SLIDE 1
Charge Compressor 2/3 Stage Fouling/High Vibration Johnny Dugas - - PowerPoint PPT Presentation
Charge Compressor 2/3 Stage Fouling/High Vibration Johnny Dugas - - PowerPoint PPT Presentation
Charge Compressor 2/3 Stage Fouling/High Vibration Johnny Dugas Senior Technical Associate DuPont Sabine River Works Orange, Texas Problem Significant performance loss and high vibration on the Charge Gas 2/3 stage compressor was
SLIDE 2
SLIDE 3
GB201 Compressor Train
SLIDE 4
2/3 Stage Compressor Cross-Section
SLIDE 5
2/3 Stage Vibration Trend
SLIDE 6
Frequency Spectrum
SLIDE 7
Restricted Orbit
SLIDE 8
Efficiency
SLIDE 9
Head
SLIDE 10
March 30th Interlock
SLIDE 11
Restricted Orbit (Rub)
SLIDE 12
2/3 Stage Vibration Prior to Oil Flush
SLIDE 13
SLIDE 14
SLIDE 15
Hard Rub
SLIDE 16
SLIDE 17
SLIDE 18
Summary
Performance loss and vibration was due to severe fouling. Severe fouling led to axial and radial rubs. Severe fouling was due to liquid carryover from suction drums. 2/3 stage compressor overhauled and returned to service Suction drum demisters upgraded to high efficiency.
SLIDE 19
Current Performance
65% 70% 75% 80% 11/9/04 2/17/05 5/28/05 9/5/05 12/14/05 3/24/06 7/2/06 10/10/06