Design-Build Institute of America
Western Pacific Region
Mark Hovatter, Chief Facilities Executive Los Angeles Unified School District
Thursday, October 20, 2016 Los Angeles, California
Design-Build Institute of America Western Pacific Region Mark - - PowerPoint PPT Presentation
Design-Build Institute of America Western Pacific Region Mark Hovatter, Chief Facilities Executive Los Angeles Unified School District Thursday, October 20, 2016 Los Angeles, California Summar y F utur e Bo nds State L AUSD L ACCD
Mark Hovatter, Chief Facilities Executive Los Angeles Unified School District
Thursday, October 20, 2016 Los Angeles, California
utur e Bo nds
State
L AUSD L ACCD
r e ntly Unde r way
utur e De sign-Build Pr
AUSD De sign-Build Pr
ate d De live r y
Amo unt - $2.8 Billio n Appr
d
Antic ipate Ano the r
$1 Billio n by De c e mbe r 2016
Co mpr
e he nsive Mo de r nizatio ns E le ve n have be e n appr
Ano the r 10-15 pr
De c e mbe r
ative Ar c hite c t / Co ntr ac to r T e am
imar ily Ne w Co nstr uc tio n and Site Wo r k
xpe dite Pr
te r Ranc h Co mmunity Sc ho o l Additio n Pr
Appr
natio nal Studie s L e ar ning Ce nte r Additio n Pr
Appr
d Str
e e t E le me ntar y Sc ho o l F
vic e Upgr ade Pr
$2.8 Billion in Boar d- Appr
uc tion Pr
PROJECT TYPE BUDGET Comprehensive Modernization 1,420,794,936 HVAC 290,546,064 IT Network Upgrade 231,282,382 Seismic Modernization 212,396,394 Paving/Greening/Playground Equipment 150,646,803 Addition 102,880,614 Plumbing/Irrigation/Drainage 91,331,355 Campus Improvement 83,437,519 Roofing 46,301,268 Access Compliance 39,523,772 Food Services Renovation 32,379,615 Electrical/Lighting 30,689,853 Furniture/Fixtures/Equipment 24,500,000 Reconfiguration 13,461,576 Gym/Athletic Facilities Renovation 11,951,590
PROJECT TYPE BUDGET Excavation 8,858,957 Flooring 4,893,364 Portable 4,000,000 Fire Alarm System 2,702,889 Auditorium Renovation 1,496,876 SEEDS 1,143,409 Fencing 887,020 Lunch/Shade Shelter 429,226 Ceiling/Wall System 376,122 Grand Total 2,806,911,604
E le ve n Pr
* F ive will be De sign-Build Mo stly c o nstr uc ting ne w buildings * Six will be De sign-Bid-Build Mo stly mo de r nizing e xisting buildings (many o f whic h ar e histo r ic )
Boa r d- Appr
e he nsive Mode r niza tion Pr
Pr
Antic ipate d time fr ame appr
s
* 2. Cle ve land High Sc hool
* 7. Polyte c hnic High Sc hool * 8. Roose ve lt High Sc hool
*10. She rman Oaks Ce nte r for E nric he d Studie s Magne t (SOCE S) *11. Ve nic e High Sc hool
* De sign- Build
$105 - $115-millio n
$90 - $100-millio n
man Oaks Ce nte r fo r E nr ic he d Studie s $60 - $70-millio n
$75 - $85-millio n
$65 - $75-millio n
Upc o ming De sign-Build Pr
e me nt fo r F ive Co mpr e he nsive Mo de r nizatio n Pr
* Dollar values are approximate
Upc o ming De sign-Build Co mpr e he nsive Mo de r nizatio n Pr
Site Acreage: 33.6 Acres Board Approved Budget: $109,823,330
Upc o ming De sign-Build Co mpr e he nsive Mo de r nizatio n Pr
Site Acreage: 37.2 Acres Board Approved Budget: $162,209,848
Upc o ming De sign-Build Co mpr e he nsive Mo de r nizatio n Pr
Site Acreage: 22.7 Acres Board Approved Budget: $137,437,976
Upc o ming De sign-Build Co mpr e he nsive Mo de r nizatio n Pr
Site Acreage: 21.5 Acres Board Approved Budget: $93,463,772
Upc o ming De sign-Build Co mpr e he nsive Mo de r nizatio n Pr
Site Acreage: 28.8 Acres Board Approved Budget: $111,491,261
Main Gate at 103rd Street Library of Administration Building
Re c e ntly Comple te d De sign- Build Pr
JORDAN HIGH SCHOOL RE DE VE L OPME NT
Community West) & 1 New Practice Gym Building: Completed December 2014
Network System
Two Lunch shelters and Courtyard 1st Floor of Administration Building
JORDAN HIGH SCHOOL RE DE VE L OPME NT
Classroom of Administration Building East Parking Lot – Looking North Practice Gym East Parking Lot – Looking South
Partnership for Los Angeles Schools (PLAS) Classroom Building Practice Gym Interior Practice Gymnasium Exterior: Aerial View
Jor dan High Sc hool Re de ve lopme nt
Food Service Line
Co mpr e he nsive Mo de r nizatio n Phase II De par tme nt o f Ho using Ce r tifie d Bungalo w Re plac e me nt Se ismic Pr
ADA Ac c e ss Co mplianc e Phase II o f So lar Pr
am
Histo r y o f Pr
y Platfo r ms
De sign-Bid-Build
E duc atio n Co de 17406 (L e ase -L e ase bac k)
Co mpe titive Be st Value Awar d Hybr id: De sign-Bid-Build, De sign-Build
Ne w L e gislatio n fo r 17406 (AB 2316)
Basic ally says that it is o kay to use 17406 if yo u use the L AUSD Mo de l Adds the ability to awar d be fo r e DSA final de sign appr
De sign-Build
E ar lie r L imitatio ns Me ans and Me tho ds De sign Co mpe titio n Stipe nds Se le c tio n Base d o n past Pe r fo r manc e
State me nt o f Qualific atio ns submitte d in r e spo nse to the Re que st fo r Qualific atio ns will be sc o r e d o n the fo llo wing c ate go r ie s and asso c iate d we ighte d po ints:
xpe r ie nc e (K-12) 25%
e aming and Inte gr atio n (Past Pe r fo r manc e as a T e am) 22%
so nne l 22%
xpe r ie nc e 17%
ganizatio n and T e c hnic al Appr
7%
nte r pr ise 5%
1%
r aine d Wo r kfo r c e 1%
IF E CYCL E MAINT E NANCE ? %
* Sc o r ing subje c t to c hange base d o n pr
ite r ia
Pr
e d base d o n the fo llo wing c ate go r ie s and asso c iate d we ighte d po ints:
ic e 28%
ials & Appr
26%
e c hnic al E xpe r tise / Phasing / Sc he dule 25%
e ac h (SBE , We Build, & L
ke r Par tic ipatio n) 15%
ife -Cyc le Co st 2%
d 2%
abo r F
c e Availability 1%
k-base d L e ar ning Par tne r ship 1% * Sc o r
ing subje c t to c hange base d o n pr
ite r ia
imits o f Wo r k
e liminar y Sc he matic De sign
ayo ut, Building Massing, E xte r io r Mate r ials
Pr
am Adjac e nc y Re quir e me nts
ds
duc atio nal Spe c ific atio ns
al Re quir e me nts
aphic Sur ve y
t
astr uc tur e Sur ve y
d Dr awings
QA Mitigatio n Re quir e me nts
r affic Study
matio n
Info r matio n L AUSD to Pr
e ams Co nt.
Re le ase o f RF Q and Adve r tising We e k 1 Mandato r y Pr e -RF Q Sc o pe Pr e se ntatio n We e k 2 Pr e -SOQ Que stio ns We e k 3 L AUSD Re spo nse to Que stio ns We e k 5 State me nt o f Qualific atio ns Due We e k 8 L AUSD Re vie w SOQ We e k 10 Anno unc e me nt o f 3 Sho r t-liste d De sign-Build T e ams We e k 11
* T
ime fr ame s ar e appr
Issuanc e o f RF P We e k 1 Mandato r y Site Walk / L AUSD Pr
We e k 2 Wr itte n Que stio ns Due We e k 2 Issue Adde ndum No .1 We e k 3 Inte r vie w We e k 4 Re que sts fo r Clar ific atio n De adline We e k 5 L AUSD Issuanc e o f L ast Adde ndum We e k 6
* T ime fr ame s ar e appr
De sign- Builde r Non- Pr ic e Pr
We e k 8 F inal Pr e se ntation We e k 9 Se ale d Pr ic e Pr
We e k 10 Se le c tion of De sign- Build T e am / Notic e of Inte nt to Awar d We e k 10 Boar d Author ization to Ne gotiate & E nte r into Contr ac t We e k 16 Antic ipate d Notic e - to- Pr
De sign We e k 16
* T ime fr ame s ar e appr
compliance/
storage/?folder_id=1045824
site/bidding-opportunities/best-value/construction-contracts
hr e e shor t- liste d De sign- Build te ams pr
P se le c tion pr
he two De sign- Build te ams that ar e not se le c te d will r e c e ive a stipe nd
nia E duc ation Code Se c tion 17250.10 e t. se q. (E duc ation Code 17250)
ize s De sign- Build pr
e me nt pr
bid e valuation and se le c tion for c onstr uc tion pr
c ompe tition using an RF Q and RF P pr
ic t will de ve lop RF Q; the De par tme nt of Industr ial Re lations (DIR) que stionnair e is no longe r r e quir e d
De sign-Build Co nstr uc tio n Pr
e me nt
Be nc h o f Mo dular Building Manufac tur e r s Be nc h o f De sign-Build T e ams De c e mbe r to August No t to lo o k like Co ntaine r s CE QA Challe nge s
What L AUSD’s Chie f F ac ilitie s E xe c utive Wants fr
am
uc tion T e am
ake F ull Advantage of the L ate st Innovations in the Constr uc tion Industr y
xpe die nt T ime line
ir m has to Pay for the Pr ivile ge of Submitting a Se c ond Plac e Pr