SLIDE 14 5/21/2018 14
MPO Short- & Mid-term Project Priorities
2018 Rank Facility (Project) Project Limits Improvement Description Next Phase Requesting Jurisdiction 17 Central Manatee Network Alternatives Analysis (CMNAA) from 26th St W to Braden River and 17th Ave W to 17th St W Implementation Bradenton, Manatee County, Palmetto
- b. US 41/1st St, 3rd St W, US 41
BUS/9th St W at SR 64/Manatee Ave, 6th Ave, 8th Ave, 9th Ave Operational Improvements PE/CST Bradenton, Palmetto, Manatee County
at SR 64/Manatee Ave, 3rd Ave, 8th Ave, and 9th Ave; Desoto Bridge south
- f the limited access segment of US 301 S
Operational, Safety, Bicycle, and Pedestrian Improvements STUDY Bradenton
at 6th Ave/Manatee Ave and between 8th Ave W and 9th Ave W New Signal PE/CST Bradenton
at SR 64/Manatee Ave and from north 8th Ave/US 41 BUS to south of 8th Ave Operational, Safety, Bicycle, and Pedestrian Improvements PE/CST Bradenton
within CMNAA boundaries Safety Improvements PE Bradenton, Palmetto
from 24th St W to 24th St E Safety, Bicycle, and Pedestrian Improvements STUDY Bradenton
from Lincoln Middle School to Lincoln Community Park Safety and Pedestrian Improvements PE Palmetto
- c3. SR 64/Manatee Ave and 6th
Ave/Manatee Ave at Various locations Safety, Bicycle, and Pedestrian Improvements STUDY Bradenton
at Desoto Bridge, US 41/US 301 and the US 41/US 19 Safety, Bicycle, and Pedestrian Improvements CST Palmetto
from Downtown Bradenton to US 41 south corridor, north of 8th Ave Safety, Bicycle, and Pedestrian Improvements CST Bradenton
within CMNAA boundaries Bicycle and Pedestrian Improvements PE Bradenton, Palmetto
from 12th St W to D‐Street Bicycle and Pedestrian Improvements STUDY Palmetto
at Riverside Dr and 8th Ave Bicycle and Pedestrian Improvements STUDY Palmetto
from 2nd Ave to US 41 north and south; and from 20th Ave @ to 9th Ave W Pedestrian Improvements STUDY Palmetto
at 8th Ave W and 2nd Ave W Bicycle Improvements PE/CST Palmetto
from SR 64/Manatee Ave, to the west by 10th St, to the east by 12th St and to the north by the Manatee River Multi Modal Capacity PE/CST Bradenton
- c2. Safety and Pedestrian Improvements
- c4. Safety, Bicycle, and Pedestrian Improvements
- d1. Bicycle and
Pedestrian Improvements
Pedestrian Improvements
Improvements
Improvements
MPO Short- & Mid-term Project Priorities (Palmetto)