DE VE L OPING AN AUST RAL IAN L IT HIUM BUSINE SS
ASX : L T R |Aug ust 2019
DE VE L OPING AN AUST RAL IAN L IT HIUM BUSINE SS ASX : L - - PowerPoint PPT Presentation
DE VE L OPING AN AUST RAL IAN L IT HIUM BUSINE SS ASX : L T R |Aug ust 2019 I mpo rta nt I nfo rma tio n F or war d L ooking State me nts T he I nfo rma tio n in this re po rt tha t re la te s to E xplo ra tio n Re sults fo
ASX : L T R |Aug ust 2019
F
war d L
T his Pre se nta tio n ma y inc lude sta te me nts tha t c o uld b e de e me d “fo r wa rd-lo o king sta te me nts”. Altho ug h the Co mpa ny b e lie ve s the e xpe c ta tio ns e xpre sse d in suc h fo rwa rd-lo o king sta te me nts a re b a se d o n re a so na b le a ssumptio ns, suc h sta te me nts a re no t g ua ra nte e s o f future pe rfo rma nc e a nd a c tua l re sults o r de ve lo pme nts ma y diffe r ma te ria lly fro m tho se e xpe c te d in the fo r wa rd-lo o king sta te me nts o r no t ta ke pla c e a t a ll.
No offe rto se ll or invitation to buy
T his Pre se nta tio n is no t, a nd sho uld no t b e c o nside re d to , c o nstitute a ny o ffe r to se ll, o r so lic ita tio n o f a n o ffe r to b uy, a ny se c uritie s in L io nto wn Re so urc e s L imite d, a nd no pa rt
a ny pe rso n. L io nto wn Re so urc e s L imite d do e s no t a c c e pt a ny lia b ility to a ny pe rso n in re la tio n to the distrib utio n o r po sse ssio n o f this Pre se nta tio n fro m o r in a ny jurisdic tio n.
Disc laime r
Whilst c a re ha s b e e n e xe rc ise d in pre pa ring a nd pre se nting this Pre se nta tio n, to the ma ximum e xte nt pe rmitte d b y la w, L io nto wn Re so urc e s L imite d a nd its re pre se nta tive s:
a de q ua c y, a c c ura c y, c o mple te ne ss o r re a so na b le ne ss o f this Pre se nta tio n;
re a so na b le ne ss o f this Pre se nta tio n; a nd
Compe te nt Pe r son State me nt
T he I nfo rma tio n in this re po rt tha t re la te s to Mine ra l Re so urc e s fo r the Ka thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nt “Ka thle e n Va lle y L ithium Re so urc e jumps 353% to 74.9Mt @ 1.3% L i2O” re le a se d o n the 9th July 2019 whic h is a va ila b le o n www.ltre so urc e s.c o m.a u. T he I nfo rma tio n in this re po rt tha t re la te s to Me ta llurg y fo r the Ka thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nt “Hig hly e nc o ura g ing re sults fro m initia l me ta llurg ic a l te st wo rk a t the Ka thle e n Va lle y L ithium-T a nta lum Pro je c t, WA” a nd “Ka thle e n Va lle y L ithium Re so urc e jumps 353% to 74.9Mt @ 1.3% L i2O” re le a se d o n the 12th No ve mb e r 2018 a nd 9th July 2019 re spe c tive ly whic h a re a va ila b le
www.ltre so urc e s.c o m.a u. T he I nfo rma tio n in this re po rt tha t re la te s to the Sc o ping Study fo r the Ka thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nt “Ka thle e n Va lle y Sc o ping Study c o nfirms po te ntia l fo r ro b ust ne w WA lithium mine de ve lo pme nt” re le a se d o n the 29th Ja nua ry 2019 whic h is a va ila b le o n www.ltre so urc e s.c o m.a u. T he I nfo rma tio n in this re po rt tha t re la te s to E xplo ra tio n Re sults fo r the Ka thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nts “L a te st drilling e xte nds thic k, hig h- g ra de zo ne a t Ka thle e n Va lle y furthe r no rth a s stro ng a ssa y re sults c o ntinue ”, “Spe c ta c ula r inte rc e pt o f 90m @ 1.3% L i2O a t Ka thle e n Va lle y” a nd “Wo rk c o mme nc e s
lithium re sults” a nd “F urthe r spe c ta c ula r drill inte rc e pts re turne d fro m K a thle e n Va lle y” re le a se d o n the 9th Ma y 2019, 20th Ma y 2019, 3rd June 2019 a nd 24th June 2019 re spe c tive ly whic h a re a va ila b le o n www.ltre so urc e s.c o m.a u. T he I nfo rma tio n in this pre se nta tio n tha t re la te s to the E xplo ra tio n Re sults fo r the Bulda nia Pro je c t is e xtra c te d fro m the ASX a nno unc e me nts e ntitle d “Mo re stro ng a ssa ys c o nfirm sig nific a nt lithium disc o ve ry a t Bulda nia Pro je c t in WA”, “L io nto wn c o nfirms se c o nd sig nific a nt lithium disc o ve ry in WA with ne w thic k, hig h-g ra de hits a t Bulda nia ”, “Outsta nding ne w drilling re sults c o ntinue to e xpa nd lithium mine ra lisa tio n a t Bulda nia ”, “L io nto wn furthe r e xpa nds pro spe c tive lithium fo o tprint a t Bulda nia in WA’ s So uth-E a ste rn Go ldfie lds”, “L a te st a ssa ys c o nfirm lithium mine ra lisa tio n o ve r >1.3km strike le ng th a t the Bulda nia L ithium Pro je c t in WA”, “L io nto wn e xpa nds lithium fo o tprint a t Bulda nia in WA’ s So uth-E a ste rn Go ldfie lds”, “I nitia l a ssa ys e xte nd mine ra lise d tre nd a t Bulda nia ” a nd “F urthe r thic k lithium inte rc e pts fro m drilling a t Bulda nia ” re le a se d o n the 26th Ma rc h 2018, 19th Se pte mb e r 2018, 1st No ve mb e r 2018, 13th No ve mb e r 2018, 20th No ve mb e r 2018, 14th Ma rc h 2019, 22nd July 2019 a nd 29th July 2019 re spe c tive ly whic h a re a va ila b le o n www.ltre so urc e s.c o m.a u. T he Co mpa ny c o nfirms tha t it is no t a wa re
ma te ria lly a ffe c ts the info rma tio n inc lude d in the o rig ina l ma rke t a nno unc e me nts a nd tha t a ll ma te ria l a ssumptio ns a nd te c hnic a l pa ra me te rs unde rpinning the e stima te s in the re le va nt ma rke t a nno unc e me nts c o ntinue to a pply a nd ha ve no t ma te ria lly c ha ng e d. T he c o mpa ny c o nfirms tha t the fo rm a nd c o nte xt in whic h the Co mpe te nt Pe rso n’ s finding s a re pre se nte d ha ve no t b e e n ma te ria lly mo difie d fro m the o rig ina l ma rke t a nno unc e me nts.
2
KALGOORLIE PERTH
Kathle e n Valle y L ithium Pr
e a se s
sta b lishe d mining re g io n
a thle e n Va lle y – 5th b ig g e st re so urc e in Austra lia
(e xc luding ro ya ltie s)
a thle e n Va lle y PF S Q4 2019
a t Bulda nia Oc t 2019
xplo ra tio n upside
Buldania L ithium Pr
3
E L E CT RIC CHARGING ST AT IONS IN GE RMANY 2019
“T he r e is no sign of slowing down...by 2040, we e xpe c t 57% of all passe nge r ve hic le sale s, and ove r 30% of the global passe nge r ve hic le fle e t, will be e le c tr ic .”
E L E CT RI C VE HI CL E OUT L OOK , BL OOMBE RG NE F , June 19
“L ithium: T he Ir r e plac e able E le me nt of the E le c tr ic E r a”
VOL K SWAGE N GROUP, Ma rc h 19
“Auto c ompanie s ar e spe nding $225 billion to de ve lop mor e than 200 ne w plug-in ve hic le s thr
WAL L ST RE E T JOURNAL , Aug ust 19
Vo lkswa g e n c o mmit to b uild 22 millio n E V’ s a c ro ss 70 ne w mo de ls b y 2028
(Ma rc h 19)
2010: Just a fe w tho usa nd E
V’ s so ld
2018: +2 millio n so ld 2025: 10 millio n sa le s fo re c a st 2030: 28 millio n sa le s fo re c a st 2040: 56 millio n sa le s fo re c a st
(Blo o mb e rg NE F , June 19)
BMW pla ns to ha ve 25 E V mo de ls in 2023
(June 19)
T
se ll 5.5millio n E V’ s a ye a r b y 2025
(June 19)
Vo lvo sa ys E V’ s will ma ke up to 50% o f its sa le s b y 2025 (April 18)
T a rg e t o f 30% pe ne tra tio n o f e le c tric ve hic le s sa le s b y 2030 Que b e c ta rg e ting 100% ze ro e missio ns b y 2050 CANADA
Global polic y state me nt by gove r nme nts suppor ting E V adoption (Be nc hmar k Mine r al Inte llige nc e – lithium for e c ast May 2019)
Pro po sa l to e nd ICE sa le s b y 2035.
Ge r many b y 2030. Co nsid e ra tio ns fo r E
U wid e b a n 2030 NORWAY + NE T HE RL ANDS
Pro po sa l to e nd ICE sa le s b y 2040 UK + F RANCE
T a rg e t o f 5% pe ne tra tio n o f e le c tric ve hic le sa le s b y 2020. 20% b y 2025. CHINA
Pro po sa l to e nd ICE sa le s b y 2030. INDI A
T a rg e t o f 30% pe ne tra tio n o f e le c tric ve hic le sa le s b y 2030 BRAZIL
5
PERTH
JUL Y 2019 RE SOURCE
74.9Mt @ 1.3% L i2O and 140ppm T a 2O 5
83% Me a sure d a nd I ndic a te d 353% inc re a se o n ma ide n 2018 MRE
PF S sc he dule d fo r c o mple tio n Q4 2019
Conve ntional mining and pr
Sc o ping Study (Ja nua ry 2019) o n ma ide n MRE c o nfirms po te ntia l fo r sta nda lo ne mining o pe ra tio n
T e st wor k c onfir ms ~6% DMS spodume ne c onc e ntr ate – fe asibility-le ve l te st wor k
Re so urc e is o pe n a lo ng strike a nd a t de pth
Kathle e n Valle y L ithium Proje c t
7
R e fe r to Appe ndix on Slide 29 for Pe e r Compa rison Informa tion inc luding R e sourc e Cla ssific a tions 8
E a rl Gre y (WE S / SQM / K idma n) Gre e nb ushe s (T a liso n/ T ia nq i) Wo dg ina (Min Re s/ Alb e rma rle ) Mt Ma rio n (Min Re s/ Ga nfe ng ) Mt Ca itlin (Ga la xy) Pilg a ng o o ra (Altura ) Ba ld Hill (Allia nc e ) Wha b o uc hi (Ne ma ska )
0.70 1.20 1.70 2.20 2.70 50 100 150 200 250
L i2O Gr ade % Re sour c e MT Pilg a ng o o ra (Pilb a ra Mine ra ls)
Kathle e n Valle y We ste rn World | Spodume ne Dominant | T
i2O Only
De ve lopme nt Ope r ating
400 600 800 1,000 1,200 1,400 1,600
200 300 400 500 600 K idma n - E a rl Gre y E uro p e a n L ithium - Wo lfsb e rg Pie dmo nt - Pie dmo nt F ro ntie r - PAK Sa va nna h - Mina Do Ba ro sso L io nto wn Re so urc e s - K a thle e n Va lle y Critic a l E le me nts - Ro se Co re L ithium - F innis Sa yo na Mining - Authie r E nte rprise Va lue pe r T
i2O Co nta ine d L i2O (kt)
R e fe r to Appe ndix on slide 30 a nd 31 for Pe e r Compa rison Informa tion 9
We ste rn World | Spodume ne Dominant
E V / tonne L i2O Attr ibutable Conta ine d L i2O (Kt)
Me asur e d Indic ate d Infe r r e d NORT H SOUT H Sc oping Study Pit Conc e ptual E xpande d Pit
10
Me asur e d Indic ate d Infe r r e d
11
Me ta llurg ic a l T e stwo rk Optimisa tio n / Mining Studie s Re so urc e Drilling / Upda te d MRE PF S (inc luding initia l Re se rve Sta te me nt Othe r studie s / pe rmitting
MIL E ST ONE
DF S (sub je c t to pe rmitting / a c c e ss)
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2019 2020
12 12
~26,000 sulphur assays & flora / fauna surve ys
s
a vo ura b le to po g ra phy
ide ntifie d
issue s ide ntifie d
13
Cur r e nt PF S T e st Wor k Re sults
i
2O fro m DMS c o nc e ntra te
i
2O re c o ve re d to DMS c o nc e ntra te
lotation te st wo rk in pro g re ss
Sc oping Study (2018) T e st Wor k Re sults
i
2O fro m DMS c o nc e ntra te
i
2O fro m flo ta tio n c o nc e ntra te
i
2O re c o ve ry
e 2O 5)
a 2O 5 c o nc .
14
Sc o ping study pre pa re d b y L yc o po dium Mine ra ls Pty L td
Ja nua r y 2019 Study – He a dline Me tr ic s
NPV(8%, re a l, po st ta x) A$421M (Ra ng e o f A$316 to A$526M) IRR 38% Pa yb a c k <3 ye a rs F re e Ca sh F lo w A$762M Ave ra g e Ca sh F lo w ~A$100M pe r a nnum Pla nt Ca pa c ity 2Mtpa (L i & T a ) Annua l Pro duc tio n ~360kt SC6 L OM SC6 PRICE A$900 (US$650/ t) F OB L OM Ope x ~A$428/ t SC6 Ca pe x ~A$232M
15
~25,000m RC drill pro g ra m c o mple te d H1 2019 T hic k (>45m), hig h g ra de , “fe e de r” zo ne disc o ve re d b y la te st drilling . Mine ra lisa tio n e xte nde d fo r >300m a lo ng strike a nd do wn dip o f o pe n pit indic a te d b y Sc o ping Study Syste m o utc ro ps, e xte nds do wn dip fo r >1km a nd
Ope n to the NW a nd do wn dip
48m @ 1.4% Li2O 26m @ 2.0% Li2O 26m @ 1.6% Li2O 52m @ 1.4% Li2O 30m @ 1.6% Li2O 90m @ 1.3% Li2O 51m @ 1.2% Li2O 83m @ 1.5% Li2O 48m @ 1.5% Li2O 74m @ 1.3% Li2O 25m @ 1.4% Li2O 62m @ 1.2% Li2O
Open
Drill Section
43m @ 1.7% Li2O 45m @ 1.7% Li2O 27m @ 1.5% Li2O 34m @ 1.4% Li2O
KAT HL E E N VAL L E Y DRIL L PL AN
16
Conceptual open pit based on maiden resource and scoping study Conceptual open pit based on maiden resource and scoping study
13m @ 1.7% Li2O 12m @ 1.4% Li2O 31m @ 1.7% Li2O 8m @ 2.0% Li2O 13m @ 1.6% Li2O 12m @ 1.8% Li2O 24m @ 1.2% Li2O 23m @ 1.0% Li2O 83m @ 1.5% Li2O
17
13m @ 1.9% Li2O
NE SW
18
PERTH
Outc ro pping , fre sh, spo dume ne - re la te d mine ra lisa tio n
Mine ra lisa tio n a t Anna e xte nde d to the SE unde r sha llo w c o ve r – strike le ng th >1.4km a nd o pe n Simila r g e o lo g y to the Mt Ma rio n a nd Ba ld Hill lithium de po sits (71Mt a nd 26Mt re spe c tive ly)
Go o d infra struc ture – lo c a te d o n E yre Hig hwa y ~30km e a st o f K a lg o o rlie - E spe ra nc e ra ilwa y
L io nto wn ha s 100% o f the lithium a nd re la te d me ta l rig hts
Pa rt o f la rg e r, 600km 2 stra te g ic la nd ho lding
Signific ant lithium disc ove ry
Buldania Proje c t
20
21
13m @ 1.0% Li2O 25m @ 1.2% Li2O
2.0% Li2O 58m @ 1.2% Li2O
1.7% Li2O 39m @ 1.6% Li2O
2.1% Li2O 32m @ 1.1% Li2O
1.3% Li2O 12m @ 1.2% Li2O
1.7% Li2O 30m @ 1.4% Li2O
1.6% Li2O 35m @ 1.2% Li2O
1.7% Li2O 42m @ 1.0% Li2O
1.4% Li2O 29m @ 1.3% Li2O
1.7% Li2O 11m @ 1.4% Li2O
2.0% Li2O 14m @ 1.7% Li2O
2.0% Li2O 25m @ 1.1% Li2O
1.8% Li2O 20m @ 1.1% Li2O
1.3% Li2O 23m @ 1.0% Li2O
1.4% Li2O 15m @ 1.3% Li2O
1.5% Li2O
2019 drill hole Proposed drill hole Previous drill hole
12m @ 1.6% Li2O
1.9% Li2O
22
Me tallur gic al studie s foc use d on optimising gr ade and r e c ove r ie s
PF S sc he dule d for c omple tion Q4 2019
E xplor ation dr illing Re gional e xplor ation and disc ove r y dr illing Maide n Mine r al Re sour c e Oc t 2019 Pr e liminar y me tallur gic al te st wor k
23
Ma na g ing Dire c to r
Da vid Ric ha rds
millio n o unc e Ve ra Na nc y Go ld De po sits Cha irma n
T im Go yde r
xe c utive Cha irma n Cha lic e Go ld Mine s
No n-E xe c utive Dire c to r
Cra ig Willia ms
O o f E q uino x Mine ra ls
Antho ny Cipria no
a t De lo itte s No n-E xe c utive Dire c to r
Ste ve n Cha dwic k
L yc o po dium Mine ra ls No n-E xe c utive Dire c to r
ASX CODE L T R Sha re s o n Issue ~1,689M Ma rke t Ca pita lisa tio n ~$203M (AT 12.0CPS) Ma jo r Sha re ho lde r T im Go yde r~17% T
~42% Ca sh (a s a t 12-Aug -19) ~A$15.8M (+ ~A$1.4M)*
*An a dditio na l ~A$1.4M will b e a dde d to the c a sh b a la nc e sub je c t to Sha re ho lde r a ppro va l to issue Pla c e me nt Sha re s to the Dire c to rs a t a pric e o f $0.12 pe r Sha re (a s pre vio usly a nno unc e d).
24 $0.00 $0.02 $0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16
26
Cut-off gr ade (L i2O) Re sour c e Cate gor y Million T
L i2O (% ) T a 2O 5 (ppm)
0.5 Me a sure d 17.6 1.3 160 Ind ic a te d 42.2 1.3 140 Infe rre d 10.1 1.1 150
Sub-T
69.9 1.3 150
0.7 Ind ic a te d 2.5 1.4 120 Infe rre d 2.5 1.3 110
Sub-T
5.0 1.4 110 T
74.9 1.3 140
Cut- Off L i2O Ope n pit pote ntia l a bove 200mR L Unde rg round pote ntia l be low 200mR L
Mt L i2O (%) T a 2O 5 Mt L i2O (%) T a 2O 5 0.3 70.2 1.3 150 5.1 1.4 110 0.4 70.1 1.3 150 5.1 1.4 110
0.5 69.9 1.3 150
5.1 1.4 110 0.6 69.3 1.3 150 5.1 1.4 110
0.7
68.1 1.3 150
5.0 1.4 110
0.8 65.6 1.3 150 4.9 1.4 110 0.9 61.8 1.3 150 4.7 1.4 110 1.0 56.4 1.4 150 4.4 1.4 110
Pa r a me te r Ge ne r a l a nd E c onomic
Disc o unt ra te (re a l, po st ta x) 8% Spo dume ne c o nc e ntra te pric e US$650 pe r to nne F OB T a nta lum c o nc e ntra te pric e (c o nta ine d T a 2O 5) US$71 pe r po und F OB
E xc ha ng e r a te – AUD/ USD
0.72
Mining a nd Pr
Ave ra g e L ife -o f-Mine strip ra tio 8.24:1 Pro c e ssing ra te 2Mtpa L ife -o f-Mine Pro duc tio n T a rg e t 15.7Mt o re Ave ra g e L i2O g ra de (dilute d) 1.26% Ave ra g e T a 2O 5 g ra de (dilute d) 154ppm L i2O re c o ve rie s 79% T a 2O 5 re c o ve rie s 50% Spo dume ne c o nc e ntra te g ra de 5.6% T a nta lite c o nc e ntra te g ra de 30% Mo isture c o nte nt o f c o nc e ntra te 13%
Pa r a me te r Cost Assumptions
L OM a ve ra g e o pe n pit mining c o sts ($/ t o re mine d) A$37.72 L OM a ve ra g e pro c e ssing c o st ($/ t o re mille d) A$19.32 L
($/ t c o nc e ntra te ) A$75.65 Ge ne ra l a nd a dmin ($/ t o re mille d) A$6.01 We ste rn Austra lia Sta te ro ya lty 5% Othe r ro ya ltie s 3% g ro ss sa le s a nd $0.5/ t o re mine d Co rpo ra te ta x ra te 30% E stima te d o pe ning ta x lo sse s a va ila b le A$25M
27
A$M $M
Re ve nue s
2,802
Ope rating c osts
(1,236)
Capital e xpe nditure
(232) (25)
Royaltie s
(232)
Corporate tax
(315)
L ife of Mine Proje c t F re e Cash flow
762
Main Are a Capital (A$M) T re atme nt Plant
82.8
Re age nts & Plant Se rvic e s
9.5
Infrastruc ture – ge ne ral
39.9
Mining
6.1
Contrac tor and Construc tion Indire c ts
18.6
Subtotal
156.9
Manage me nt Costs
20.6
Owne rs Costs
14.4
Subtotal
35.0
Continge nc y
40.3
Proje c t T
232.2
28
169 348 351 357 356 372 355 356 149 616 468 552 434 433 377 438 310 191 701 570 660 537 520 468 525 391 293
200 300 400 500 600 700 800
100 150 200 250 300 350 400
Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
Opex (A$t/conc)
Spodumene Concentrate Production FOB Opex net of Tantalum credits (A$/t) FOB Opex no Tantalum (A$/t)
29
1.23% 1.24% 1.26% 1.26% 1.32% 1.26% 1.26% 1.42%
163 174 169 142 156 142 133 189
40 60 80 100 120 140 160 180 200
0.40% 0.60% 0.80% 1.00% 1.20% 1.40% 1.60% Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Tantalum Grade (ppm Ta2O5) Lithium Grade (%Li2O)
30
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 0.5 1 1.5 2 2.5 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Tonnes (Mt)
Unclassified Inferred Indicated Measured Percentage Inferred
31
Compa ny Proje c t Sta g e Me a sure d Mt Indic a te d Mt Infe rre d Mt Globa l MR E Mt MR E Gra de Informa tion Sourc e Pilba ra Mine ra ls
Pilg a ng o o ra Ope ra ting 22.8 112.8 90.4 226 1.3
ASX Anno unc e me nt, 17 Se pt 2018 - http:/ / www.pilb a ra mine ra ls.c o m.a u/ site / PDF / 2235_0/ Pilg a ng o o ra Re se rve a ndRe so urc e Upg ra de
We sfa rme rs / SQM / Kidma n
E a rl Gre y De ve lo pme nt 66 106 17 189 1.5
ASX Anno unc e me nt, 19 Ma rc h 2018 - https:/ / wc se c ure .we b link.c o m.a u/ pdf/ K DR/ 01963105.pdf
T a lison / T ia nqi
Gre e nb ushe s Ope ra ting 0.6 117.9 2.1 120.6 2.4
NI 43-101 T e c hnic a l Re po rt 2012 - http:/ / www.g o lde ndra g o nc a pita l.c o m/ g re e nb ushe s-lithium-mine /
Mine ra l R e sourc e s a nd Albe ma rle
Wo dg ina Ope ra ting 177 59.9 236.9 1.2
ASX Anno unc e me nt, 23 Oc to b e r 2018 http:/ / c lie nts3.we b link.c o m.a u/ pdf/ MI N/ 02037855.pdf
Ga la xy R e sourc e s
Mt Ca ittlin Ope ra ting 2.2 9.9 4.6 16.7 1.28
ASX Anno unc e me nt 23rd Ja n 2019: https:/ / www.a sx.c o m.a u/ a sxpdf/ 2019012 3/ pdf/ 4420zn6jk8tl0q .pdf
Mine ra l R e sourc e s L td a nd Jia ng xi Ga nfe ng
Mt Ma rio n Ope ra ting 22.70 48.7 71.3 1.37
ASX Anno unc e me nt, 28th Oc to b e r: https:/ / www.ne o me ta ls.c o m.a u/ re po rts/ 2018-10-31-1697-MI NMtMa rio .pdf
Altura Mining
Pilg a ng o o ra Ope ra ting 8.7 38 3.8 50.5 1.01
Inve sto r Pre se nta tio n, 21 Ma rc h 2019: https:/ / a ltura mining .c o m/ wp- c o nte nt/ uplo a ds/ 2019/ 03/ 1912571.pdf
Allia nc e Mine ra l Asse ts L td
Ba ld Hill Ope ra ting 14.4 12.1 26.5 1.0
Inve sto r Pre se nta tio n, Ma rc h 2019: http:/ / www.a llia nc e mine ra ls.c o m.a u/ wp
Ne ma ska E xplora tion
Wha b o uc hi De ve lo pme nt 17.0 20.6 16.1 53.7 1.45
We b site , 18th June 2019: https:/ / www.ne ma ska lithium.c o m/ e n/ wh a b o uc hi/ lithium-re so urc e s-re se rve s/
32
33 Pe e r lithium c ompa ny de posit (De ve lope rs) Sta g e Mt (Attributa ble ) L i2O% E nte rprise Va lue pe r T
c onta ine d L i2O Ma rke t Ca p ($Am) 17/ 7/ 19 E
($Am) E V ($Am) 17/ 7/ 19 Conta ine d L i2O (kt) (Attributa ble ) Kidma n - E a rl Gre y PF S
94.5 1.50 524 769 25 744 1,417
E urope a n L ithium - Wolfsbe rg PF S
11.0 1.0 410 48 3 45 110
Pie dmont - Pie dmont Sc oping Study
27.9 1.11 281 118 31 87 310
F rontie r - PAK PF S
10.4 1.82 264 52 2 50 189
Sa va nna h - Mina Do Ba rosso Sc oping Study
27.0 1.06 248 85 14 71 286
L iontown R e sourc e s - Ka thle e n Va lle y Sc oping Study
74.9 1.30 202 200 3 197 974
Critic a l E le me nts - R
F S
34.7 0.92 175 60 4 56 320
Core L ithium - F inniss DF S
9.6 1.35 156 32.3 12 20.3 130
Sa yona Mining - Authie r DF S
20.9 1.01 47 12 2 10 211
Compa ny Proje c t Sta g e Me a sure d Mt Indic a te d Mt Infe rre d Mt Globa l R e sourc e Mt R e sourc e Gra de Informa tion Sourc e (Attributa ble ) E urope a n L ithium
Wo lfsb e rg De ve lo pe r 2.9 3.4 4.7 11 1
Co rpo ra te Pre se nta tio n, Ma rc h 2019 - https:/ / e uro pe a nlithium.c o m/ wp- c o nte nt/ uplo a ds/ 2019/ 03/ 190322- E uro pe a n-L ithium- Pre se nta tio n_Wide sc re e nF I NAL _Co mpre sse d.pdf
Kidma n
E a rl Gre y De ve lo pe r 33 53 8.5 94.5 1.5
ASX Anno unc e me nt, 19 Ma rc h 2018 - https:/ / wc se c ure .we b link.c o m.a u/ pdf/ K DR/ 01963105.pdf
Sa va nna h
Min Do Ba ro sso e t a l De ve lo pe r 6.6 8.4 12 27 1.06
AIM Anno unc e me nt, 31 Ma y 2019 - https:/ / www.sa va nna hre so urc e s.c o m/ c ms/ wp- c o nte nt/ uplo a ds/ 2019/ 05/ Po rtug a l- Upda te -1.pdf
Pie dmont L ithium
Co re De ve lo pe r 13.9 14 27.9 1.11
ASX Anno unc e me nt, 25 June 2019 - https:/ / d1io 3yo g 0o ux5.c lo udfro nt.ne t/ _a e e 37e d4f1b 7c 04614de a 0a 7b 549e 5c 2/ pi e dmo ntlithium/ db / 336/ 2543/ pdf/ 190625 +-+Re so urc e +Upda te _F ina l.pdf
F rontie r
PAK De ve lo pe r 1.2 7.3 1.9 10.4 1.82
www.fro ntie rlithium.c o m
Critic a l E le me nts
Ro se De ve lo pe r 31.9 2.8 34.7 0.92
NI 43 101 T E CHNI CAL RE PORT NOVE MBE R 29, 2017 - https:/ / www.c e c o rp.c a / wp- c o nte nt/ uplo a ds/ ro se -43- 101_re vise d_no ve mb e r_2017.pdf
Core L ithium
F inniss De ve lo pe r 1.09 1.91 6.6 9.63 1.35
Inve sto r Pre se nta tio n, 21 Ma y 2019 "Be yo nd 10 Millio n T
https:/ / wc se c ure .we b link.c o m.a u/ pdf/ C XO/ 02107382.pdf
Sa yona
Authie r De ve lo pe r 6.58 10.6 3.76 20.94 1.0
ASX Anno unc e me nt, 24th Se pt 2019, http:/ / sa yo na mining .c o m.a u/ wp/ wp- c o nte nt/ uplo a ds/ 2018/ 09/ ASX24Se p18_ Authie r-Pro je c t-E xpa nde d-JORC-Ore - Re se rve sRe so urc e .pdf
34
OF F ICE
L e ve l 2, 1292 Ha y St We st Pe rth WA 6005
PHONE NUMBE R
08 9322 7431
WE BSIT E:
www.ltre so urc e s.c o m.a u
E MAIL
info @ ltre so urc e s.c o m.a u
https:/ / twitte r.c o m/ L io nto wnRe s https:/ / a u.linke din.c o m/ c o mpa ny/ lio nto wn-re so urc e s-limite d