community ope n house
play

Community Ope n House 10/ 28/ 2016 1 AGE NDA: Me e t & Gre e - PowerPoint PPT Presentation

Ma yo r K a sim Re e d T he De pa rtme nt o f Wa te rshe d Ma na g e me nt & Atla nta Me mo ria l Pa rk Co nse rva nc y Community Ope n House 10/ 28/ 2016 1 AGE NDA: Me e t & Gre e t Ope ning Re ma rks & I ntro duc


  1. Ma yo r K a sim Re e d T he De pa rtme nt o f Wa te rshe d Ma na g e me nt & Atla nta Me mo ria l Pa rk Co nse rva nc y Community Ope n House 10/ 28/ 2016 1

  2. AGE NDA:  Me e t & Gre e t  Ope ning Re ma rks & I ntro duc tio ns – Distric t 8 Co unc il Me mb e r Yo la nda Adre a n – De pa rtme nt o f Wa te rshe d Ma na g e me nt, Co mmissio ne r K ishia L . Po we ll – AMPC E xe c utive Dire c to r, Ca the rine Spillma n – Me mo ria l Pa rk T e c hnic a l Adviso ry Gro up me mb e rs, o the r Civic L e a de rs a nd Offic ia ls  De pa rtme nt o f Wa te rshe d Ma na g e me nt – Pre se nta tio n  Q&A  Clo sing Re ma rks 10/ 28/ 2016 2

  3. AMPT AG-DWM COL L ABORAT I VE T he Atla nta Me mo ria l Pa rk T e c hnic a l Adviso ry Gro up (AMPT AG) a nd the City o f Atla nta ’ s De pa rtme nt o f Wa te rshe d Ma na g e me nt (DWM) a re e ng a g e d in o ng o ing disc ussio ns a nd sc he dule d wo rksho ps a sso c ia te d with the fo llo wing g o a ls: 1. E limina te we t we a the r o ve rflo ws within a nd ne a r Me mo ria l Pa rk a nd within the Pe a c htre e Cre e k Se we r Ba sin; a nd 2. Pro te c t wa te r q ua lity in Pe a c htre e Cre e k 10/ 28/ 2016 3

  4. E PA/ E PD Co nse nt De c re e s  1995 la wsuit re sults in two (2) Co nse nt De c re e s • CSO Co nse nt De c re e (Se p 1998) – Pro je c t c o mple tio n b y 2008 (a c hie ve d) Re d uc e CSOs fro m 100/ yr. a t e a c h o f 6 fa c ilitie s to 4/ yr. o Ac hie ve wa te r q ua lity sta nd a rd s a t po int o f d isc ha rg e o • SSO Co nse nt De c re e (De c 1999) Pro je c t c o mple tio n b y 2027 (pe r a me ndme nt a ppro ve d 2012) Sto p 1000+ a nnua l se we r spills o Ac hie ve a re lia b le se we r syste m o Imple me nt MOMS pla n o 10/ 28/ 2016 4

  5. Cle a n Wa te r Atla nta : Ove rvie w • Re spo nsib le fo r the o ve ra ll ma na g e me nt o f the City’ s two Co nse nt De c re e s – CSO a nd SSO. • Cha rg e is to a ddre ss o pe ra tio n o f the City’ s wa ste wa te r fa c ilitie s a nd a ddre ss CSOs a nd SSOs within the c ity. • Re spo nsib le fo r pla nning , de sig n, a nd c o nstruc tio n o f impro ve me nts to the City's wa ste wa te r c o lle c tio n syste m, a s we ll a s e nviro nme nta l c o mplia nc e a nd re po rting to c o mply with the Co nse nt De c re e s. 10/ 28/ 2016 5

  6. Cle a n Wa te r Atla nta : Go a l • Cle a n Wa te r Atla nta re c o g nize s tha t Atla nta ’ s e c o no mic g ro wth, jo b s, a ffo rda b ility a nd q ua lity o f life a ll de pe nd o n c le a n wa te r. • As suc h, the a im o f Cle a n Wa te r Atla nta is to de ve lo p a nd imple me nt a lo ng -te rm pla n to e nsure hig h q ua lity drinking wa te r fo r Atla nta , a nd c le a n stre a ms a nd wa ste wa te r flo ws fo r Atla nta a nd its do wnstre a m ne ig hb o rs. • T he a mb itio n o f Cle a n Wa te r Atla nta is to c o ntinue e ffo rts to c re a te the c le a ne st urb a n stre a ms a nd rive rs in the c o untry a nd o pe ra te a “Be st I n Cla ss” utility. 10/ 28/ 2016 6

  7. Pe a c htre e Cre e k Se we r Ba sin: Ove rvie w  T he Pe a c htre e Cre e k Ba sin is o ne o f (10) se we r b a sins a nd is lo c a te d in the no rthe rn po rtio n o f the City’ s se we r syste m.  Wa ste wa te r flo ws c o lle c te d within the Pe a c htre e Cre e k Ba sin a re c o nve ye d to the Pe a c htre e Cre e k T runk Syste m a nd o nwa rd to RM Cla yto n WRC fo r tre a tme nt.  Wa ste wa te r g e ne ra te d b y De ka lb Co unty is a lso c o nve ye d thro ug h City trunk a nd re lie f se we rs to the RM Cla yto n WRC a nd is c o ve re d b y the te rms o f a n inte r- jurisdic tio na l (I -J) a g re e me nt 10/ 28/ 2016 7

  8. Pe a c htre e Cre e k Se we r Ba sin: Dra ina g e Are a 96” Atla nta De Ka lb Pipe is 2/ 3 F ull Co unty Dry We a the r F lo w in DeKalb County Pe a c htre e T runk 61.1 Sq. Mile s Atla nta 96” De Ka lb City of Atlanta Co unty Pipe is F ull 33.5 Sq. Mile s 1.5” o f Ra in in Pe a c htre e Ba sin City of De Ka lb County T ota l Atla nta Dra ina g e a re a to 33.5 sq . mi. 61.1 sq . mi. 94.6 sq . mi. Pe a c htre e Cre e k Ba sin Ave ra g e Dry We a the r F lo w 20 MGD 23 MGD 43 MGD 10/ 28/ 2016 8

  9. Pe a c htre e Cre e k Se we r Ba sin – Se we r Ne two rk Me mor ia l Pa r k Se we r s date bac k to e ar ly 1900’s. Post-1970’s 10/ 28/ 2016 9

  10. De c e mb e r 24 - 25, 2015 – Ra in E ve nt • L a rg e re pe a te d ra infa ll e ve nts; 5 inc he s o ve r 2 da ys • F lo o ding fro m Pe a c htre e Cre e k • Co nstra ints a t RM Cla yto n WRC • 10:30a m - the c re e k ro se b e yo nd its b a nks spre a ding into the pla yg ro und a nd into the se we r • ~10:50a m, the ma nho le b e g a n to o ve rflo w whe n the c re e k wa s ~ 1.5 ft o ve r the ma nho le rim Estimated flood stage on Dec 24, 2015 1.5’ Manhole Typical stage during 17.5’ dry weather flows Memorial Park Ground Surface 14’ Peachtree Creek 2-3’ Sewer Pipe 10/ 28/ 2016 10

  11. T HE PAT H F ORWARD T he City De pa rtme nt o f Wa te rshe d Ma na g e me nt is c o mmitte d to a c hie ving the g o a l to e limina te we t we a the r-re la te d se we r o ve rflo ws within Me mo ria l Pa rk a nd the Pe a c htre e Cre e k Ba sin. T he City ha s de ve lo pe d a c o mpre he nsive list o f c o mple te d, pla nne d, a nd po te ntia l pro je c ts, a s we ll a s the ir e xpe c te d b e ne fic ia l impa c ts to c o ntinue e ffo rts to wa rds a c hie ving this g o a l. 10/ 28/ 2016 11

  12. (12) COMPL E T E D PROJE CT S PROJE CT BE NE F ICI AL IMPACT Histo ric a l Re ha b ilita tio n – E a rly – Mid 1990’ s (Va rio us CI PP) E limina te d struc tura l de fe c ts fo und during SSE S a nd re duc e I / I No rth F o rk Pe a c htre e Cre e k Re lie f Se we r I mpro ve me nts – 2001 Pro vide d se we r syste m c a pa c ity pe r de sig n sto rm -- e limina te we t we a the r se we r o ve rflo ws F a irmo nt/ Glidde n Se we r Se pa ra tio n – 2001 Re duc e d CSOs a nd impro ve d wa te r q ua lity Orme Stre e t T runk Re lie f Se we r I mpro ve me nts - 2002 Pro vide d se we r syste m c a pa c ity pe r de sig n sto rm -- e limina te we t we a the r se we r o ve rflo ws So uth F o rk Pe a c htre e Cre e k T runk Re lie f Se we r I mpro ve me nts– 2003 Pro vide d se we r syste m c a pa c ity pe r de sig n sto rm -- e limina te we t we a the r se we r o ve rflo ws I ndia n Cre e k Re lie f Se we r I mpro ve me nts - 2003 Pro vide d se we r syste m c a pa c ity pe r de sig n sto rm -- e limina te we t we a the r se we r o ve rflo ws Se we r Gro up One (SG1) Sma ll Dia me te r Re ha b ilita tio n – 2008 E limina te d struc tura l de fe c ts fo und during SSE S a nd re duc e I / I We st CSO T unne l & WQCF – 2009 Pro vide d c o mb ine d syste m sto ra g e fo r pe a k we t we a the r flo w a wa iting a dditio na l tre a tme nt Old F o urth Wa rd Po nd – 2011 Re duc e d pe a k we t we a the r flo w to c o mb ine d se we r syste m Se we r Gro up T wo (SG2) Sma ll Dia me te r Re ha b ilita tio n – 2011 E limina te d struc tura l de fe c ts fo und during SSE S a nd re duc e I / I Pe a c htre e T runk Re lie f Se we r Re ha b ilita tio n (Bo b b y Jo ne s Go lf Co urse ) CI PP line r insta lle d to a lle via te se we r disc ha rg e to c re e k – 2014 L idde ll Pe a c htre e Cre e k Sto ra g e F a c ility & Pump Sta tio n - 2014 Re duc e d pe a k we t we a the r flo w to Pe a c htre e Cre e k T runk syste m. 10/ 28/ 2016 12

  13. PL ANNE D PROJE CT S: Unde rwa y 1. RM Cla yto n WRC He a dwo rks: Sc ope : • Co nstruc t ne w pla nt he a dwo rks Be ne fic ia l Impa c t: • I mpro ve flo w hydra ulic s a nd c a pa c ity e nte ring the fa c ility • I mpro ve g rit re mo va l a nd re duc e the da ma g ing e ffe c ts o f g rit o n sub se q ue nt unit pro c e sse s • I nsta lla tio n o f ne w influe nt flo w mo nito ring e q uipme nt to a c c ura te ly mo nito r flo ws Sc he dule : • Co nstruc tio n: Sta rt – Qtr. 1 2014; Co mple te – Qtr. 2 2018 10/ 28/ 2016 13

  14. PL ANNE D PROJE CT S: Unde rwa y 2. Pe a c htre e Cre e k T runk Sta b iliza tio n: Sc ope : • Cle a n: 700 L F o f 96 “ pipe , 1,300 L F o f 90” pipe , a nd 1,800 L F o f 66” pipe . • Insta lla tio n o f a ppro x. 11,000 L F o f g ro ute d PVC pro file line r syste m • Cle a n Wo o d wa rd Wa y Sipho n tha t is lo c a te d within the vic inity o f Bo b b y Jo ne s Go lf Co urse . RM Cla yton WRC Be ne fic ial Impac t: Me moria l Pa rk • Re d uc e I/ I fro m e nte ring se we r a nd ro b b ing ne e d e d c a pa c ity • Sa fe g ua rd a g a inst future b re a c he s a nd e nsure s pub lic he a lth a nd sa fe ty • e nsure s lo ng -te rm struc tura l inte g rity o f 90” d ia me te r trunk se we r fo r 50+ ye a rs Sc he dule : • Pro c ure Co nstruc tio n: Qtr. 4 2016 • Awa rd : Qtr. 2 2017 • Co nstruc tio n: Sta rt - Qtr. 2 2017; Co mple te – Qtr. 4 2018 10/ 28/ 2016 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend