CMP202 Revised Treatment of BSUoS for Lead Parties of Interconnector BM Units Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. CUSC


  1. CMP202 Revised Treatment of BSUoS for Lead Parties of Interconnector BM Units Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. CUSC Panel – 16 th December 2011 Andy Wainwright

  2. Background � EU “Third Package” objectives: � Facilitating cross-border access; � Developing Europe-wide internal market in electricity. 2

  3. Summary of Defect � Current arrangements can potentially lead to: � A restriction on Interconnector flows, particularly exports; � A restriction to trade, in particular, for non physical parties. 3

  4. Proposed CUSC Modification � Remove BSUoS charges from Interconnector lead party BM Units. 4

  5. Justification against Applicable CUSC Objectives � Relevant objective (a): Facilitate effective competition: � Promotes more efficient trading across EU Member States; � Remove any perverse incentive for limited / inefficient trade from attempts to manage BSUoS exposure. � Relevant objective (c): transmission business developments & duties under “Third Package” � Facilitates EU objectives of single market; � Facilitating cross-border trade. 5

  6. Code Administrator Proposed Progression � The Panel is asked to: � AGREE the establishment of a Workgroup to develop the proposal 6

  7. Code Administrator Proposed Timetable 16 December 2011 Panel to agree progression W/C 9 January Workgroup meeting 2012 W/C 30 January Second Workgroup meeting (if required) 2012 6 February 2012 Issue draft Workgroup Consultation for Workgroup comment (5 days) 13 February 2012 Deadline for comments on draft Workgroup Consultation 16 February 2012 Publish Workgroup consultation (for 3 weeks) 8 March 2012 Deadline for responses to Workgroup consultation W/C 12 March 2012 Post-consultation Workgroup meeting 22 March 2012 Circulate draft Workgroup Report (2 week comment due to Easter period) 5 April 2012 Deadline for comment on Workgroup report 19 April 2012 Submit final Workgroup report to Panel Secretary 27 April 2012 Present Workgroup report to CUSC Modifications Panel 7

  8. Questions? Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.