CMP202 Revised Treatment of BSUoS for Lead Parties of Interconnector - - PowerPoint PPT Presentation

cmp202 revised treatment of bsuos for lead parties of
SMART_READER_LITE
LIVE PREVIEW

CMP202 Revised Treatment of BSUoS for Lead Parties of Interconnector - - PowerPoint PPT Presentation

CMP202 Revised Treatment of BSUoS for Lead Parties of Interconnector BM Units Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. CUSC


slide-1
SLIDE 1

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

CMP202 Revised Treatment of BSUoS for Lead Parties of Interconnector BM Units

CUSC Panel – 16th December 2011 Andy Wainwright

slide-2
SLIDE 2

2

Background

EU “Third Package” objectives:

Facilitating cross-border access; Developing Europe-wide internal market in electricity.

slide-3
SLIDE 3

3

Summary of Defect

Current arrangements can potentially lead to:

A restriction on Interconnector flows, particularly exports; A restriction to trade, in particular, for non physical parties.

slide-4
SLIDE 4

4

Proposed CUSC Modification

Remove BSUoS charges from Interconnector lead party BM Units.

slide-5
SLIDE 5

5

Justification against Applicable CUSC Objectives

Relevant objective (a): Facilitate effective competition: Promotes more efficient trading across EU Member States; Remove any perverse incentive for limited / inefficient trade from attempts to manage BSUoS exposure. Relevant objective (c): transmission business developments & duties under “Third Package” Facilitates EU objectives of single market; Facilitating cross-border trade.

slide-6
SLIDE 6

6

Code Administrator Proposed Progression

The Panel is asked to:

AGREE the establishment of a Workgroup to develop the proposal

slide-7
SLIDE 7

7

Code Administrator Proposed Timetable

Present Workgroup report to CUSC Modifications Panel 27 April 2012 Submit final Workgroup report to Panel Secretary 19 April 2012 Deadline for comment on Workgroup report 5 April 2012 Circulate draft Workgroup Report (2 week comment due to Easter period) 22 March 2012 Post-consultation Workgroup meeting W/C 12 March 2012 Deadline for responses to Workgroup consultation 8 March 2012 Publish Workgroup consultation (for 3 weeks) 16 February 2012 Deadline for comments on draft Workgroup Consultation 13 February 2012 Issue draft Workgroup Consultation for Workgroup comment (5 days) 6 February 2012 Second Workgroup meeting (if required) W/C 30 January 2012 Workgroup meeting W/C 9 January 2012 Panel to agree progression 16 December 2011

slide-8
SLIDE 8

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Questions?