CMNAA Study Area Nor the r n limit: 17 th Stre e t We st Ma na te - - PDF document

cmnaa study area
SMART_READER_LITE
LIVE PREVIEW

CMNAA Study Area Nor the r n limit: 17 th Stre e t We st Ma na te - - PDF document

5/21/2018 City of Palmetto Commission May 21, 2018 Workshop CMNAA Study Area Nor the r n limit: 17 th Stre e t We st Ma na te e County E aste r n limit: City of Pa lme tto E lle nto n Gille tte Ro a d City of Bra de nton Palmetto


slide-1
SLIDE 1

5/21/2018 1

May 21, 2018 Workshop

City of Palmetto Commission

CMNAA Study Area

Ma na te e County City of Pa lme tto City of Bra de nton

Nor the r n limit:

17th Stre e t We st

E aste r n limit:

E lle nto n Gille tte Ro a d

Southe r n limit:

17th Ave nue We st

We ste r n limit:

26th Stre e t We st

T he Study Are a is Ce ntra l to T a mpa Ba y Re g ion a nd Be a c he s

Palmetto Bradenton

slide-2
SLIDE 2

5/21/2018 2

Goals & Objectives

  • Re d uc e c o ng e stio n
  • E

nha nc e d mo b ility fo r all use rs

  • Co nte xt-se nsitive a ppro a c h
  • Co nsiste nt with future visio n
  • F
  • ste r e c o no mic de ve lo pme nt
  • E

nha nc e c o mmunity c o he sio n

  • Co mmunity suppo rt

CMNAA Study Results

Multi-modal Planning Process

Sa fe ty

  • 9 c o rrido r sa fe ty a udits
  • Ac tio na b le re c o mme nda tio ns
  • ADA a c c e ssib ility impro ve me nts

Ve hic ula r Ca pa c ity

  • Do wnto wn Bra de nto n

Ope ra tio na l I mpro ve me nts

  • Othe r sho rt- & mid-te rm

re c o mme nda tio ns

Bic yc le & Pe de stria n

  • Are a -wide Bic yc le Syste ms Pla n
  • Sid e wa lk c o nne c tivity
  • Ac c e ss to tra nsit
  • Co mple te Stre e ts c o rrido rs
  • BUI

L D Gra nt Applic a tio n

T ra nsit

  • Se rvic e a nd a c c e ssib ility

re c o mme nda tio ns

Bridg e Optio ns fo r the L

  • ng -T

e rm

  • I

de ntifie d po te ntia l lo c a tio ns & impa c ts

  • E

ng a g e d with sta ke ho ld e rs

  • Se t the sta g e fo r a future PD&E

Study

slide-3
SLIDE 3

5/21/2018 3

Southbound Flows Northbound Flows

Understanding the Problem: Local facilities serving regional travel needs

1 in 3 ve hic le s (33% ) c rossing the Gre e n a nd De soto Bridg e s a re non- loc a l trips 44,000 E xisting

F utur e Ye a r 2040

35,000

Future Daily Traffic

Trips across the Manatee River

102,000 64,500

* Assume s De soto Bridg e re pla c e me nt w/ 6- la ne s

Green Bridge Desoto Bridge

Palmetto Bradenton

Re g iona l Pe rspe c tive

Gre e n + De so to I

  • 75

T

  • ta l:

146,000 139,000 285,000

Project Need: Future growth & increased pressure

  • De so to Bridg e c a rrie s 30%
  • f a ll tra ffic c ro ssing the

Ma na te e Rive r

  • Gre e n & De so to Bridg e

tra ffic will e xc e e d I

  • 75

vo lume s b y 2040

slide-4
SLIDE 4

5/21/2018 4

Summary of CMNAA efforts on Bridge Crossing Alternatives

I

de ntifie d c o rrido rs

Mo de le d a lte rna tive s Asse sse d tra nspo rta tio n b e ne fits /

c o ng e stio n re lie f

E

va lua te d po te ntia l impa c ts

E

ng a g e d with the c o mmunity

Desoto Corridor Corridor A Corridor B

Long-term Recommendations

for Project Development & Environment (PD&E) Study

Desoto Corridor Corridor A Corridor B

  • All a lte rna tive s re ma in unde r c o nside ra tio n
  • No a lte rna tive s ha ve b e e n e limina te d
  • T

he PD&E

Study pha se will a ddre ss:

  • Co rrido r se le c tio n
  • Alig nme nt ide ntific a tio n
  • Bridg e type / lo c a tio n / numb e r o f la ne s
  • Suppo rting infra struc ture ne e ds
  • Co mmunity suppo rt
  • E

nviro nme nta l fa c to rs

  • Curre ntly pro g ra mme d in F

isc a l Ye a r 2022 / 2023

slide-5
SLIDE 5

5/21/2018 5

Potential Timelines

Desoto Bridge Replacement

  • E

sta blishe d ne e d

  • PD&E

Pha se : Ca te g oric a l E xc lusion (2+ ye a rs)

  • Pote ntia l to ove rla p De sig n

with PD&E

  • E

sta blishe d ne e d

  • PD&E

Pha se : Ca te g oric a l E xc lusion (2+ ye a rs)

  • Pote ntia l to ove rla p De sig n

with PD&E

10+ Ye ar s

Desoto Corridor Corridor B Corridor A

De soto Corridor

  • PD&E

Pha se : E nvironme nta l Asse ssme nt (3+ ye a rs)

  • Pote ntia l to ove rla p De sig n

with PD&E , minimize d R/ W

  • PD&E

Pha se : E nvironme nta l Asse ssme nt (3+ ye a rs)

  • Pote ntia l to ove rla p De sig n

with PD&E , minimize d R/ W

12+ Ye ar s

New 3rd Bridge Crossing

  • PD&E

Pha se : E nvironme nta l Impa c t Sta te me nt (Min. 7 ye a rs)

  • De sig n a nd R/ W Pha se s

(4- 6 ye a rs)

  • Construc tion (2- 3 ye a rs)
  • PD&E

Pha se : E nvironme nta l Impa c t Sta te me nt (Min. 7 ye a rs)

  • De sig n a nd R/ W Pha se s

(4- 6 ye a rs)

  • Construc tion (2- 3 ye a rs)

15+ Ye ar s

Othe r Corridors *Contingent upon available funding

Next Steps: Project Development

F Y 22/ 23

slide-6
SLIDE 6

5/21/2018 6

Improving Downtown Circulation

Summary of Short-Term Operational Improvements

Addressing Today’s Congestion

Downtown Bradenton Operational Improvements

Travel Time & Delay Savings

Ne twork De la ys (2017 Volume s) E xisting Ne twork (hours) Short-te rm Improve me nts (hours) Improve me nt % from E xisting AM Pe ak Hour (from 7 to 8)

182 116 36%

PM Pe ak Hour (from 5 to 6)

221 125 43%

12% 31% 39% 50% 1% 2% 27% 27% 8% 10% 25% 34%

* Travel time reductions from VISSIM Analysis of Existing Peak Season Traffic Volumes (2017)

slide-7
SLIDE 7

5/21/2018 7

Multi-modal Emphasis

  • Co mple te pro g ra m o f so lutio ns:
  • Pe de stria n
  • Bic yc le
  • Auto
  • T

ra nsit

  • Ba la nc e mo b ility ne e ds o f a ll

use rs with lo ng -te rm visio n o f the surro unding c o mmunitie s

  • E

mpha sis o n sa fe ty

Sa fe ty Bic yc le & Pe de stria n

Issues Identification & Visioning

47% 24%

slide-8
SLIDE 8

5/21/2018 8

Issues Identification & Visioning

Co mmunity Visio n So c io -e c o no mic T ra nsit

Roa dwa y Sa fe ty Asse ssme nts:

1. 14th St. W fr

  • m 17th Ave . W to SR 64

(Manate e Ave .) 2. 9th St. W fr

  • m 17th Ave . W to SR 64

(Manate e Ave .) 3. US 41 fr

  • m 17th Ave . W to US 301 / US 41

inte rc ha ng e 4. SR 64 (6th Ave . W/ E ) fr

  • m 15th St. W to

15th St. E 5. SR 64 (Manate e Ave .) fr

  • m 15th St. W

to 15th St. E 6. 8th Ave . W fr

  • m Rive r

side Dr . to 17th St. W 7. US 301 c orridor c omple te d by othe rs

Safety

slide-9
SLIDE 9

5/21/2018 9

CMNAA Bicycle Systems Plan (Palmetto)

Neighborhood Bicycle/Pedestrian Recommendations

  • 9 c ommunity ne ig hbor

hood pr

  • je c t

she e ts de ve lope d

  • Po te ntia l ne w/ e nha nc e d pe de stria n c ro ssing s
  • Pro po se d b ic yc le impro ve me nts
  • Pro po se d side wa lk impro ve me nts
  • Ove rvie w of proje c ts to be a dva nc e d
  • L

ist those inc lude d

  • I

te m # 17 fro m MPO’ s list

slide-10
SLIDE 10

5/21/2018 10

Neighborhood Bicycle and Pedestrian Recommendations (Palmetto)

  • 9 c o mmunity ne ig hb o rho o d pro je c t she e ts de ve lo pe d fo r Pa lme tto a nd Bra de nto n
  • Co mmunitie s within Pa lme tto
  • We st Pa lme tto
  • E

a st Pa lme tto

  • L

inc o ln E sta te s

  • Sa nc tua ry Co ve
  • E

lle nto n

We st Pa lme tto L inc oln E sta te s

Palmetto Trail Opportunities

  • Ne ig hb o rho o d c o nne c tivity /

e c o no mic de ve lo pme nt

  • L

ink L inc o ln Me mo ria l Ac a de my to L inc o ln Co mmunity Pa rk

  • Pla nne d swimming c o mple x &

fo o tb a ll a me nitie s

  • L

e ve ra g e e xisting ML K T ra il a nd pla nne d impro ve me nts to Wa shing to n Pa rk

  • Pha se d a ppro a c h to

fa c ilita te imple me nta tio n

  • F

e d e ra l BUIL

D Gra nt

  • ppo rtunity
slide-11
SLIDE 11

5/21/2018 11

Palmetto Regional Trails Network: Phase 1

#1 (Pha se 1A):

Co nne c t L inc o ln Me mo ria l Ac a de my to L inc o ln Pa rk (impro ve tunne l unde r US 41)

#2 (Pha se 1A):

Co nne c t L inc o ln Pa rk to 17th St.

#3 (Phase 1B):

Co nne c t So uthe rn Oa ks c o mmunity to L inc o ln Pa rk

#4 (Phase 1C): Ope ra tio na l &

Sa fe ty I mpro ve me nts fo r US 41 & 17th Stre e t I nte rse c tio n

Palmetto Regional Trails Network: Phase 2

#5 (Pha se 2A):

T ra il c o nne c ting Ma rtin L uthe r K ing Jr. T ra il to 2nd Ave nue W.

#6 (Phase 2B):

E xte nsio n o f # 5 to L inc o ln Me mo ria l Ac a de my T unne l

slide-12
SLIDE 12

5/21/2018 12 Palmetto Regional Trails Network: Phase 3 (Study)

#7 (Study 1):

T ra il c o nne c ting Wa shing to n Pa rk to tra il syste m

Palmetto Regional Trails Network: Phase 4 (Study)

#8 (Study 2):

T ra il c o nne c tio ns to SUNT ra il

#9 (Study 3):

T ra il c o nne c ting Pa lme tto MCAT T ra nsfe r Sta tio n to Pa lme tto Yo uth Ce nte r

#10 (Study 4):

City/ CRA/ SUNT ra il c o nne c tio n to the Gre e n Bridg e with Busine ss 41 c ro ssing a t Rive rside Pa rk

slide-13
SLIDE 13

5/21/2018 13

Corridor Project Sheets

  • Pro je c t she e ts spe c ific to Pa lme tto :
  • US 41 Busine ss / 8th Ave nue W
  • US 41 / US 301
  • US 301 / 10th Stre e t
  • 7th Stre e t W
  • Pro je c t type s:
  • Pe de stria n
  • Bic yc le
  • Sa fe ty
  • T

ra nsit

  • Auto mo b ile

Corridor Project Sheets

slide-14
SLIDE 14

5/21/2018 14

MPO Short- & Mid-term Project Priorities

2018 Rank Facility (Project) Project Limits Improvement Description Next Phase Requesting Jurisdiction 17 Central Manatee Network Alternatives Analysis (CMNAA) from 26th St W to Braden River and 17th Ave W to 17th St W Implementation Bradenton, Manatee County, Palmetto

  • b. US 41/1st St, 3rd St W, US 41

BUS/9th St W at SR 64/Manatee Ave, 6th Ave, 8th Ave, 9th Ave Operational Improvements PE/CST Bradenton, Palmetto, Manatee County

  • b1. US 41/1st St

at SR 64/Manatee Ave, 3rd Ave, 8th Ave, and 9th Ave; Desoto Bridge south

  • f the limited access segment of US 301 S

Operational, Safety, Bicycle, and Pedestrian Improvements STUDY Bradenton

  • b2. 3rd St W

at 6th Ave/Manatee Ave and between 8th Ave W and 9th Ave W New Signal PE/CST Bradenton

  • b3. US 41 BUS/9th St W

at SR 64/Manatee Ave and from north 8th Ave/US 41 BUS to south of 8th Ave Operational, Safety, Bicycle, and Pedestrian Improvements PE/CST Bradenton

  • c. Multiple Locations

within CMNAA boundaries Safety Improvements PE Bradenton, Palmetto

  • c1. SR 64/Manatee Ave

from 24th St W to 24th St E Safety, Bicycle, and Pedestrian Improvements STUDY Bradenton

  • c2. US 41

from Lincoln Middle School to Lincoln Community Park Safety and Pedestrian Improvements PE Palmetto

  • c3. SR 64/Manatee Ave and 6th

Ave/Manatee Ave at Various locations Safety, Bicycle, and Pedestrian Improvements STUDY Bradenton

  • c4. US 41

at Desoto Bridge, US 41/US 301 and the US 41/US 19 Safety, Bicycle, and Pedestrian Improvements CST Palmetto

  • c5. US 41 Bus/14th St W

from Downtown Bradenton to US 41 south corridor, north of 8th Ave Safety, Bicycle, and Pedestrian Improvements CST Bradenton

  • d. Multiple Locations

within CMNAA boundaries Bicycle and Pedestrian Improvements PE Bradenton, Palmetto

  • d1. US 41 Bus/8th Ave W

from 12th St W to D‐Street Bicycle and Pedestrian Improvements STUDY Palmetto

  • d2. US 41 Bus/8th Ave W

at Riverside Dr and 8th Ave Bicycle and Pedestrian Improvements STUDY Palmetto

  • d3. 7th St W

from 2nd Ave to US 41 north and south; and from 20th Ave @ to 9th Ave W Pedestrian Improvements STUDY Palmetto

  • d4. US 301/10th St

at 8th Ave W and 2nd Ave W Bicycle Improvements PE/CST Palmetto

  • d5. 3rd Ave E

from SR 64/Manatee Ave, to the west by 10th St, to the east by 12th St and to the north by the Manatee River Multi Modal Capacity PE/CST Bradenton

  • c2. Safety and Pedestrian Improvements
  • c4. Safety, Bicycle, and Pedestrian Improvements
  • d1. Bicycle and

Pedestrian Improvements

  • d2. Bicycle and

Pedestrian Improvements

  • d3. Pedestrian

Improvements

  • d4. Bicycle

Improvements

MPO Short- & Mid-term Project Priorities (Palmetto)

slide-15
SLIDE 15

5/21/2018 15

Public Engagement

  • Sa ra so ta / Ma na te e CAC, BPT

AC Upda te s: Jun 5, 2017

  • Sa ra so ta / Ma na te e CAC Upd a te : Oc t 9, 2017
  • Co mmunity Outre a c h (St. Ma ry M.B. Churc h): De c 5, 2017
  • Ma na te e Cha mb e r T

ra nspo rta tio n Co mmitte e : De c 8, 2017

  • Bra de nto n F

a rme rs Ma rke t Bo o th: De c 9, 2017

  • Alte rna tive s Public Me e ting (Bra de nton): De c 12, 2017
  • Alte rna tive s Public Me e ting (Pa lme tto): De c 14, 2017
  • MPO Sc e nic Hig hwa y Co mmitte e : Ja n 2, 2018
  • E

a st Do wnto wn Bra d e nto n Wo rking Gro up: F e b 22, 2018

  • Ma na te e Cha mb e r Bo a rd o f Dire c to rs: F

e b 28, 2018

  • Pa lme tto T

ra ils Wo rking Gro up: Ma r 8, 2018

  • Ma na te e T

ig e r Ba y Club (b y MPO): Ma r 15, 2018

  • Pa lme tto T

ra ils Wo rking Gro up: Ma y 14, 2018

  • E

a st Do wnto wn Bra d e nto n Wo rking Gro up: Ma y 14, 2018

Community / Public Meetings

  • Ma na te e Me mo ria l Ho spita l: Ma r 24, 2017
  • T

ro pic a na : Jun 23, 2017

  • Mo to rwo rks Bre wing : Jul 21, 2017
  • L

E COM Pa rk: Jul 21, 2017

  • Bra d e n Ca stle Co mmunity Asso c ia tio n: Ja n 15, 2018
  • Rive ra Dune s HOA: F

e b 26, 2018

  • Pro pe rty Owne r Wilso n: Ma r 26, 2018

Property Owners / Neighborhoods Total: 64 meetings held to date since March 2017

  • I

ndividua l Me e ting s (14)

  • City o f Bra de nto n City Co unc il Upda te s (2)
  • City o f Pa lme tto City Co mmissio n Upd a te s (3)
  • Ma na te e Bo a rd o f Co unty Co mmissio ne rs (3)
  • Sa ra so ta -Ma na te e MPO Bo a rd Upda te s (2)
  • I

sla nd T PO Co mmitte e Upda te Pre se nta tio n

  • Ma na te e Bo CC Co unc il o f Go ve rnme nts
  • City o f Bra de nto n City Co unc il Wo rksho p
  • T

BART A Bo a rd Pre se nta tio n

  • CMNAA T

e c hnic a l Co o rdina ting Gro up Me e ting s (3)

  • Ma na te e Co unty Pub lic Wo rks Sta ff (2)
  • City o f Pa lme tto Me e ting Pub lic Wo rks (3)
  • City o f Bra de nto n Me e ting Sta ff (3)
  • Sa ra so ta / Ma na te e MPO T

AC Upda te s (2)

  • Ma na te e Co unty Are a T

ra nsit Me e ting (2)

  • Ma na te e Co unty Sc ho o ls
  • Ma na te e Co unty Pa rks & Re c re a tio n
  • L

inc o ln Me mo ria l Ac a de my

Public Engagement

Outreach to Elected Officials

  • Ma na te e Co unty Bo a rd o f Co unty Co mmissio ne rs – Ma y 22
  • City o f Bra de nto n Co unc il Me e ting – Ma y 23
  • Sa ra so ta / Ma na te e MPO Bo a rd – June 18
  • On-line interactive project overview & survey: https://bit.ly/2Hfly9b

Agency Staff Coordination Upcoming Meetings

slide-16
SLIDE 16

5/21/2018 16

Schedule to complete CMNAA Planning Study

  • Wra p-up o nline fe e db a c k surve y
  • L
  • c a l a g e nc y pa rtne r upda te s
  • Ma na te e Co unty Bo CC – Ma y 22
  • City o f Bra de nto n City Co unc il – Ma y 23
  • Do c ume nt a lte rna tive s a nd a na lysis
  • F

ina l upda te to MPO Bo a rd –June 18

CMNAA Planning Phase Wrap-up

  • Public e ng a g e me nt opportunitie s
  • Online surve y
  • Ag e nc y upda te pre se nta tio ns
  • Proje c t de live ra ble s
  • Co rrid o r Sa fe ty Aud its
  • Bic yc le Syste ms Pla n
  • Pro je c t Summa ry She e ts
  • BUI

L D Gra nt Applic a tio n

  • CMNAA Summa ry o f F

inding s & Re c o mme nda tio ns

  • Ag e nc y upda te pre se nta tions re ma ining
  • Ma na te e Co unty Bo CC – Ma y 22
  • City o f Bra de nto n City Co unc il – Ma y 23
  • Sa ra so ta / Ma na te e MPO Bo a rd – June 18
slide-17
SLIDE 17

5/21/2018 17

Questions?

https://bit.ly/2HfIy9b Interactive Online Survey Project Website http://www.swflroads.com/study/CMNAA/