Chemainus Road Corridor Upgrade OPEN HOUSE PRESENTATION August 13, - - PowerPoint PPT Presentation
Chemainus Road Corridor Upgrade OPEN HOUSE PRESENTATION August 13, - - PowerPoint PPT Presentation
Chemainus Road Corridor Upgrade OPEN HOUSE PRESENTATION August 13, 2019 2 Introduce Municipal Staff David Conway Director of Engineering Don Stewart - Director of Parks and Recreation Barbara Thomas Manager of Engineering John DeHoop
Introduce Municipal Staff
David Conway – Director of Engineering Don Stewart - Director of Parks and Recreation Barbara Thomas – Manager of Engineering John DeHoop – Senior Engineering Technician Morgan McLeod – Development Planner Kara Labelle – Student Environmental Engineer
2
Agenda
5:00 pm – Refreshments 5:30 pm – Presentation 6:00 pm – Question and Answers
3
Purpose
To inform and consult with the residents, businesses and community representatives that are adjacent to Chemainus Road Corridor between Henry Road and Victoria Street regarding the installation of infrastructure and road upgrades to Chemainus Rd and the River Rd and Chemainus Rd roundabout.
4
Chemainus Town Centre Revitalization Plan
- Sewer, water and drainage replacement
- Lane width limited to prioritize pedestrians
and bicycles
- Street trees for traffic calming
- River Road and Victoria St roundabout
- Road improvement project for gateway
corridor into Chemainus
5
5 Key Project Areas
One of these areas was Streets and Lanes Under this area, Chemainus Rd identified as key road to improve Implementation Plan (part 4) for Chemainus Rd improvement called for: 1 2 3
Location
- Corridor Upgrade along Chemainus
Road between Henry Rd. and Victoria St.
- Chemainus Road is the transportation
spine for pedestrian and cyclists
- The roundabout at River Rd. and
Chemainus Rd. is under design.
- The intersection of Victoria St. and
Chemainus Rd. is under study.
6
Existing Roundabout Planned roundabout
Deliverables
Revitalization Plan 7 Corridor Upgrade
Sawmill ill Sawmill mill
Not to scale
Works Involved-North portion
Victoria St to River Rd Segment 8
Works Involved – South portion
River Rd to Henry Rd Segment 9
Street Furniture
- Decorative street lighting
- Benches
- Garbage receptacles
- Wayfinding signage
- Paver stones
- Grass and trees boulevard
areas on the east side
- Trees planted in the bump
- uts on west side.
- Irrigated Landscaping &
Gardens
- Tree lighting
10
Art Ideas
Consideration is being given to art projects:
- Kiosk wrap – Photo contest
- Footprints
- Open to ideas until Dec 31 2019
11
Construction Timing
We are here 12
Traffic and Pedestrian Management
during Construction
- Single lane
alternating traffic
- Expect delays
- Flaggers on
site to direct traffic and pedestrians
13
Traffic and Pedestrian Management
during Construction
- Possible pedestrian
detour route via CVRD Trail next to the railway
- Local traffic will
have access to residential and business driveways at all times.
- Contractor will
provide Traffic Management Plan
14
Project Updates
- Project webpage: www.northcowichan.ca/chemainusroad
- Contact:
Morgan McLeod, Development Planner morgan.mcleod@northcowichan.ca (250) 746-3190 David Conway, Project Manager david.conway@northcowichan.ca (250) 746-3136
15
Next phase: Mid-September 2019 – Tender awarded for underground works
Thank you for attending
16
Questions and Answer Session
17