Presen Presentation for: ion for: Broward County Board of County Commissioners B oward Co unty Board of Coun y Comm sioners V2114585P1 V21 585P1 CEI Services Transit Bus Stop Infrastructure Presented by: SOLID Consulting Engineers,


slide-1
SLIDE 1

Presentation for: Broward County Board of County Commissioners V2114585P1

CEI Services Transit Bus Stop Infrastructure

unty Board of Coun Presen y Comm V21 ion for: sioners 585P1 B oward Co

Presented by: SOLID Consulting Engineers, Inc. (CBE/SBE)

slide-2
SLIDE 2

COMPANY AND TEAM INFO

SOLID is a Broward County based firm, we have been in business since 2014. We are a Broward County CBE / SBE firm. SOLID is also a Certified FDOT Small business firm qualified in Categories 10.1 Roadway Construction Engineering Inspection and 10.3 Construction Materials Inspection. We currently have staff working in all of the Tri-county area within South Florida (Palm Beach, Broward, and Miami-Dade) in three different FDOT Districts: 4, 6 and Turnpike. We have added F&J Engineering Group Inc. as a sub- consultant to our team to fulfill the DBE requirement set by the Federal Transit Administration due to Federal Funds

  • participation. F&J is also a Broward County based firm holding

CBE certification.

slide-3
SLIDE 3

PROPOSED ORG CHART

slide-4
SLIDE 4

STAFF EXPERIENCE

OSVALDO “OSSIE” LARRAZABAL, PE, Principal-In-Charge/

  • QA. BSCE, Licensed PE. Over 16 years of experience in

several CEI projects for FDOT and multiple municipalities. His specific experience includes bus pads new construction and improvements, ADA Ramps and sidewalks, milling & resurfacing, full pavement reconstruction, new bridge construction, and existing bridge rehabilitation, drainage, lighting, signals, signing, and landscaping activities. GERARD FLEURGIN, CEI Senior Roadway Inspector

  • BSCE. Over 21 years of experience in CEI roadway and bridge
  • projects. Gerard has worked with multiple agencies FDOT,

NCDOT, ADOT and ODOT. Mr. Fleurgin has extensive material testing and sampling experience as well as quantities tracking and plans as-builts. He is very well versed in MOT inspection, earthwork, asphalt and concrete inspection as well as erosion control and signing activities. Gerard has worked on projects involving Bus Pads improvements or new construction.

slide-5
SLIDE 5

STAFF EXPERIENCE

MICHAEL DAVIS, CEI Roadway Inspector Mike has a high school degree and partial community college

  • education. Over 12 years of CEI experience working in roadway

and bridge projects. His experience includes inspection of projects with bus pads. Mr. Davis has been a QC manager and has vast material testing and sample as well as materials logging experience. He has extensive communication and computer skills and is detailed oriented. Areas of responsibilities include inspection of construction, MOT reviews, project coordination with contractor’s field personnel, and project field book and source document preparation. COREY KAZAKS, CEI Roadway Inspector 9 years of experience in road and bridge projects servicing various FDOT roadway projects in Districts 4 and 6 as a CEI roadway inspector, quality coordinator, and construction services manager. Mr. Kazaks has a strong inspection background with extensive experience in quality management of asphalt, soils, concrete materials, drilled shafts, and final estimates, especially as related to FDOT compliance.

slide-6
SLIDE 6

Firm Experience

  • Financial Number: 249614-3-52-01
  • Project Length: 7 miles
  • Project scope: Reconstruction of 7 miles of road,

bridge widening, bike path, sidewalk, ADA ramps, signal and lighting.

  • Start Date: February, 2015
  • Completion Date: December, 2017
  • Contractor: Odebrecht Co.
  • Construction Cost: $60 million
  • FDOT Project Manager: Jacqueline Sequeira,

P.E. Krome Ave from 8th St to Kendall Dr.

Currently 3 CSI’s with a total estimated savings of

  • ver $1.3 Million. Nominated to FTBA Award and

Davis Productivity Award.

slide-7
SLIDE 7

Firm Experience

  • Financial Number: 428726-1-52-01
  • Project Length: 1.8 miles
  • Project scope: Milling and resurfacing, new sidewalk

and ADA ramps. Special Bicycle markings.

  • Start Date: July 10, 2015
  • Completion Date: June 28, 2016
  • Contractor: Community Asphalt Corp.
  • Construction Cost:$3.6 Million
  • FDOT Project Manager: Hewrald Humes, PE.

FDOT D4 US 1 Improvements Project from Broward Boulevard to NE 17th Way in Fort Lauderdale

slide-8
SLIDE 8

Firm Experience

  • Financial Number: 427012-1-32-01
  • Project Length: 3.23 miles
  • Project scope: Milling and resurfacing, new sidewalk

and ADA ramps and Bicycle markings.

  • Start Date: November 23, 2015
  • Completion Date: December 22, 2016
  • Contractor: Community Asphalt, Corp.
  • Estimated Construction Cost: $4.14 million
  • FDOT Project Manager: Yveins Jean-Pierre, PE.

FDOT D4 Flamingo Road Improvements from north of Griffin Road to south of State Road 84

slide-9
SLIDE 9

Understanding of project

  • Contract duration is 2 years.
  • Task order driven.
  • Funded partially by FTA. Requires

EEO compliance and DBE Participation.

  • BCT’s routes cover over 410 square

miles with more than 41.5 million annual trips. Only bus system in the tri-county area servicing all 3 counties.

  • 327 fixed route buses, 44 different

routes, 78 community buses in partnership with 18 municipalities as well as contracted paratransit services for persons with disabilities.

slide-10
SLIDE 10

Firm’s Experience and knowledge of local codes.

  • Multiple contracts with bus stop
  • facilities. Familiar with governing

documents:

  • Florida Building Code: Accessibility

Standards.

  • Broward County Minimum Standards

classifies bus stops and bus shelters as miscellaneous facilities. Furthermore, it gives the Mass Transit division final approval authority on the facility.

  • Broward County Transit Design

Standards and Guideline manual.

slide-11
SLIDE 11

Project approach

  • Coordination and Communication.
  • Record Keeping / Inspection forms.
  • Onsite inspection.
  • MOT / Work zone safety.
  • Minimize impacts to the public.
  • Permit Compliance
  • Review of plans and contract

documents

slide-12
SLIDE 12

Use of Technology

Smartphones with Hotspot Cloud based system Real time communication

slide-13
SLIDE 13

Closing Statement

  • Personal commitment by SOLID’s owner.
  • Our team is highly experienced having worked in multiple CEI projects

all over South Florida.

  • Our team is pro-active in its management style.
  • Constant coordination with the EOR, Contractor and our client gives us

the ability to be adaptable to any situation.