DIGGERS AND DEALERS 2008 (4 August 2008) Bruce Hooper General Manager - Exploration Slide 2 Corporate Overview Capital structure (as at 1 Aug 2008) Balance Sheet (as at 30 June 2008) ASX PEM Cash $77m Shares on issue 197m Hedge
Slide 2
Corporate Overview
Key Shareholders (as at 1 Aug 2008)
AXA Group UBS Nominees Barclays Global Investors Employees 10.6% 8.0% 5.3% 2.1%
Capital structure (as at 1 Aug 2008)
ASX Shares on issue Options Market capitalisation
(undiluted at $0.54 per share)
PEM 197m 2.0m A$106m
Broken Hill Flinders Mount Oxide Corporate
“Balance Sheet” (as at 30 June 2008)
Cash Hedge Book (in-the money) Debt Beltana zinc stockpile $77m $80m $26m 81kt zinc
1 2 3 4 5 6 7 J u l 2 4 O c t 2 4 J a n 2 5 A p r 2 5 J u l 2 5 O c t 2 5 J a n 2 6 A p r 2 6 J u l 2 6 O c t 2 6 J a n 2 7 A p r 2 7 J u l 2 7 O c t 2 7 J a n 2 8 A p r 2 8 J u l 2 8
($/SHARE)
1,000 2,000 3,000 4,000 5,000 6,000 7,000
(A$/TONNE)
Perilya Zinc Price Lead Price
Slide 3
Broken Hill Flinders Mount Oxide Corporate
Flinders Mount Oxide Broken Hill
Key Assets
Slide 4 Note : Cu as at Feb 2008 Zn, Pb as at 2006/07
Operating Operating Projects Projects Exploration Exploration
Tampang (Cu, Au) Tampang (Cu, Au)
Mount Oxide (Cu) Mount Oxide (Cu)
Beltana (Zn) Beltana (Zn) Broken Hill (Zn, Pb, Ag) Broken Hill (Zn, Pb, Ag)
Dee Range (Cu, Zn) Dee Range (Cu, Zn)
Potosi (Zn, Pb, Ag) Potosi (Zn, Pb, Ag) North Mine Deeps (Zn, Pb, Ag) North Mine Deeps (Zn, Pb, Ag)
Flinders (Zn) Flinders (Zn)
Operating Operating Projects Projects Exploration Exploration
Tampang (Cu, Au) Tampang (Cu, Au)
Mount Oxide (Cu) Mount Oxide (Cu)
Beltana (Zn) Beltana (Zn) Broken Hill (Zn, Pb, Ag) Broken Hill (Zn, Pb, Ag)
Dee Range (Cu, Zn) Dee Range (Cu, Zn)
Potosi (Zn, Pb, Ag) Potosi (Zn, Pb, Ag) North Mine Deeps (Zn, Pb, Ag) North Mine Deeps (Zn, Pb, Ag)
Flinders (Zn) Flinders (Zn)
Mount Oxide (Cu)
Ore Reserves
0.0 0.2 0.4 0.6 0.8 1.0 Zinc Lead
Contained Metal Mt
Broken Hill Flinders Mount Oxide Corporate
Mineral Resources
0.0 0.5 1.0 1.5 2.0 2.5 Zinc Lead Copper
Contained Metal Mt
Our Proj ects
Slide 5
Broken Hill Flinders Mount Oxide Corporate
- Top 20 zinc producing mine and Top 10 lead producer worldwide.
- Full Year Production of 91,295t of contained zinc and 52,412t of lead
in line with market guidance.
- Metal production at Broken Hill up 18.5% on the previous quarter.
- Significant new mineral inventory identified in the Southern Operations
and North Mine.
- Leveraged substantial producer.
- Development advanced during year at North Mine and Potosi
exploration decline.
- Permitting underway for Flying Doctor Open Pit Operation.
- Optionality of production sources.
Broken Hill
S ustainable Production
Background Image – painting by Pro Hart
Slide 6
Broken Hill
Exploration S uccess
- Significant Exploration success during year.
- Potosi, Flying Doctor region.
- New resources at Henry George and 1130 deposits.
- New prospects Sam Deeds, Esmeralda.
- Best intercepts at depth in Pinnacles regional with potential for larger deposits.
Broken Hill Flinders Mount Oxide Corporate
Background Image – painting by Pro Hart
Slide 7
Broken Hill
Developing new ore sources
5 km
North Mine Southern Operations
City
Potosi
Piesses Knob
Flying Doctor
Southern Ops Extensions
Stirling Vale 1130 Smiths Sam Deeds Henry George Monarch Flat Exploration targets
Concentrator
Surface projection of ore bodies Perilya Broken Hill Mining Lease Existing Operations
Broken Hill Flinders Mount Oxide Corporate
North Mine Deeps
Feasiblity Study
Slide 8
Flinders zinc oxide proj ect
Existing infrastructure + direct high grade ore shipping + stockpiles of 81kt zinc
Rail line Tenements Rail line Tenements
Broken Hill Flinders Mount Oxide Corporate
- Beltana – stage 1
completed (Feb 08)
- Stockpiled 316,400t
@ 32% zinc (101kt contained zinc at
Feb 08)
- Cash cost US$0.65/lb
zinc
- Completed within year
Slide 9
Broken Hill Flinders Mount Oxide Corporate
Mount Oxide Copper and Cobalt Proj ect
Mount Oxide historical Pit, looking South
Slide 10
Mount Oxide
advanced copper proj ect
- Mt Isa region
- Close to existing infrastructure
- Resource recently upgraded
- Significant new exploration results
- Exploration camp installed
- Infill & extensional drilling April – Dec 08
- Scoping Study completed June Qtr 2008
- Expressions of interest received to further
development of the project
- Permitting advancing
- Feasibility Study June 2009
Broken Hill Flinders Mount Oxide Corporate
Slide 11
Mount Oxide
resource open in all directions
Broken Hill Flinders Mount Oxide Corporate
Table 1: Mount Oxide Mineral Resource Estimate at 0.2 % Cu cut off
Classification M Tonnes Cu % Co % Ag g/t Copper Contained t Cobalt Contained t Silver Contained oz Indicated 9.8 1.6 0.05 12 154,000 5,200 3,430,000 Inferred 5.7 0.9 0.05 4 47,000 3,100 770,000 Stockpiles 0.3 0.7
- 2,000
- Total
15.5 1.3 0.05 9 203,000 8,300 4,200,000
- 80% increase in contained copper
- 60% in Indicated Category
- Scoping study completed on metallurgy, geotechnical and economics
- Significant new explorations results outside the resource from current drilling program
- Potential bi-products
(As at 19 February 2008)
Slide 12
Mount Oxide - Drill Rig
Broken Hill Flinders Mount Oxide Corporate
Slide 13
Mount Oxide - S
chematic Mineralisation Model
Broken Hill Flinders Mount Oxide Corporate
Core Samples
Slide 14
300 metres
Mount Oxide - Resource model looking North in 3d
Broken Hill Flinders Mount Oxide Corporate
Mount Oxide Resource model looking North in 3d, demonstrating the relationship of shallow and low angle stratigraphic mineralised lenses and vertical structures at depth
Slide 15
Mt Oxide Pit Pit Shell – Feb 08 N S W E
Mount Oxide - Whittle Optimised Open Pit
S coping S tudy
Slide 16
Mount Oxide - S
ection 70800mN Recent Intercepts
MOXD089 Part of 31m @ 6.2% Cu in replaced sedimentary unit
20 cm
Broken Hill Flinders Mount Oxide Corporate
- Significant intercepts outside the existing resource.
- MOXD89 – 23m @ 8.9%, 31m @6.2% and 19m @3.7%
- New visual intercept in MOXD104 ~ 40m away. Results all
- pending. MOXD92 no significant mineralisation ~ 80m away.
Slide 17
Mount Oxide - S
ection 70800mN MOXD104 25m S
- uth of MOXD89
345.1 to 349.2m in hole MOXD104
MOXD104 MOXD92 MOXD103
20 cm
Broken Hill Flinders Mount Oxide Corporate
Slide 18
Mt Gordon Mineralised Footprint Mt Oxide
600m
Deposit Comparisons - S
imilar Deposits in size and scale
Broken Hill Flinders Mount Oxide Corporate
Slide 19
Mount Oxide - Underground Potential – 1.5% Cu wireframe
E W
Slide 20
Mount Oxide - Drilling Program up to December 2008
Broken Hill Flinders Mount Oxide Corporate
600m 300m S N
Target Zone Untested extension of pit wide malachite zone Infill drilling to permit open pit
Slide 21
Mount Oxide - Untested Malachite Outcrop immediately NE of
Resource
1m
Broken Hill Flinders Mount Oxide Corporate
20 cm 1m
Slide 22
Mount Oxide - IOCG Targets – Magnetics and Gravity
Theresa
- Old Mt Gordon
- Mammoth
- Big Oxide
- Esperanza
- Mt Oxide
15.5 Mt @ 1.3% Cu
- Weberra
- Theresa
- Mammoth
- Big Oxide
- Esperanza
- Old Mt Gordon
Mt Oxide
15.5 Mt @ 1.3% Cu
Weberra
- TMI Magnetics
Bouger Gravity
Broken Hill Flinders Mount Oxide Corporate
Slide 23
Mount Oxide –
Mount Isa copper province
15.5 Mt @ 1.3% Cu
Broken Hill Flinders Mount Oxide Corporate
- Excellent copper project.
- 203,000 t contained copper.
- Maximising value by rapid
advancement.
- Assessing expressions of
interest.
- Looking to exploit as optimally as
possible.
- Spectacular drill results.
- Ongoing aggressive exploration.
Slide 24
This presentation contains forward looking statements that are subject to risk factors associated with a mining business. Where the company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward looking statements. Such risks include, but are not limited to metals price volatility, currency fluctuations, production performance, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, project delay or advancement, environmental risks, approvals and cost estimates, as well as political and operational risks in the countries and states in which we sell product to, shipping risks and governmental regulation and judicial outcomes. The company does not undertake any obligation to release publicly any revisions to any forward looking statement to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. All references to dollars, cents or $ in this presentation are to Australian currency, unless otherwise stated. References to “Perilya” or “company” references to Perilya Limited (ABN 85 009 193 695) or its applicable subsidiaries. The information in this report that relates to mineral resources for Flying Doctor, Pinnacles, Mount Oxide and Flinders is based on information compiled by Mr David Price who is a full-time employee of Perilya and is a member of the Australian Institute of Mining and Metallurgy and for exploration results for Broken Hill, Mount Oxide and Flinders by Mr Bruce Hooper who is a full-time employee
- f Perilya and a member of the Australian Institute of Geoscientists. Mr Price and Mr Hooper have sufficient experience which is