DETERMINE WHICH OPTIONS ARE RECOMMENDED FOR FURTHER STUDY OPTIONS - - PowerPoint PPT Presentation

determine which options are recommended for further study
SMART_READER_LITE
LIVE PREVIEW

DETERMINE WHICH OPTIONS ARE RECOMMENDED FOR FURTHER STUDY OPTIONS - - PowerPoint PPT Presentation

OBJECTIVE OF THE PDP: DETERMINE WHICH OPTIONS ARE RECOMMENDED FOR FURTHER STUDY OPTIONS FOR FURTHER STUDY MUST INCLUDE: BASE REPAIR PDP: DELIVERABLES ADDITION RENOVATION NEW CONSTRUCTION ON EXISTING SITE OPTIONS FOR FURTHER STUDY MAY


slide-1
SLIDE 1
slide-2
SLIDE 2

PDP: DELIVERABLES

OBJECTIVE OF THE PDP:

DETERMINE WHICH OPTIONS ARE RECOMMENDED FOR FURTHER STUDY

OPTIONS FOR FURTHER STUDY MUST INCLUDE:

  • BASE REPAIR
  • ADDITION RENOVATION
  • NEW CONSTRUCTION ON EXISTING SITE

OPTIONS FOR FURTHER STUDY MAY INCLUDE:

  • NEW CONSTRUCTION ON ALTERNATE SITE(S)
slide-3
SLIDE 3

MSBA PROCESS

CURRENT PROJECT STATUS

Preliminary Design Program

PDP

Preferred Schematic Report

PSR

MODULE 1 MODULE 2 MODULE 3 MODULE 4 MODULE 5 MODULE 6 MODULE 7 MODULE 8

slide-4
SLIDE 4

COMPACT URBAN SITES

COMPACT URBAN SITES

WORCESTER, MA

QUINSIGAMOND ELEMENTARY SCHOOL WOODLAND ACADEMY NORRBACK AVENUE SCHOOL

slide-5
SLIDE 5

ADDITION RENOVATION

slide-6
SLIDE 6

PHASED OCCUPIED CONSTRUCTION

NELSON PLACE ELEMENTARY SCHOOL SOUTH HIGH COMMUNITY SCHOOL

slide-7
SLIDE 7

WORCESTER TECHNICAL HIGH SCHOOL

slide-8
SLIDE 8
slide-9
SLIDE 9

FEASIBILITY STUDY SCHEDULE

BID

SBC Vote to Submit PSR to MSBA:

December 2019

SBC Vote to Submit PDP to MSBA:

  • Sept. 2019

SBC Vote to Submit SD Package to MSBA:

July 2020

Building Occupancy:

Fall 2024

MSBA Vote MSBA Vote

slide-10
SLIDE 10

PDP: CRITICAL TASKS

Alternate Site Evaluation Program Development Evaluation of Existing Building & Site

PDP TASKS

RECOMMENDATION OF OPTIONS FOR FURTHER STUDY

slide-11
SLIDE 11

BUBBLE DIAGRAMS

420,000 Gross Square Feet Required by Proposed Educational Program

slide-12
SLIDE 12

ENGINEERING & TECHNOLOGY ACADEMY

Enrollment: 400 Students (Existing to be expanded)

MARKETING MANAGEMENT & FINANCE

Enrollment: 200 Students

PROGRAMMING & WEB DEVELOPMENT

Enrollment: 200 Students

CONSTRUCTION CRAFT LABORER

Enrollment: 150 Students

CHAPTER 74 PROGRAMS

PROPOSED CHAPTER 74 PROGRAMS:

slide-13
SLIDE 13

SITE CRITERIA

1 2 3 4 5 6 # ORDER OF PRIORITY

slide-14
SLIDE 14

PHASE I SITE SELECTION PROCESS

ALL 10+ ACRE PARCELS WITHIN THE DOHERTY QUADRANT

slide-15
SLIDE 15

PHASE I SITE SELECTION PROCESS

ELIMINATED PARK LAND, PREVIOUSLY DEVELOPED, AND PROHIBITIVE OWNERSHIP

CHANDLER MAGNET SCHOOL FOLEY STADIUM

  • ST. PETER

MARAN

slide-16
SLIDE 16
  • A. DOHERTY SITE
  • Established location
  • Steep topography
  • Abutted by park land
  • Highland street access only

20 ACRES

slide-17
SLIDE 17
  • A. DOHERTY TO FOLEY STADIUM

0.5 MILE 0.3 MILE

1.5 MILES TO CHANDLER MAGNET SCHOOL

  • Potential to develop

pedestrian access to Foley Stadium

1 MILE

slide-18
SLIDE 18

A.1 DOHERTY SITE

  • No Land Acquisition
  • Adequate Staff Parking
  • Premium $$$ Parking

beneath fields (or option for no student parking)

GARAGE BELOW

20 ACRES

slide-19
SLIDE 19

A.1 DOHERTY SITE

  • Pave around existing building

to maximize parking

  • No practice fields available

20 ACRES

: PHASE I

slide-20
SLIDE 20

A.1 DOHERTY SITE

  • Demolition of existing

building

  • Construction of roads for bus

circulation

  • Occupancy of new building

20 ACRES

: PHASE II

slide-21
SLIDE 21

A.1 DOHERTY SITE

  • Extended schedule for

completion of site work and athletic fields above parking

GARAGE BELOW

20 ACRES

: PHASE III

slide-22
SLIDE 22
  • B. FOLEY STADIUM SITE
  • Flat, developed site
  • Unsuitable soil conditions
  • Beaver Brook culvert
  • Beaver Brook Park, not

regulation size fields

  • Recently refurbished Foley

Stadium is heavily used by the district and community

12 ACRES

slide-23
SLIDE 23

B.1 FOLEY STADIUM SITE

  • No Land Acquisition
  • Adequate Staff Parking
  • No Student Parking Shown

(Option for Premium $$$ Student Parking)

12 ACRES

slide-24
SLIDE 24
  • C. CHANDLER MAGNET SITE
  • Tiered site
  • Steep topography
  • Limiting parcel shape
  • Multiple access points
  • Existing 1950’s school building
  • WSU Adjacency

22 ACRES

slide-25
SLIDE 25

C.1 CHANDLER MAGNET SITE

  • No Land Acquisition
  • Adequate Staff Parking
  • Adequate Student Parking
  • Compromised building
  • rganization
  • Limited athletic fields
  • Difficult access to upper

fields

22 ACRES

slide-26
SLIDE 26

C.2 CHANDLER MAGNET SITE

  • Land Acquisition from

Worcester State University LLC & abutters

  • Adequate Staff Parking
  • Adequate Student Parking
  • Most efficient development
  • Least impact to Doherty

Students

22 ACRES

slide-27
SLIDE 27

ALTERNATE SITE RANKING MATRIX

ALTERNATIVE SITE RANKING MATRIX

slide-28
SLIDE 28