City of Rancho Cordova TM C P roject
- Lessons Learned
H ow a sm aller agency can be a leader to a sm arter region. Zach B osch, City of R ancho Cordova
City of Rancho Cordova TM C P roject - Lessons Learned H ow a sm - - PowerPoint PPT Presentation
City of Rancho Cordova TM C P roject - Lessons Learned H ow a sm aller agency can be a leader to a sm arter region. Zach B osch, City of R ancho Cordova 1. 1. I Intro Tim imelin ine Stakeh eholder ers Projec ect D Det
H ow a sm aller agency can be a leader to a sm arter region. Zach B osch, City of R ancho Cordova
➔ Tim imelin ine ➔ Stakeh eholder ers ➔ Projec ect D Det etails ➔ Nex ext S Step eps
cable
M anagem ent Center in City H all and the P olice D ept H Q.
Oro, Sunridge, & The R anch
priority. Tip
Plan for future needs, not just current infrastructure. Don't cut corners on cost.
Rio Del Oro 11,000 homes
Sunridge & The Ranch 9,300 homes
Tip
Look at existing agreements to update for new ITS elements.
By the end of this section, your audience should be able to visualize:
➔ Who ho
W hat is the pain you cure with your solution?
➔ Why hy
Show them a specific person who would benefit from your solution.
6 Highway 50 on-ramps/off-ramps within Rancho Cordova operated and maintained by County of Sacramento through cooperative agreement. He loved soccer, but feared he had no way to talk to a coach or teammates.
Tip
Build strong relationships with long standing personal on project.
12 hour hours/da day.
ntains ns Sacrament nto C
approxim imately 550 traffic ic sig ignals & & Cit ity of Ranc ncho ho Cor
dova’s 83 traffic signa nals.
manua nual traffic flus ush h dur during ng A AM & PM p peaks a along
Sunr unrise Blvd d (83,000 ADT ri river c r cro rossing).
ded d proj
nding ng persona
hroug
hout p proj
Tip
Good record keeping needs to be detailed and thorough. Equipment types, installation dates, maintenance records.
d staff de dedi dicated t d to
her stakehol holde ders i inc nclud ude:
FHWA
ncho P ho Pol
Depa partment nt
nto
uction C
(Pacific Excavation)
esign E Engineer eer (Kimley ey-Hor
n)
dent nt E Eng ngine neer ( (Salabe ber and A nd Assoc
Tip
A strong resident engineer helps guide the project to a successful conclusion managing multiple stakeholders by having a single point of contact.
By the end of this section, your audience should be able to visualize:
➔ Wha hat ot
her c cha halleng nges ot
her ha have you
n or
h whe hen i n ins nstalling ng ITS infra rastru ructure re?
W hat is the pain you cure with your solution? Show them a specific person who would benefit from your solution.
➔ 3 Major
nts of
proj
◆ Har ardwar are
Software
IT
Tip
Coordinate with paving
Plan for future development. Trench in bike lane if possible.
96 strand.
communications companies or provide municipal broadband service.
Tip
When trenching, add additional conduit if
cheap and allows for future fiber pulls at relative low cost.
installation and setup.
w ith Police Dept, Sheriffs Dept, etc.
intersections to provide m ore coverage
Tip
Train staff how to troubleshoot, program, diagnosis IT related issues prior to installation.
Tip
If performing night work
possible for major corridors, giving the team Saturday and Sunday to troubleshoot any issues prior to Monday morning commute.
Econolite Cobalt Controller
Processor (CVCP) module.
(SPaT)/MAP data messaging capabilities to provide a fundamental V2I component for connected vehicle applications.
Tip
Inform elected officials what the new systems can and cannot do. Build a relationship with your IT department.
room into Traffic Managem ent Center
from any w orkstation or connected laptop.
retention and MOE data.
Tip
Set up passive alerts system for important notifications for proactive and reactive responses to issues.
the data to one central program . ○ CCTV video, Alerts and Alarm s, CMS m essages, Travel tim e, Traffic Responsive signal tim ing SPaT.
from w ithin softw are ○ W hen com bined w ith CCTV’s, pow erful tool for incident response, traffic m anagem ent, etc.
By the end of this section, your audience should be able to visualize:
➔ Ci City ➔ Regiona
Show them a specific person who would benefit from your solution.
All future development will connect to newly installed fiber backbone. Overhaul of detection planned with future city funding. Automated Traffic Signal Performance Measures Regional plan for multi-jurisdictional TMC (Caltrans, County of Sacramento, Rancho Cordova, Folsom, City
Highway 50 ICM project in design Future technologies (AV/CV, DSRC, 5G)
Build confidence around your product or idea by including at least one of the these slides:
➔ Over erview ew ➔ Quest stions? s?
How can the audience get involved or find out more?
City of
ncho C ho Cor
Web ebsite e for C Current ent Projec ects -
www. www.cityof
nchoc
ernm nment/ public-works/ s/ plans-an and-projects
Zac ach Bosc sch - zbos
cityof
Spec ecial T Tha hank nks to:
Kimley-Horn Sacramento County Salabar and Associates