Confidential Property of Schneider Electric | Page 1 Energy Savings Performance Contracts A Myth-busters Presentation Presented by: Justin Shutt 10/10/2019 Confidential Property of Schneider Electric A Balancing Act Facilities must compete


slide-1
SLIDE 1

Page 1 Confidential Property of Schneider Electric |

slide-2
SLIDE 2

Confidential Property of Schneider Electric

Presented by: Justin Shutt 10/10/2019

Energy Savings Performance Contracts

A Myth-busters Presentation

slide-3
SLIDE 3

A Balancing Act

Facilities must compete with a growing list of priorities

slide-4
SLIDE 4

Revenue Creation Measures

Cost Savings

Capital / Maintenance Needs

Cost Savings

Project Development Philosophy

Comprehensive Solution

Find cost efficiencies Resolve comfort & humidity issues Fund Priority Projects

slide-5
SLIDE 5
  • Time

‒ Individual scope items – procurement, etc. ‒ Staff limitations

  • Money

‒ Life cycle cost vs. low-bid ‒ Construction

  • Expertise

‒ Comprehensive solution ‒ 1 partner with vested interest in success ‒ Big company technology & innovation

Page 5 Confidential Property of Schneider Electric |

Myth: Projects could be tackled in house

slide-6
SLIDE 6

Page 6 Confidential Property of Schneider Electric |

The Value of Getting it All Done

slide-7
SLIDE 7
  • Savings are not real
  • Unclear savings calculations
  • Shared savings with the ESCO
  • Stipulated savings

Page 7 Confidential Property of Schneider Electric |

Myth: What savings?

  • Retrofit Isolation with Key Parameter Measurement
  • i.e. lighting savings x hours of operation algorithm

Option A

  • Retrofit Isolation wit All Parameter Measurement
  • All savings calculated with algorithm

Option B

  • Whole Facility Measurement
  • i.e. Energy consumption at meter before PC vs. after

Option C

  • Calibrated Simulation
  • i.e. advanced building models

Option D

International Performance Measurement & Verification Protocol

slide-8
SLIDE 8

Guarantee through Sept-2018: $1,811,618 Reconciled Savings through Sept-2018: $2,413,202 Exceeding Savings: $601,584

Page 8 Confidential Property of Schneider Electric |

M&V Savings Chart

slide-9
SLIDE 9
  • Can be funded however you want!
  • Tax Exempt Lease Purchase

‒ doesn’t count against bonded indebtedness

  • In-house financing team

‒ Grants // rebates // incentives

  • SC Treasurer’s Office – Master Lease Program
  • SC Energy Office – ConserFund+

Page 9 Confidential Property of Schneider Electric |

Myth: Expensive & Complicated Financing Model

slide-10
SLIDE 10

Page 10

Capital recovery and reinvestment opportunities:

Water Technologies Major HVAC Interior / Exterior LED Lighting and Occupancy Sensors IT and BAS Building envelope Sub metering and Resource Advisor Sustainability Services VoIP Streamline the district

  • perations

Athletic spaces & gyms are brighter and cooler Improved night-time safety due to brighter and more consistent exterior lighting Consistent temperatures throughout each school New technologies require less down-time and maintenance Brighter classrooms and indoor spaces Improve air quality and comfort in classrooms

slide-11
SLIDE 11
slide-12
SLIDE 12

After

Page 9

Before

slide-13
SLIDE 13

Page 7

After Before

slide-14
SLIDE 14

Page 8

After Before