DANE COUNTY JAIL CONSOLIDATION Exterior Design Presentation | - - PowerPoint PPT Presentation
DANE COUNTY JAIL CONSOLIDATION Exterior Design Presentation | - - PowerPoint PPT Presentation
DANE COUNTY JAIL CONSOLIDATION Exterior Design Presentation | November 19, 2019 Whats been happening: 1. Schematic Design documents completed 2. Schematic Design cost estimate underway 3. City of Madison Developer Assistance Team Meeting
What’s been happening:
- 1. Schematic Design documents completed
- 2. Schematic Design cost estimate underway
- 3. City of Madison Developer Assistance Team Meeting (DAT)
- 4. City of Madison Urban Design Informational meeting
- 5. Meeting held Nov. 7th with the Carpenters
- 6. Meeting held Nov. 11th with Bassett Street Neighborhood
Material Selection Approach:
- Lots of material options considered
- Impact of exterior material selection on building structure
- Impact of exterior material selection on installation
- Impact of exterior material selection on long-term
maintenance
- Terra Cotta
- Benefits
- Local use
- Nationally utilized
Terracotta Panels:
1. Durable and Long Lasting 2. Minimal Maintenance 3. Easy to Install, installs quickly, no drying time 4. Installs in any weather situation 5. Repetitive and Modular 6. No paint, no sealants, no gaskets, no mortar 7. Multiple Colors and Shapes 8. Multiple Suppliers 9. High Color Stability
- 10. Sustainable
- 11. Rain Screen Wall System
- 12. Light Weight – able to reduce structure sizing and cost
- 13. Easy to remove and reuse in case of future expansion
Hill Farm State Office Building Local Examples of Terracotta wall panels
Wisconsin Institute of Discovery
Potter Lawson’s office building
Site Context Aerial with drives
Site Context Aerial with drives P S B C O U R T H O U S E
Wilson St at Grade
Floor plans here
Floor plans here
First Floor
v
Floor plans here
Second Floor
v v
Floor plans here v
Third Floor
v
Floor plans here
Fourth Floor
v
Floor plans here
Fifth Floor
v
Floor plans here
SIXTH THRU EIGHTH FLOOR PLAN
Sixth thru Eighth Floor
v
Sixth thru Eighth Floor Mezzanine
11.07.19
11.07.19
11.07.19
Current proposed design 10.16.19 11.07.19
10.16.19
11.07.19
Next Steps:
1. Continued Design Refinement
- Wilson and Doty Street at grade
- Exterior Materials (sizes, glass selection…)
2. Upcoming Meetings
- Dec. 10th Bassett Neighborhood Meeting
- Dec. 11th Urban Design Commission Informational Presentation
- City of Madison Development Assistance Team
3. Upcoming Submittals
- January Planned Development (PD) Submittal – March 2020