CENTRALITY BUFALOTTA LOCATION SAXA RUBRA BUFALOTTA SANTA MARIA - - PowerPoint PPT Presentation

CENTRALITY BUFALOTTA LOCATION SAXA RUBRA BUFALOTTA SANTA MARIA DELLA PIET GRA EST BYPASS PIETRALATA MASSIMINA CENTRALITY ROME PONTE MAMMOLO SS1 AURELIA FM5 LINE TORRESPACCATA NEW PARK TOR MARANCIA OSTIENSE TOR VERGATA


slide-1
SLIDE 1

CENTRALITY

slide-2
SLIDE 2

URBAN CENTRALITIES VIABILITY PROJECT

LOCATION

GRA GRA

OSTIENSE

ROME

SANTA MARIA DELLA PIETÀ

SS1 AURELIA

EST BYPASS

SAXA RUBRA BUFALOTTA BUFALOTTA PIETRALATA PONTE MAMMOLO ROMANINA TORRESPACCATA TOR VERGATA

MASSIMINA CENTRALITY

FM5 LINE

NEW PARK TOR MARANCIA

EUR SUD CASTELLACCIO

RAILWAY

slide-3
SLIDE 3

North Rome

SS1 AURELIA

South Rome Rome Civitavecchia

MASSIMINA CENTRALITY Borgata MASSIMINA

The Massimina Centrality, with a territorial extension of approximately 112 acres, is situated inside the Roma – Civitavecchia railway and the street of Casal Lumbroso, the Via Aurelia and the Great Ring Road (GRA). Currently, the area, partly afgected by an abandoned gravel pit, is characterized by alternating valleys and ridges. The Massimina Centrality will pattern itself after the existing urban design

  • f the adjacent Borgata, which is 142

acres. The Project presents a low density index

  • f 0.2 sqm for every meter of territorial

surface, resulting in an additional 2,750 residences to the 10,000 already existing in the Borgata. The Massimina Centrality will have a unique identity characterized by schools, a civic center, an athletic center, a pool and a new urban park.

DETAILED LOCATION

GRA

NEW RAILWAY STOP FM5

slide-4
SLIDE 4

OPERATION

The General City Plan of Rome introduced new urban and metropolitan centralities. Massimina Centrality will be the one of fjrst implemented. It embodies the city- planning strategy of Rome, to integrate and balance urban and metropolitan areas with the target of redefjning a polycentric urban structure that is sustainable and accessible. The project has three major strategic

  • bjectives:
  • the creation of a new stop of the FM5,

which easily will reach the center of Rome, crossing the “line A” of the subway and the FM3 at Valle Aurelia, “line B” and the future “line D”;

  • connection to local roads with the great

link road and to the city center of Rome;

  • redevelopment/requalifjcation of the

Borgata turning it into a self-suffjcient – neighborhood. The Project of the Massimina Centrality is going to implement:

  • a comprehensive program of

environmental re-qualifjcation allowing for the relocation of the development rights that belong to the district of Tormarancia (in the Appia AnticaPark) to the new Massimina Centrality. In turn, this compensation freely assigns the area equipped as the Park to the Public Administration.

  • The recovery of an abandoned gravel

pit, that occupies an area of about 36 hectares, into the construction of a large public urban park, structuring element of the Centrality.

slide-5
SLIDE 5

URBAN CENTRALITIES VIABILITY EXISTING VIABILITY PROJECT

VIABILITY

P.D.Z VILLA PARADISO BORGATA DI MASSIMINA CASAL LUMBROSO VIA DI BRAVA LA BRAVA VILLA TROILI TENUTA RUBBIA

SS1 AURELIA KM13

MASSIMINA CENTRALITY

SS1 AURELIA SS1 AURELIA

B A

B GRA GRA A

FM5 LINE NEW RAILWAY STOP FM5

RAILWAY

slide-6
SLIDE 6

PROJECT PLANNING

slide-7
SLIDE 7

GENERAL FUNCTIONAL

slide-8
SLIDE 8

PUBLIC GREEN SPACE

slide-9
SLIDE 9

PUBLIC SERVICES

slide-10
SLIDE 10

PRIVATE SERVICES

slide-11
SLIDE 11

MEDIUM DENSITY BUILDINGS

slide-12
SLIDE 12

LOW DENSITY BUILDINGS

slide-13
SLIDE 13

SHOPPING CENTER

slide-14
SLIDE 14

PROJECT APPROVED

slide-15
SLIDE 15

PRIVATE INVESTMENTS

FOR INFRASTRUCTURE WORKS

Primary Infrastructure (Sewer, Power grid, Roads, Water supply) Total value € 57.284.154 Infrastructure costs table € 36.741.569 Total for applicants € 20.542.585 Secondary Infrastructure (School, Kindergarten, Swimming pool, Civic center) Total value € 15.940.994 Infrastructure costs table € 10.423.680 Total for applicants € 5.517.314 Infrastructures (New junction on the Aurelia, connecting to the GRA, New Railway Stop Massimina) borne entirely by private proponents € 46.387.810

Total is € 119.612.959: The total charges extratabellari for applicants amounted to € 72.447.709