context
play

Context Problem Statement Stormwater Combined Sewer Overflows - PowerPoint PPT Presentation

Context Problem Statement Stormwater Combined Sewer Overflows Limitations of actual measurement systems System Requirements Hardware Algorithms Water Level Surface Water Speed Partners Separated sewer system Stormwater discharges Combined


  1. Context Problem Statement Stormwater Combined Sewer Overflows Limitations of actual measurement systems System Requirements Hardware Algorithms Water Level Surface Water Speed Partners

  2. Separated sewer system Stormwater discharges Combined sewer system CSOs

  3. Main source of pollution for heavy metals, PAHs, in urban areas… Example: Field survey (US): leaks of oil by vehicles is equivalent to about 27 Exxon Valdez tanker spills every year…

  4. Important source of pollution: phosphorous, nitrogen, organic matter, pathogens and viruses, residues of pharmaceuticals… Video1 and Video 2

  5. 100% % of input to the Vidy Bay 80% Stormwater 60% CSOs WWTP 40% 20% 0% Cu Zn Cr Pb Cd Ptot TSS Chamberonne WWTP Vidy beach Parameter river Flon River > 480 [mg Cu/kg] 240 - 480 [mg Cu/kg] Probable effect concentration: 120 - 240 [mg Cu/kg] 150 [mg/kg] 60 - 120 [mg Cu/kg] 1 km 30 - 60 [mg Cu/kg]

  6. Hydraulic behaviour ? SITE 505 AUTOROUTE 0,53 5 fév 97 0,48 1992 Urgent need of a 0,43 16-19 janv 97 HAUTEUR [m] 0,38 new measurement 0,33 system ! 0,28 0,23 0,18 Hydropix 0,13 0,08 monitoring project 0,34 0,54 0,74 0,94 1,14 VITESSE [m/s]

  7. Waterproof Resistance to corrosion Lighting Event ‐ based recording Intelligent filing Alarms Flow measurements Water level Surface water speed Remote viewing

  8. IP68 waterproof cameras Integrated IR illuminator Encoder

  9. Goals : use cameras for measurements Estimation of flow Water level Surface water speed

  10. Results Robust line detection Tested on real images Around 40 configurations Examples of results…

  11. CTI/KTI Project : 2.5 years EtriNex Videosurveillance Communications EPFL/ECOL : hydrology EAWAG : hydrology EPFL/BIG : image processing City of Lausanne Purchased a preliminary system

  12. Hardware : testing phase Image acquisition : OK Water level measurement Done : robust line detection To do : spatial calibration, in situ testing Surface water speed : to do Database management : to do Main program and GUI : to do

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.