Commercial Balancing Services Group Place your chosen image here. - - PowerPoint PPT Presentation

commercial balancing services group
SMART_READER_LITE
LIVE PREVIEW

Commercial Balancing Services Group Place your chosen image here. - - PowerPoint PPT Presentation

Commercial Balancing Services Group Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 3 rd December 2014 Chair: Mike Edgar


slide-1
SLIDE 1

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Commercial Balancing Services Group

3rd December 2014 Chair: Mike Edgar

slide-2
SLIDE 2

Introductions and welcome

 Introductions  Admin

Fire alarm Lunch

 Agree minutes of last meeting  Review of previous actions

2

slide-3
SLIDE 3

Agenda

 Prioritisation of Development Areas  STOR Runway  FFR Developments  Update on future developments Power Available CMP237 “REP for Low Fuel Cost Generation” SBR/DSBR Anglo-Scots Intertrip Strategic Demand Side Review Project  AOB

3

slide-4
SLIDE 4

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Prioritisation of Development Areas

Adam Sims

slide-5
SLIDE 5

Prioritisation of Development Areas

 List of areas included in the Terms of Reference  Request attendees provide some feedback on:

A) Which areas would you like to see development in and what? B) What priority would you give development of each area?

 Please fill in the forms on the desk or email adam.sims@nationalgrid.com

5

slide-6
SLIDE 6

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

STOR Runway

Paul Lowbridge

slide-7
SLIDE 7

STOR MARKET

Main STOR Tender Round

7

Introduction

STOR RUNWAY

Envelope contract for growth

  • f Demand Side Reserve

volume

STOR MARKET

Delivery of Accepted STOR volume PROCUREMENT DELIVERY

STOR MARKET

slide-8
SLIDE 8

STOR MARKET

Main STOR Tender Round

8

Introduction

STOR RUNWAY

Envelope contract for growth

  • f Demand Side Reserve

volume

STOR MARKET

Delivery of Accepted STOR volume PROCUREMENT DELIVERY

STOR MARKET

TENDER ROUND 25 YEAR 9 YEAR 10

slide-9
SLIDE 9

9

Drivers for STOR Runway

Barriers to Growth in STOR market

1

Future STOR competitiveness

3

Demand-Side volume: bridging a gap

2

slide-10
SLIDE 10

10

Collaborative Design Process

August September October November December

First Draft design shared Drivers identified and Trial approach confirmed in NG Concept shared with industry Design comments and discussion via numerous platforms

Operational Forum

Design Finalised

Invitation to Tender

slide-11
SLIDE 11

11

Contact Us

Website LinkedIn Email

http://www2.nationalgrid.com/UK/Services/Balancing-services/Reserve- services/Short-Term-Operating-Reserve/STOR-Runway/

“STOR Runway (National Grid)” Paul.Lowbridge@nationalgrid.com

slide-12
SLIDE 12

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Additional Information

slide-13
SLIDE 13

13

STOR Runway: Concept Diagram

STOR Year 9 STOR Year 10

STOR Tender Round (25) MW Available MW Available

100MW 200MW Invitation To Tender Market Day

STOR Runway

Contract Award DEC 14 JAN 15 MAR 15 APR 15 APR 16 1 2 3 4 5 6

30 15 30 30 15 15 9 9

slide-14
SLIDE 14

14

Key Dates

5th December 2014 Final design comments ahead of ITT 12th December 2014 Invitation to Tender Published: Tender Open 16th January 2015 Market Day: Tender Closes 6th March 2015 Tender Results & Contract Awards 16th March 2015 Notifications for Growth Gate 1 4th May 2015 Growth Gate 1 live

slide-15
SLIDE 15

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

FFR Developments

Adam Sims / Gareth Jenkins

slide-16
SLIDE 16

FFR Developments

 Move to e-tendering platform for February tender

Market Day 2nd February

 Similar format to STOR e-tender  Will still be able to use paper tenders initially, although the intention is to phase these out  Link to Ariba web portal will be added to FFR website and communicated in January FFR Market Report

16

slide-17
SLIDE 17

FFR Developments

 Interest received from non-BM aggregators to enter FFR market, however minimum of 10MW is a barrier  We are therefore developing a fixed-term bilateral growth contract with an agreed price to facilitate entry into FFR market

Duration for 1 year or when 10MW achieved Minimum of 1MW required to sign up Separate services available: P/S/H, static/dynamic, day/night Fixed price

 Aim to publish more information in December

17

slide-18
SLIDE 18

FFR Developments

 Currently, tenders have to be for bundled products, i.e. Primary & High or Primary, Secondary & High  Anecdotal evidence that there are parties who can only provide individual products  Would splitting out Primary, Secondary and High increase liquidity in the FFR market?  Intention to investigate this once the e-tendering platform is established

18

slide-19
SLIDE 19

FFR Developments

 Rapid Frequency Response (<5 second response)  Presented to GCRP 19 November  Updated analysis of 2020/21 indicates a benefit from RFR on 60% of summer days and 24% of winter nights  However, no consensus as to whether this should be a mandatory service

Proposal to raise a new GC workgroup in April (GC0087)

 Therefore National Grid will look to develop a commercial service in the new year

RFR analysis now focused on technical requirements, testing process and tender assessment

19

slide-20
SLIDE 20

20

Market Information Reports

 Produced every month for a range of services to assist service providers  Aim: To give service providers the right information in a clear concise manner so that they may tender for services confident that they know what National Grid value and can offer a competitive price accordingly  We want to improve them for the customer

slide-21
SLIDE 21

Your opinion is important!

 Do you use the Market Information Reports? If you don’t, why not?  How do you use them?  Which parts of the report are most useful/least useful?  When would be the most helpful/convenient time to publish the reports?  Are these reports clear and relevant?  Any other feedback on what you would like to see in the reports?

21

slide-22
SLIDE 22

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Update: Power Available GC0063

Adam Sims

slide-23
SLIDE 23

Background

 By 2020, for significant periods of time very little conventional flexible generation is forecast to be running

Faster adoption of renewables will bring these timescales forwards

 Alternative sources of ancillary services must be secured  It will be more likely that wind will be the marginal plant, and hence the most economic provider of balancing services

23

slide-24
SLIDE 24

24

Low Frequency Response from a Wind Farm - during test using Power Available

Frequency Deviation (Hz)

  • 0.5

Time (s) Time (s) Generated Wind Power (MW)

  • 0.25

T0 Tf Ti1 Ti2

Frequency Deviation Period of Bid

Power available BOA instruction Frequency response

  • utput for 0.5Hz

deviation Frequency response

  • utput for 0.25Hz

deviation Frequency response capability reduced because of reduction in Power Available Test Frequency injection for 0.25Hz deviation Test Frequency injection for 0.5Hz deviation

slide-25
SLIDE 25

Power Available Signal Calculate a signal representing the instantaneous sum

  • f the potential Active Power available
  • Option 1 ( Standardisation of MEL)

Standardisation of MEL which would require MEL submissions that would be expected to vary with forecast intermittent energy source, where the update frequency was a variable to be determined by the User

  • Option 2 (Dynamic MEL)

Dynamic MEL (Power Available signal used to calculate MEL), with an update frequency of [10 minutes];

  • Option 3 (SCADA)

Power Available Data via SCADA i.e. the submission of Power Available as an operational metering signal which would be fed to the National Grid Control Centre via SCADA with the redefinition

  • f MEL used to indicate electrically connected capacity.

25

slide-26
SLIDE 26

26

Conclusions

 Option 3 is still the preferred way forward:

Option 1 does not give consistent improvement Option 2 is more complex/costly for existing generators ‘Do nothing’ is not an option – defect has been well defined

 This will apply to new intermittent generators from April 2016 onwards  Trialling not included – did not appear to be an appetite for this and in effect already proven  May facilitate a future BSC modification if considered necessary (eg in the light of cashout review) – to settle BOAs against Power Available rather than FPNs

slide-27
SLIDE 27

27

Next Steps

 Revised report circulated to workgroup and GCRP  Workgroup were asked two questions:

Should we reconsult? No, sufficient engagement has taken place and the conclusion has not changed Does the outcome need to be presented to GCRP again? Yes, since it addresses the points raised at GCRP in May

 Next steps: Submit report to authority Consider lessons learned for a subsequent GCRP

slide-28
SLIDE 28

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Update: SBR/DSBR

Adam Sims

slide-29
SLIDE 29

DSBR & SBR

Winter 14/15  Agreed 14/15 contracts result in 1.1GW of “additional” de-rated capacity across both DSBR and SBR  14/15 contracts now active and being proactively tested Winter 15/16  1st 15/16 tender in progress. We have tendered for 50% (900MW) of the 1,800MW requirement identified in June 2014.  Open to DSBR and SBR in parallel – closes Friday 5th December 2014  Aiming to announce conditional results prior to the CM auction opens on 16th December  Second tender scheduled for Spring 2015  Third tender round in the summer/autumn if required

slide-30
SLIDE 30

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Update: CMP237 Response Energy Payment

Adam Sims

slide-31
SLIDE 31

Response Energy Payment

 Concerns with some wind generators pricing themselves out of the response market  One reason given is the calculation of the REP, which is supposed to reflect the cost of providing the energy  REP is predicated on conventional generation, i.e. where a fuel is consumed at a cost

For an increase in output, generator receives MIP*1.25 For a decrease in output, generator pays MIP*0.75

 For low fuel cost plant (e.g. wind) the REP calculation is not cost reflective

31

slide-32
SLIDE 32

Annual Spend on Response

32

Of which, total REP spend: £1.54M

slide-33
SLIDE 33

Why is this a Problem?

 The REP does not reflect the costs experienced by these generators in providing frequency response  This is deterring participation in the response market by members of a sizeable and growing market segment  Lack of liquidity in the market will result in increased balancing costs  Some wind generators are pricing themselves out of the market entirely

33

slide-34
SLIDE 34

Submitted Holding Price Bands (Primary)

34 Primary MFR Holding Price Merit Order Price Bands

20 40 60 80 100 120 140 160 180 200 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14

Number of Units

1000+ 100-1000 10-100 5-10 4-5 3-4 2-3 1-2 0-1

[£/MW/h]

slide-35
SLIDE 35

Submitted Holding Price Bands (Primary)

35

slide-36
SLIDE 36

36

Proposed Change

 For plant with no fuel cost, the REP is settled at £0/MWh  No change to plant with a fuel cost

slide-37
SLIDE 37

What plant should be included?

37

Fuel Cost No Fuel Cost Gas Onshore Wind Coal Offshore Wind Oil Solar Nuclear Tidal Biomass Wave Electricity Storage (e.g. pumped storage, batteries) Hydro

slide-38
SLIDE 38

Workgroup Options

 Original: Remove REP from wind, solar, wave and hydro  Option 1: Remove REP from wind, solar, wave  Option 2: Remove REP from wind, solar, wave and hydro, but allow them a choice to opt-in  Option 3: Remove REP from wind, solar, wave, but allow them a choice to opt-in  Further question for Options 2 & 3 as to when the opt-in would be allowed

38

slide-39
SLIDE 39

Next Steps

 Workgroup consultation is due to be published 8th December for four weeks  Deadline for responses 5th January  Aim is to return to the CUSC Panel in February  Anticipated Ofgem determination April/May

39

slide-40
SLIDE 40

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Update: Commercial Intertrips

Adam Sims

slide-41
SLIDE 41

Commercial Intertrips

Commercial Intertrip Requirement

 SPT and SHETL have been asked to commence work on the infrastructure for the scheme on Whitlee, Backlaw, Griffin and Crystal Rigg.  Further consideration being given to include Fallago Rigg in this scheme  First delivery expected April 2015  Contractual discussions underway with the abovementioned generators

Windfarms Connecting into Heysham

 Discussions still ongoing with a number of wind farms connecting into Heysham to utilise the existing intertripping scheme outside of cap 76 conditions under a commercial framework.

41

slide-42
SLIDE 42

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Update: Strategic Demand Side Review

Adam Sims

slide-43
SLIDE 43

Strategic Demand Side Review Project

 There are limited fully integrated information systems to contract, optimise, despatch and settle Non-BM (DSR) FCDM & SRD: rigid capability / functionally  National Grid are considering the existing and future IS

  • ptions to innovate and increase DSR balancing

service contracting

Flexible, within day and day ahead, variable parameters

 Feasibility study has been completed, design stage will be completed by summer 2015

slide-44
SLIDE 44

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Future CBSG Meetings

Chrissie Brown

slide-45
SLIDE 45

Next CBSG Meeting

 First week of March (2nd – 6th)  If you would like to raise a topic for discussion, please contact adam.sims@nationalgrid.com or christine.brown1@nationalgrid.com  Please remember to feed back your development priority areas!

45

slide-46
SLIDE 46

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

AOB