Derby City Council Project Water and Flood Defence Team

Derby Nottingham Metro Biodiversity – European Structural & Investment Fund (ESIF)

  • Burley Brook
  • Cuttle Brook
  • Duffield Road Rain Gardens
  • Markeaton Brook

Flood and Coastal Erosion Risk Management Funding Grant in Aid (FCERM-GiA)

  • Cotton Brook
  • Cuttle Brook
slide-2
SLIDE 2

Burley Brook Constraints Plan

slide-3
SLIDE 3

Burley Brook Draft Proposals

  • De-culvert section of watercourse
  • Create meander and wetland area
  • Further proposals upstream to be developed
slide-4
SLIDE 4

Cuttle Brook (Derby Nottingham Metro Bid) Location Plan

Location of biodiversity improvements for Cuttle Brook

slide-5
SLIDE 5

Biodiversity Improvements Sunnydale Park

  • Creation of 0.799 HA Lowland meadow
  • Creation of 0.026 HA Ponds
  • Creation of 0.336 HA Read Beds/Wetland
slide-6
SLIDE 6

Proposal for Caxton Street

  • De-culvert 90m of watercourse
  • Create 0.2 HA of wetland
slide-7
SLIDE 7

Cuttle Brook FCERM-GiA

  • Creation of Flood Storage Areas
  • Provision of new SW sewer
slide-8
SLIDE 8

Duffield Road Rain Garden Locations

  • Setting back gullies into verge area and creating raingardens
slide-9
SLIDE 9

Detail of Raingardens

slide-10
SLIDE 10

Markeaton Brook

  • Desilting Proposals west of Ford Street
slide-11
SLIDE 11

Markeaton Brook Cuttle Drinking Stations

  • Location of proposed Cattle Drinking Stations to reduce silt

deposition into Markeaton and Mackworth Brooks

slide-12
SLIDE 12

Derby City Council Project Water and Flood Defence Team

Other areas of work

  • Derby Integrated Urban Drainage Model
  • Installation of groundwater monitoring boreholes
  • Rain gauges and depth gauges on watercourses in the city
  • Responding to planning application as Lead Local Flood

Authority

  • Highway drainage and flood risk management schemes
  • Asset recording
  • Flooding investigation and recording
  • Development of flood defence policy and strategy in the city
slide-13
SLIDE 13

Derby City Integrated Urban Drainage Model

3 dimension of the drainage network in Derby. Under development.

slide-14
SLIDE 14

Groundwater Monitoring Boreholes

slide-15
SLIDE 15

Rain Gauges and Level Gauges in Derby

slide-16
SLIDE 16

Flood risk management area and Wetland Hackwood Farm Development