURS/STREETS)
MOUNTAIN DR
Street Resurfacing Projects
The following street segments will be completed in District 2 next fiscal year
Street segments next fiscal year
Investment
Sidewalk Projects
District 2 sidewalks this fiscal year
Investment
Sidewalk Projects
District 2 sidewalks next fiscal year
Investment
Culvert / Storm Sewers
District 2 Neighborhood: Roebuck Removal and replacement of bridge culvert at West Blvd and Village Creek at Golf Course Design Phase is 15% Complete
Public Facilities
District 2 Neighborhood: Roebuck East Precinct 2nd Floor Renovations Construction Phase is 72% Complete
Public Facilities
District 2 Neighborhood: South East Lake Fire Station #19 Reroofing Design Phase is 50% Complete
Roadway / Paving
District 2 Neighborhood: Eastwood Repave and expand parking area at Lawson Field and install lighting Design Phase is 95% Complete
Street / Sidewalk Improvements
District 2 Neighborhood: Crestline New sidewalk on Hagood St to connect to Euclid Ave and Montclair Rd – providing pedestrian link between Birmingham and Mountain Brook (joint effort) Design Phase is 60% Complete
Former Banks High School
District 2 Neighborhood: South East Lake Abatement and demolition of the former Banks High School site $1 Million Investment
Completed Projects
The following public investment projects have been completed in District 2
replaced in lobby
Rd from Observatory Ln to Chestnut St.
walking trail (within median of Clairmont Ave from 50th Pl S to the end of median near 13th Ave S) as part of the Red Rock Trail System
markings as a part of the Red Rock Trail System. Created loop in East Lake and tied into the Ruffner Park entrance; along 81st St S, 75th St S, 85th St S, 5th Ave N, and 2nd Ave S.
VIRTUAL TOWNHALL MEETING