PURPOSE
- Corridor identified in
Bicentennial Bikeways Plan (BBP)
- Summary of report
- Gather feedback
CLEVELAND AVE. FEASIBILITY STUDY August 2012 PURPOSE Corridor - - PowerPoint PPT Presentation
CLEVELAND AVE. FEASIBILITY STUDY August 2012 PURPOSE Corridor identified in Bicentennial Bikeways Plan (BBP) Summary of report Gather feedback EXISTING CONDITIONS Broad St. to Westerville Rd. Typically 4-lanes 10' - 11'
Existing 4-Lane Section Ultimate 4-Lane Section (requires 14' widening)
bikeway and Downtown Bikeway Connector
Sharrows (no parking)
route (parking)
bikeways
connectors
in Columbus Metro Bike Map
Dresden St. Bikeway
connectors